Resolved
That the recommendations of the report be noted.
Chiswick Area Committee (Monitoring) noted this item on Wednesday 30 April 2003. Below is the council's own wording, with the papers it was decided on.
Resolved
That the recommendations of the report be noted.
Further to the Tidal Defence Manager’s previous RFDC papers of 20 May 1999, 19 November 1999 and 12 January 2001 the Committee is invited to note the progress on this project.
The Committee is asked to consider the contribution to London Borough of Hounslow for works to the failing flood defences at Strand on the Green and to approve a level of 70%.
1.1Strand on the Green tidal flood defences extend downstream from Kew Bridge to the railway bridge between Gunnersbury and Kew Gardens stations. This 1km of river walls is part of the north bank tidal defences of the Thames within the Chiswick Embayment. 1.2 The frontages protected by these defences include 73 residential and 4 commercial properties. Some of the flood defences are in poor condition whilst others have failed and require urgent works to prevent further deterioration and collapse. Some sections have had permanent repairs carried out whilst temporary works, in the form of sandbags, are provided at others. 1.3 Local residents, represented by the Strand on the Green Residents Association, took legal action in November 2000 against the London Borough of Hounslow (LBH). This action resulted in a Magistrates Court Order requiring LBH to enter into a partnership with the Agency and make safe their structures and flood defences at Strand on the Green. 1.4 Strengthening works have been carried out on some lengths of the floodwalls by LBH. The total costs incurred by LBH to date are in excess of £500k. 1.5 Over the last four years, the Agency’s emergency workforce (EWF) has also made temporary repairs to some sections of failed walls. These temporary repair works have cost the Agency approximately £100k. 1.6 Agency officers are working closely with LBH to ensure that adequate standards for maintenance of their flood defence structures are in place at all times. Permanent work carried out by LBH to reinforce existing structures has been subject to the Agency’s Planning and Development Control regulations.
2. Description Of The Flood Defences
2.1There are two forms of flood defence at Strand on the Green. The minority are a single masonry or brickwork wall extending from riverbed to crest, or statutory, level. The majority of the defences are formed by two separate structures. The first element is a low- level river wall founded on the foreshore. This lower defence is topped by a two-metre wide footpath that forms part of the riverside walkway owned and maintained by LBH. The second element is an upper level wall or other structure up to the statutory flood
1 defence level and above. This upper defence is formed by the walls of riverside residential or business properties or by separate structures (garden walls for example) owned and maintained by individual local residents and businesses. 2.2 The long-term integrity of these tidal flood defences is dependent upon the condition of both structures. Failure of a lower defence (which are generally in poor condition and deteriorating) would remove support to the walkway and if unattended to, would result in failure of the upper level defences and structures. 2.3 The riverside properties are at risk of being undermined or flooded should the lower walls give way. Some sections of the lower defence have failed recently and are supported by temporary works in the form of sandbags placed against the defence along the shoreline. 2.4 The public footpath running between the upper and lower stages of the flood defences is owned by LBH. Maintenance liability of the lower flood defences lies with LBH. 2.5 The owners of the upper defences have generally maintained their structures, but these defences are threatened by failure of the lower defences and footpath.
3. Pre-Feasibility Study
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Jan03 Strand on the GreenReport | 84 KB | DownloadRead as text |
PDF |
Strand on the Green River Wall UpdateReport | 85 KB | Download |
Follow Chiswick Area Committee (Monitoring) at Hounslow and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 12 Jan 2011 | Small Grant ApplicationThe Committee agreed to award the following grants: £500 to the Chiswick House Friends Summer Events £500 to the Roya... | Agreed | Open |
| 16 Mar 2010 | Small Grants Report - Applications Received.Resolved That the following grants be made; Brentford and Chiswick Girl Guiding, UK….£500.00 Chiswick House Friends……... | Decided | Open |
| 16 Mar 2010 | St. Georges Day 2010 Celebrations - Applications.It was agreed that if any applications were now received the Committee Chair would consider them and make a binding d... | Agreed | Open |
| 16 Mar 2010 | Dukes Meadows Transport and Access Strategy Update.Resolved ... view the full minutes text for item 17. | Decided | Open |
| 16 Mar 2010 | Update on Maintenance Management Plan for Street Trees in Chiswick.It was agreed that the issues raised were of sufficient (community) significance that members sought a report to a fu... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.