What was decided
The application was approved as per the officer recommendation, granting permission for the partial change of use of the existing hotel restaurant and construction of a new rear extension building providing additional hotel bedrooms, together with alterations to the car park and all associated works. Report 1.8
The hotel will increase from 80 to 117 bedrooms, a net increase of 37 rooms, including 36 new bedrooms in a three-storey rear extension and 4 rooms in the converted former Beefeater restaurant, with 3 existing rooms lost to access the extension. Report 1.1, 3.1
Why
The site is already in use as a hotel under a 2014 planning permission and the extension is an intensification of that existing use, with a reduced scale of 36 bedrooms (from an originally proposed 72) considered too small to be viable as a standalone hotel, so a sequential test was not required. Report 1.2, 3.2, 7.8
The design mirrors the scale, form and appearance of the existing hotel and the development would not harm the Uxbridge Moor Conservation Area or the setting of the Grade II listed General Elliot Public House. The nearest residential property is approximately 52 metres away, separated by the River Colne and dense screening, so there would be no adverse impact on residential amenity. Report 1.3, 1.4, 7.27, 7.30
The development is estimated to generate 174 fewer daily trips overall, mainly due to the loss of the restaurant use, and would not have a severe impact on the local highway network. Twelve disabled parking spaces and additional cycle parking would be provided. Report 1.5, 7.46, 7.47
What happens next
The decision is subject to planning conditions set out in Appendix 1 of the report and a Section 106 legal agreement, including a £28,088.91 payment in lieu of a construction employment training scheme towards creating training and employment opportunities. Report 1.8, P49
Conditions will require approval of materials, a Construction Management Plan, a Parking Design and Management Plan, a drainage strategy, a Fire Statement, a contamination scheme, an archaeological field evaluation, and compliance with British Standard 8233 for noise insulation, alongside biodiversity net gain delivery. Report 1.6, P42, P50, P51, P52, P55, P57, 7.36, 7.28
The money
- £28,088.91 Payment in lieu of construction employment training scheme, secured via Section 106 Heads of Terms Report P49
Options considered
- Chosen: Approve as per officer recommendation. On balance, the proposal is acceptable and consistent with the NPPF, the London Plan, and Hillingdon Local Plan Parts One and Two, subject to conditions and the Section 106 Heads of Terms. Report 1.7, 1.8
Implications
- Equalities: A minimum of 10% (4 rooms) of the 36 additional hotel bedrooms must be fully accessible to wheelchair user guests under British Standard BS 8300-1:2018, with a further 1% (1 room) fitted with a tracked hoist system. Report 7.52, P133, P134
- Environment and climate: Nine Category C trees would be removed with 34 replacement trees planted, achieving an Urban Greening Factor score of 0.3 in line with London Plan Policy G5. Biodiversity net gain of 10% is mandatory under the Environment Act 2021. Report 7.62, 7.63, 7.64, 7.67
- Other: Conditions cover land contamination, drainage with SuDS, air quality, noise impact, tree protection, aviation safety, biodiversity net gain, and a Construction Management Plan to control dust, vehicle movements and noise. Report 1.6, P42, P50, P52
- Risk: The Agent of Change principle applies: noise mitigation measures including façade design, glazing and sound insulation are required to ensure the hotel does not compromise surrounding 24-hour industrial uses within the Strategic Industrial Location. Report 7.33, 7.34, 7.36, 7.38
- Other: The Highway Authority requires a Parking Design and Management Plan to be approved before commencement, covering taxi pick-up and drop-off arrangements, disabled parking and cycle parking specification. Report P55, P56, 7.46
Who and where
- The applicant (Premier Inn / Whitbread) Report 1.1, 3.1
- The owner of the adjoining Strategic Industrial Land site (Pickering Properties Limited), who objected on employment land, sequential test, and agent of change grounds Report P42, P43, P44
- EDC Lord and Co, who objected on construction disruption grounds Report P42
- 25 neighbouring properties consulted, with two letters of objection received following the March 2026 revisions Report 6.1, 6.3
- Residents at 32 St Johns Close, the nearest property approximately 52 metres from the extension Report 1.4, 7.30
- Hotel guests and staff, who would use the retained 362sqm restaurant area Report 1.1, 3.1
Timeline
- May 2014: Original planning permission 56862/APP/2014/170 granted for the 80-bedroom Premier Inn hotel with associated restaurant, bar and meeting facilities Report 4.2
- February 2025: 25 neighbouring properties consulted and site notices posted on the original submission; no public comments received Report 6.1
- March 2026: Amended plans submitted reducing the extension from 72 to 36 bedrooms, retaining the Beefeater restaurant frontage, and increasing landscaping; site re-consulted and two objections received Report 3.2
- 2014: Field evaluation undertaken on the site found post-glacial natural deposits but minimal evidence for human activity Report P48, 7.28
- 14 July 2026: Hillingdon Planning Committee considered and approved the application as per officer recommendation
Plain English for the jargon
- PTAL: Public Transport Accessibility Level, a score from 0 to 6b indicating access to public transport; the site scored 1a, indicating very poor access.
- SIL: Strategic Industrial Location, a designation protecting land for industrial, logistics and related uses in the London Plan.
- Sequential test: A planning test requiring main town centre uses to be located in town centres first, then edge of centre, before out of centre sites are considered.
- Agent of Change: The principle that places responsibility for managing noise and other impacts from existing land uses on the proposed new development rather than on the existing use.
- Biodiversity Net Gain (BNG): A requirement for development to deliver a measurable improvement in biodiversity, set at 10% under the Environment Act 2021.
- Urban Greening Factor (UGF): A scoring system used in the London Plan to assess the amount and quality of urban greening provided by a development, with a target of 0.3 for commercial uses.