Wellington Road South/Hanworth Road Junction - Improvement to the Pedestrian Crossing Facilites.

Approved Planning 1 paper

Central Hounslow Area Committee (Planning) approved this item on Thursday 15 January 2004. Below is the council's own wording, with the papers it was decided on.

Item47

Resolved

Resolved – a) To approve both the informal and Statutory consultation on the proposals discussed in the report. b) To agree that if there are no adverse comments arising from the consultations, the scheme should proceed to implementation.
Word for word from the decision Hounslow published for this meeting. Source: democraticservices.hounslow.gov.uk

Follow this further

Built from Hounslow's papers

What the report saysPro

Report to Central Hounslow Area Committee (Planning)

Summary

This report details proposals for improvements to pedestrian crossing facilities at the junction of Wellington Road South with Hanworth Road and Nelson Road, and measures to reduce the problems of through traffic in St Helier’s Avenue.

Recommendations

2.1The Area Committee is recommended to: -

i) agree to both informal and Statutory consultation on the proposals discussed in the report; and,

ii) agree that if there are no adverse comments arising from these consultations, the scheme should proceed to implementation.

Background

3.1The junction of Wellington Road South with Hanworth Road and Nelson Road lies on the boundary of Hounslow and the London Borough of Richmond-upon-Thames. The presence of Heathlands School off Wellington Road South and the many bus services running through the junction, namely routes 20, H25, H28, 110, 111 and R62, result in the junction being extensively used by pedestrians but the crossing facilities on some arms of the junction are very poor and in need of improvement. 3.2 Consequently a bid was made to Transport for London as part of the Borough’s Sending Plan submission for funds to improve pedestrian conditions and this bid has secured funds of £200,000. A scheme has therefore been prepared and is discussed below. Drawings of the proposals will be displayed at the committee meeting. A reduced scale plan showing the layout of the proposed crossing facilities is included in Appendix A.

4.0PROPOSED SCHEME

4.1Wellington Road South – the northern arm of the junction. The existing triangular traffic signal island will be enlarged to accommodate pedestrians wishing to cross either Wellington Road South or Hanworth Road. In addition, a new central pedestrian refuge will be provided in Wellington Road South. New block paving with tactile paving for the visually impaired will be provided and pedestrian guard railings will be erected to protect and encourage pedestrians to use the defined crossing point. Red surfacing will be laid across the carriageways to define the crossing paths.

4.2Hanworth Road – the northeast arm at the junction. A new central pedestrian refuge will be constructed to assist pedestrians crossing this arm of the junction. Guard railings will be erected and tactile paving provided at the crossing points. Existing poor pedestrian footway surfacing will be replaced.

4.3Hanworth Road – the southwest arm at the junction. Modifications similar to those on the northern and northeast arms will be carried out.

4.4Nelson Road – the southeast arm at the junction. This arm falls in the London Borough of Richmond. Proposals for the scheme have been presented to and agreed by that Authority.

4.5Traffic signal phasing. To provide a safe period in which pedestrians can cross all arms of the junction, an ‘all red’ phase will be introduced in the traffic signal timings during which all traffic movement will be halted. The overall traffic signal timings at the junction will also be modified to reduce, as far as is possible, any increased delays to traffic movements

4.6Waiting and loading restrictions. These changes to the phasing increase the importance of ensuring that Wellington Road South traffic both approaching and leaving the junction is able to flow freely at all times. Whilst generally there is little on-street parking on this road, particular problems occur on Fridays associated with parking for the Mosque. It is therefore proposed that waiting and loading restrictions be introduced on both sides of Wellington Road South from the junction with Hanworth Road to the junction with Avondale Gardens. These will be effective on Fridays from 10:00am to 4:00pm. In addition, to ensure that the large car park behind the Mosque can be fully utilised at all times, it is proposed that ‘at anytime’ waiting and loading restrictions be introduced along this access road.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Wellington Road South/Hanworth Road Junction: Improvement to the Pedestrian Crossing Facilites.Report 1.2 MB DownloadRead as text

At this meeting

Whole meeting

On this subject at Hounslow

Search all
  1. Wellington Road South/Hanworth Road Junction - Improvement to the Pedestrian Crossing Facilites.This decision
  2. 64 Wellington Road North, HounslowRefused
  3. Planning Application Call-in 64A Wellington Road NorthDecided
  4. Rear of 191 Wellington Road South, HounslowRefused
  5. 90 Wellington Road North, Hounslow, TW4 7AADecided
  6. Staines Road (Wellington to Martindale)Approved

More from Hounslow Central Hounslow Area Committee (Planning)

All decisions
MeetingDecisionOutcome
10 Feb 2011 Petition - Alleyway Whitton Road, Hounslowa) That the repairs to the alleyway in response to the issues raised in the petition be noted. b) That the officers’ ... Noted Open
10 Feb 2011 266-268 Bath Road, HounslowThat planning application 00083/266-268/P4 for the change of use of 266 Bath Road from A2 (financial and professional... Decided Open
10 Feb 2011 15 Hollygrove Close, HounslowThat planning application 01706/15/P1 for the erection of a single storey rear extension at 15 Hollygrove Close, Houn... Approved Open
10 Feb 2011 89 Kingsley Road, HounslowResolved : That planning application 00667/89/P3 for the erection of a two-storey rear extension to the existing rest... Approved Open
10 Feb 2011 72 St Stephens Road, HounslowThat planning application 00992/72/P4 for the erection of a single-storey rear extension to be approved, subject to t... Approved Open