What was decided
The application was approved as per officer recommendation, subject to completion of a Section 106 agreement and the conditions in Appendix 1. Report 1.6
Permission was granted for demolition of the existing office building and construction of a 6-storey block of 31 flats, with one accessible car parking space, 67 long-stay and 4 short-stay cycle spaces, and private and communal amenity areas. Report 1.1, 3.1, 3.2, 3.3
The scheme is two storeys lower and provides seven fewer dwellings than the most recently approved scheme on the site (35810/APP/2024/1651), which itself has expired and is not treated as an extant fallback. Report 1.2, 4.2, 7.2, 7.30
Why
The site is allocated for residential development under Policy SA38 of the Local Plan, lies on previously developed land close to West Drayton Station, and the principle of residential redevelopment has been accepted through earlier permissions and a 2022 appeal. Report 1.1, 2.2, 7.1, 7.5, 7.6
The reduced height, light-brown brick palette, revised entrance and improved relationship with the adjoining Padcroft Works are considered acceptable in design terms, with detailed materials and finishes secured by condition. Report 1.2, 7.31, 7.32, 7.34
Daylight, sunlight, privacy, outlook, traffic, parking, noise, air quality, flood risk and fire safety impacts were tested and found acceptable, including through Section 106 obligations for highway works, parking-permit restrictions, cycle and car-club provision, and construction controls. Report 1.4, 1.5, 7.38, 7.41, 7.42, 7.43, 7.44
What happens next
The applicant must complete a Section 106 legal agreement securing the listed contributions and obligations before any decision notice is issued. Report 1.6, 1.4, 7.23
Early and Late-Stage Viability Reviews would be triggered through the Section 106 agreement, so any future surplus could capture an affordable housing contribution in lieu. Report 1.4, 7.20, 7.22, 7.23
A range of planning conditions, covering detailed materials, landscaping, contamination, noise, construction logistics, fire safety, Secured by Design, energy and piling method statement, will be imposed as set out in Appendix 1. Report 1.6, 7.32, 7.34, P91, P92, P95, P101, P102, P103
The money
- £29,134 Carbon-offset contribution Report 1.4, P5
- £41,500 Public open-space contribution Report 1.4, P5
- £94,417 Upfront affordable housing payment in lieu previously agreed on the most recent (now expired) permission under 35810/APP/2024/1651 Report 4.9, 7.21
- approximately £2.468 million Deficit against viability benchmark in the applicant's Financial Viability Assessment for the current scheme Report 7.19
- £160,855 Deficit figure agreed following the Council's independent viability review Report 7.20, 7.22
Options considered
- Chosen: Approve the application as recommended by officers. Scheme is considered to accord with the development plan read as a whole, with no material considerations indicating refusal, subject to Section 106 and conditions. Report 1.6
- Rejected: Refuse the application. Earlier reasons for refusal on this site were addressed at appeal; the current lower-scale scheme is supported by independent viability evidence and consultee responses. Report 4.2, 4.3, 7.20, 7.28
Implications
- Financial: No on-site affordable housing or upfront payment in lieu is being secured now because the independent viability review agreed a £160,855 deficit; any future surplus is to be captured through Early and Late-Stage Reviews in the Section 106 agreement. Report 1.4, 7.19, 7.20, 7.21, 7.22, 7.23
- Legal: Planning conditions in Appendix 1 and a Section 106 agreement must be completed; these cover highway works, permit restrictions, employment and construction training, carbon offset, public open space, car-club space, contamination, noise, construction logistics, fire safety, Secured by Design, energy and a Thames Water piling condition. Report 1.4, 1.6, P91, P92, P95, P96, P101, P102, P103
- Equalities: Every flat would meet the minimum internal floorspace standards and all dwellings would have private outdoor space, but there is no on-site affordable housing on this scheme. Report 1.3, 1.4, 7.18
- Climate: A £29,134 carbon-offset contribution is to be secured, and the development is otherwise substantially car-free with policy-compliant cycle parking and sustainable travel measures. Report 1.4, 1.5, P5
- Risk: Concerns from 36 objectors and a 29-signature petition from Padcroft Works residents on density, design, daylight, sunlight, privacy, outlook, traffic, parking, noise and fire safety were considered; conditions and Section 106 obligations are intended to address them. Report 1.6, 6.1, P73, P74, P75, P77, P79, P80, P82
Who and where
- Future residents of the 31 flats and their visitors Report 1.1, 3.1
- Residents of the adjoining Padcroft Works development (315 units), including Fitzroy Court and Yardley Court Report 2.2, 7.37
- Yiewsley/West Drayton town centre users, given proximity to West Drayton Station and the Elizabeth Line Report 2.1, 7.15
- Local highways network on Tavistock Road and surrounding streets Report P77, P96
- Thames Water's strategic sewer and wastewater network Report P103
Timeline
- 25th June 2021: Original 8-storey scheme under 35810/APP/2021/1234 was refused by the Council Report 4.2, P30
- 21st September 2022: Planning Inspector allowed the appeal against refusal of the original 8-storey, 32-unit scheme Report 4.3, P37
- 18 July 2025 and 21 July 2025: Conditions 6 and 12(A) of the previous permission 35810/APP/2024/1651 were discharged Report 7.2
- 30th April 2026: Neighbour consultation on the current application expired, with 36 objections and a 29-signature petition received Report 6.1, P69
- 14th October 2026: Hillingdon Planning Committee resolved to approve the current application
Plain English for the jargon
- PTAL: Public Transport Accessibility Level, a 1-6 score of how well a site is served by public transport; the site scores 3 on a moderate scale
- Section 106 agreement: A legal agreement between a developer and the local authority that secures planning obligations such as financial contributions, affordable housing reviews and on-site works
- Viability Tested Route: The process for schemes that do not meet affordable housing policy thresholds, where a Financial Viability Assessment is independently reviewed to decide what can be afforded
- Early and Late-Stage Viability Reviews: Mechanisms built into a Section 106 agreement that allow the council to re-test scheme finances partway through and at the end of a development to capture any uplift in affordable housing contribution
- Section 73 (s73) application: An application to vary or remove conditions attached to an existing planning permission