CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Hounslow
Chiswick Area Committee (Monitoring), Wednesday 30 April 2003 at 7.30pm

Strand on the Green River Wall Update

Noted Committee 2 papers

Chiswick Area Committee (Monitoring) noted this item on Wednesday 30 April 2003. Below is the council's own wording, with the papers it was decided on.

Item95

Resolved

That the recommendations of the report be noted.
Word for word from the decision Hounslow published for this meeting. Source: democraticservices.hounslow.gov.uk

Follow this further

Built from Hounslow's papers

What the report saysPro

Report to Chiswick Area Committee (Monitoring)

Recommendation

Further to the Tidal Defence Manager’s previous RFDC papers of 20 May 1999, 19 November 1999 and 12 January 2001 the Committee is invited to note the progress on this project.

The Committee is asked to consider the contribution to London Borough of Hounslow for works to the failing flood defences at Strand on the Green and to approve a level of 70%.

Background

1.1Strand on the Green tidal flood defences extend downstream from Kew Bridge to the railway bridge between Gunnersbury and Kew Gardens stations. This 1km of river walls is part of the north bank tidal defences of the Thames within the Chiswick Embayment. 1.2 The frontages protected by these defences include 73 residential and 4 commercial properties. Some of the flood defences are in poor condition whilst others have failed and require urgent works to prevent further deterioration and collapse. Some sections have had permanent repairs carried out whilst temporary works, in the form of sandbags, are provided at others. 1.3 Local residents, represented by the Strand on the Green Residents Association, took legal action in November 2000 against the London Borough of Hounslow (LBH). This action resulted in a Magistrates Court Order requiring LBH to enter into a partnership with the Agency and make safe their structures and flood defences at Strand on the Green. 1.4 Strengthening works have been carried out on some lengths of the floodwalls by LBH. The total costs incurred by LBH to date are in excess of £500k. 1.5 Over the last four years, the Agency’s emergency workforce (EWF) has also made temporary repairs to some sections of failed walls. These temporary repair works have cost the Agency approximately £100k. 1.6 Agency officers are working closely with LBH to ensure that adequate standards for maintenance of their flood defence structures are in place at all times. Permanent work carried out by LBH to reinforce existing structures has been subject to the Agency’s Planning and Development Control regulations.

2. Description Of The Flood Defences

2.1There are two forms of flood defence at Strand on the Green. The minority are a single masonry or brickwork wall extending from riverbed to crest, or statutory, level. The majority of the defences are formed by two separate structures. The first element is a low- level river wall founded on the foreshore. This lower defence is topped by a two-metre wide footpath that forms part of the riverside walkway owned and maintained by LBH. The second element is an upper level wall or other structure up to the statutory flood

1 defence level and above. This upper defence is formed by the walls of riverside residential or business properties or by separate structures (garden walls for example) owned and maintained by individual local residents and businesses. 2.2 The long-term integrity of these tidal flood defences is dependent upon the condition of both structures. Failure of a lower defence (which are generally in poor condition and deteriorating) would remove support to the walkway and if unattended to, would result in failure of the upper level defences and structures. 2.3 The riverside properties are at risk of being undermined or flooded should the lower walls give way. Some sections of the lower defence have failed recently and are supported by temporary works in the form of sandbags placed against the defence along the shoreline. 2.4 The public footpath running between the upper and lower stages of the flood defences is owned by LBH. Maintenance liability of the lower flood defences lies with LBH. 2.5 The owners of the upper defences have generally maintained their structures, but these defences are threatened by failure of the lower defences and footpath.

3. Pre-Feasibility Study

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Jan03 Strand on the GreenReport 84 KB DownloadRead as text
PDF
Strand on the Green River Wall UpdateReport 85 KB Download

At this meeting

Whole meeting

On this subject at Hounslow

Search all
  1. Strand on the Green River Wall UpdateThis decision
  2. Former Café Rouge, 85 Strand on the Green, ChiswickDecided
  3. CEX241 Consultation on draft Conservation Area Appraisals for Strand-on-the Green, Thorney Hedge, Gunnersbury Park, Wellesley Road, Kew Bridge, St Stephen's, St Dunstan's and for extension following earlier consultation on Bedfont GreenAgreed
  4. 69 Strand-on-the-Green, ChiswickApproved
  5. Kew Bridge Arches, Strand-on-the-Green, ChiswickAgreed
  6. CAS 502 - Response to the informal consultation exercise on the amalgamation of Strand on the Green Infant & Nursery and Strand on the Green Junior SchoolAgreed

More from Hounslow Chiswick Area Committee (Monitoring)

All decisions
MeetingDecisionOutcome
12 Jan 2011 Small Grant ApplicationThe Committee agreed to award the following grants: £500 to the Chiswick House Friends Summer Events £500 to the Roya... Agreed Open
16 Mar 2010 Small Grants Report - Applications Received.Resolved That the following grants be made; Brentford and Chiswick Girl Guiding, UK….£500.00 Chiswick House Friends……... Decided Open
16 Mar 2010 St. Georges Day 2010 Celebrations - Applications.It was agreed that if any applications were now received the Committee Chair would consider them and make a binding d... Agreed Open
16 Mar 2010 Dukes Meadows Transport and Access Strategy Update.Resolved ... view the full minutes text for item 17. Decided Open
16 Mar 2010 Update on Maintenance Management Plan for Street Trees in Chiswick.It was agreed that the issues raised were of sufficient (community) significance that members sought a report to a fu... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies