RESOLVED – (i) Permission be granted subject to the conditions contained in the officer’s report with condition 5 amended to remove permitted development rights and an additional condition requiring details of landscaping to be submitted which was to include planting of native hedgerows; (ii) The Planning Manager be granted powers to determine the final detail of planning conditions.
Word for word from the decision Hinckley and Bosworth published for this meeting.Source: moderngov.hinckley-bosworth.gov.uk
Site: Land To The Rear Of Glebe Farm, 1 Rectory Lane, Nailstone, Nuneaton
Proposal: Conversion, extensions and change of use of existing barn to form one dwelling with associated curtilage and new vehicular access (20/00668/FUL resubmission)
1. Recommendations 1.1. Grant planning permission subject to: Planning conditions outlined at the end of this report. 1.2. That the Planning Director be given powers to determine the final detail of planning conditions. 2. Planning application description 2.1. The building is identified as a key unlisted building in the Nailstone Conservation Area Appraisal (2015) and due to its interest is considered to be a local heritage asset (a non-designated heritage asset in terms of the NPPF) 2.2. The proposal seeks to convert the existing dual pitched building and replace the mono-pitched roof with an extended dual-pitched roof, which due to the depth of this building would increase the ridge height to above the existing attached dual-pitched roof building. The footprint of the existing building would remain the same. 2.3. On the southern elevation the existing open frontage to the dual pitched building is to be filled with a glazed screen and on the extended building the open frontage is to be filled with fixed glazing panels, a main door and two sets of French doors flanked by timber panelling. All proposed fenestration is predominantly sited within the bays of the existing building. Interventions to the side elevations are limited to the re-use of an opening for a new window on the west elevation. 2.4. On the rear elevation current openings are limited to a single opening within the dual pitched roof building; this opening is to be filled with a full height window. New openings include two sets of French doors and two small windows for an en-suite and bathroom. New openings are positioned below the eaves and set under a timber lintel. Where new walls are required to be built up they are to be of red brick work to match the existing. 2.5. Plain roof tiles are proposed for the new roof to the extended building. The main door appears to be a timber planked door. A submitted Building Condition Survey has concluded that the buildings are structurally capable of conversion with only minor repairs required.
3. Description of the site and surrounding area 3.1. Within the Nailstone Conservation Area 3.2. The Old Rectory, a grade II listed building, is located approximately 50m south of the application building. 3.3. The application site is located on land at the rear of Glebe Farm at number 1 Rectory Lane in Nailstone. The site is in a predominately rural area with sparse pockets of residential zones. 3.4. The surrounding area is characterised by a mix of detached and converted properties of various ages and styles. The property itself is located at the back of a farmland. 4. Relevant planning history 19/01434/FUL Proposed conversion and extensions to existing barn to form one dwelling, construction of a garage and new vehicular access onto Occupation Road Withdrawn 10.03.2020
20/00668/FUL Proposed conversion, extension and change of use of an existing barn to one dwelling to include construction of a detached garage and access drive Refused 30.09.2020
The differences between the current scheme and that of the previously refused scheme (20/00668/FUL) will see the removal of a detached garage that was to sit on the boundary shared with The Rectory, furthermore, there will be no rooflights on the rear elevation facing north.
5. Publicity 5.1. There were 8 objections and 2 comments in support of the proposals, they are summarised below:
5.2Objections:
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.