Resolved
RESOLVED – permission be granted subject to the conditions contained in the officer’s report.
Planning Committee decided this item on Tuesday 2 June 2015. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED – permission be granted subject to the conditions contained in the officer’s report.
Reference: 14/00660/FUL
Applicant: [name removed]: Hall Farm Main Street Newbold Verdon
Proposal: Erection of a 10 MW solar farm and associated infrastructure
RECOMMENDATION:- Grant subject to conditions.
Introduction:-
This application is to be considered at Planning Committee in accordance with the Scheme of Delegation, as the Chief Planning & Development considers it necessary to be determined by the Planning Committee.
Application Proposal
This application seeks full planning permission for the erection of a 10 MW photovoltaic solar farm. Electricity generated from the solar farm would be fed into the National Grid.
In addition to the photovoltaic panels, the proposed development includes associated infrastructure including inverter housings, grid connection housing, access tracks, security fencing and other minor works. Vehicular access to the site will be via the existing field access from Bosworth Lane.
The solar farm would be connected by underground cables to the 11 KV underground power line where it would be connected to the local distribution network.
The solar panels would be set at 15 degrees and would be mounted on a metal framework to a height of 2 metres above ground level. The proposed switchgear, inverter and transformer enclosures are proposed to a height of 2.6 metres. There would also be a small substation building and control room at a height of 3.5 metres. Meadow pasture would be established under and around the solar array and this would be managed by sheep grazing as a dual agricultural use for the land. A fence is proposed to surround the site. This would resemble deer fencing with wooden posts and mesh at a height of 1.8 metres.
Planning permission is sought for a 25 year period. After this period of time the site would be dismantled and returned back to its former agricultural use.
The initial proposal was for a 20.1 ha site area and 14.1 MW of generating capacity. Following discussions the proposal was subsequently reduced to 16.89 ha or 10 MW of generating capacity to reduce the visual impact of the proposal and to avoid development on grade 2 agricultural land.
The Site and Surrounding Area
The solar farm would occupy two adjacent arable fields in countryside to the south-west of Newbold Verdon. The site is 16.89 ha in size. The largest field would be to the south and the small field to the northwest. The largest field runs alongside the southern edge of a small wood known as Botany Bay Spinney.
Adjacent to the south of this field is an area of restored land from earlier workings of the Tilcon Quarry at Naneby Hall Farm. This large field is also restored land after quarrying. To the east there is a mix of pasture and arable fields and then Brascote Lane heading into the south of Newbold Verdon. The small field borders the western end of the north side of the larger field. This is to the west of Botany Bay Spinney and there are arable fields to the north and west.
Bosworth Lane runs north to south to the west and lies within a tree belt. The small field is low lying in a shallow valley, with the ground rising gently to the north and south. This field is largely enclosed by dense clipped hedges. Botany Bay Spinney continues the shallow valley bottom with the large field occupying the gently rising land to the south of this. The eastern end of this field drops into a similar but perpendicular shallow valley, before the land rises again towards Brascote Lane. The large field is enclosed by hedging to the west then hedging with trees and Botany Bay Spinney to the north. Its eastern edge follows a streamside with some hedging and trees, but with some open sections. The edge of the proposed solar installation stops some way short of this end of the field.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
14/00660/FUL: Hall Farm, Main Street, Newbold VerdonReport | 14 pages | DownloadRead as text |
Follow Planning Committee at Hinckley and Bosworth and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 17 Nov 2026 | 24/00610/OUT - Cadent, Brick Kiln Street, HinckleyRESOLVED – the application be deferred. | Deferred | Open |
| 20 Oct 2026 | 26/00096/FUL - Clares Barn Farm, 26 Sheepy Road, TwycrossRESOLVED - Planning permission be granted, with the Assistant Director Planning and Regeneration given powers to dete... | Decided | Open |
| 20 Oct 2026 | 25/01157/OUT - Land east of the Industrial Estate, Hill Lane, MarkfieldRESOLVED - Permission be granted, subject to: (i) The planning conditions detailed at the end of the report; (ii) The... | Agreed | Open |
| 20 Oct 2026 | 25/01192/FUL - EMEB Sports and Social Club, Nutts Lane, HinckleyRESOLVED – Planning permission be granted subject to: (i) The conditions set out in section 11; (ii) The completion o... | Agreed | Open |
| 20 Oct 2026 | 25/01231/FUL - Land off Church Road, WitherleyRESOLVED – the application be deferred. At this stage, Councillor C Gibbens exited the meeting having declared a regi... | Deferred | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.