What was decided
The application was approved as per officer recommendation, granting planning permission for a replacement waste transfer station building at Highview Farm. Report 1.1
The committee accepted the officer's conclusion that the proposal would not cause substantial harm to the openness of the Metropolitan Green Belt and falls within the NPPF paragraph 154 g) exception for previously developed land. Report 1.3, 7.21, 7.28
Extended hours of operation from 07:00 to 18:00 every day including weekends and bank holidays were approved, replacing the previous restricted hours. Report 3.1, 7.47
Why
The site forms part of an established waste management complex that has been in lawful operation since the early 1990s and is identified as previously developed land within the Green Belt. Report 1.2, 2.1, 7.5, 7.10
Although the replacement building would be larger (1,500 sqm footprint, 11m ridge height) than the existing structures (880 sqm total), it would remain within the existing developed cluster of buildings and would not extend into the open countryside. Report 7.14, 7.15, 7.19
Statutory consultees, including the Highway Authority, Environment Agency, Natural England, and Lead Local Flood Authority, raised no objection subject to conditions; a Noise Assessment confirmed extended hours would not cause unacceptable disturbance. Report 1.5, 7.49, 7.50
What happens next
Planning permission is to be issued subject to conditions set out in Appendix 1 of the report, covering hours of operation, vehicle movement limits, drainage, a Delivery and Servicing Plan and a Construction Logistics Plan. Report 1.6, 7.61, 7.51
An Environment Agency Environmental Permit separately regulates waste types, quantities and measures to prevent noise, dust and odour. Report 7.53
The money
- 50,000 tonnes per annum Anticipated throughput of replacement facility Report 3.4
- 75,000 tonnes per annum Throughput limit for the composting operations on the wider site Report 4.7
Options considered
- Chosen: Approve the application as recommended by officers. Compliant with Development Plan; no substantial harm to Green Belt openness; no objections from statutory consultees Report 1.6, 7.28
- Rejected: Refuse the application. Not supported by the planning assessment; no material considerations indicate a contrary decision Report 1.6
Implications
- Environment and climate: All waste handling activities would take place within an enclosed building, helping control noise, dust and odours and supporting movement up the waste hierarchy away from landfill. Report 1.4, 7.26, 7.52
- Legal: The proposal is treated as not inappropriate development in the Green Belt under NPPF paragraph 154 g) for previously developed land, and additionally satisfies the grey belt provisions in paragraph 155. Report 1.3, 7.21, 7.25, 7.29
- Risk: The site lies partly within Source Protection Zone 1; conditions are required to control penetrative foundation methods and prevent infiltration-based drainage to protect groundwater. Report P59
- Other: Increased HGV activity (around 1-2 additional movements per hour) is considered negligible in highway terms; a five-year collision review found no abnormal accident pattern. Report 7.58, 7.59
Who and where
- West London Composting Ltd, the site operator Report 2.1, 4.2
- Nearby residents including Highview Bungalow, Elm Tree Bungalow, Pylon Farm and Nos. 1-4 Newyears Green Lane Report 2.3
- Colne Valley Park representatives who commented on the application Report 6.1, P51
- West London Waste Authority, supporting the optimisation of waste management capacity Report P69, 7.48
Timeline
- July 2025: 11 neighbouring properties consulted on the application Report 6.1
- 13th August 2025: Public consultation period expired Report 6.1
- 21st April 2026: Hillingdon Planning Committee considered and approved the application
- 07:00-18:00 hours on all days including weekends and bank holidays: Proposed extended operating hours for the replacement facility Report 3.1, 7.47
Plain English for the jargon
- Metropolitan Green Belt: Designated protected open land around London where strict planning controls apply to prevent inappropriate development.
- Previously developed land: Land which has been lawfully developed and is occupied by a permanent structure and associated fixed surface infrastructure, as defined in Annex 2 of the NPPF.
- Grey belt: A category of land within the Green Belt (introduced in NPPF paragraph 155) where certain development may not be inappropriate, including previously developed land meeting specific tests.
- Very special circumstances (VSCs): Matters that can outweigh harm to the Green Belt and any other harm, to justify approval of inappropriate development in the Green Belt.