Results of Consultation for Route 423 Bus Stopping Facilities on Beavers Lane, Corporation Avenue and Barrack Lane
ApprovedPlanning6 papers
Central Hounslow Area Committee (Planning) approved this item on Thursday 22 January 2009. Below is the council's own wording, with the papers it was decided on.
a) That the new bus stop locations and bus stop clearways along Beavers Lane, Corporation Avenue and Barrack Road on Route 423, as described in the report, be approved. b) That Members be invited to take part in the consultation process for bus stop proposals, prior to a report being presented to Committee for approval.
Word for word from the decision Hounslow published for this meeting.Source: democraticservices.hounslow.gov.uk
Central Hounslow Area Committee - Planning – 22 January 2009
ROUTE 423 : PROPOSED BUS STOP IMPROVEMENT MEASURES ON BEAVERS LANE – CORPORATION AVENUE – BARRACK ROAD
Report by: Director of Environment
Summary This report presents the results of a public consultation exercise regarding the introduction of bus stop improvement measures and clearways along Beavers Lane, Corporation Avenue and Barrack Road on Route 423 and seeks Committee approval for implementation
1.0RECOMMENDATIONS That the Committee: 1.1 Notes the results of the recent consultation 1.2 Approves the new bus stop locations 1.3 Approves the bus stop clearway proposals
2.0BACKGROUND 2.1 London Buses and the Council have developed a joint scheme to alter the “hail and ride” route 423 service and convert it into a fixed service on the section between Salisbury Road and Barrack Road. The route 423 links Hounslow to Heathrow Terminal 5 and has a Monday to Saturday daytime frequency of 3 buses per hour in each direction.
2.2The proposals involve installing new bus stop waiting facilities at the following 9 locations. • Beavers Lane westbound (outside no. 96). A new bus stop and 25 metres long bus stop clearway. Details are shown in Drawing No. A4/423/4. • Beavers Lane eastbound (opposite no.60). A new Bus Stop on lamp column and a 25 metres long bus stop clearway. Details are shown in Drawing No. A4/423/5. • Beavers Lane westbound (outside no. 34 and opposite Cavalry Barracks). A new bus stop and 25 metres long bus stop clearway. Details are shown in Drawing No. A4/423/7. • Beavers Lane eastbound (opposite no.18) A new bus stop and 25 metres long bus stop clearway. Details are shown in Drawing No. A4/423/8. • Corporation Avenue northbound (outside no.11, south of Martindale Road). A new bus stop and 25 metres long bus stop clearway. Details are shown in Drawing No. A4/423/9. • Corporation Avenue southbound (outside no.14) New 25 metres long bus stop clearway at bus stop BP1691. Details are shown in Drawing No. A4/423/9. • Corporation Avenue northbound (outside no.39, north of Barrack Road) A new bus stop post and 25 metres long bus stop clearway. Details are shown in Drawing No. A4/423/10. • Barrack Road southbound (outside no.34, south of Laurel Gardens). A new bus stop post and 25 metres long bus stop clearway. Details are shown in Drawing No. A4/423/11. • Barrack Road northbound (outside no.7) A new bus stop post and 27 metres long bus stop clearway. Details are shown in Drawing No. A4/423/11.
3.0COMMENT 3.1 A site visit was held on Monday 21 April 2008 attended by London Buses and Council officials and locations for new bus stops and yellow bus clearways were identified on the ground.
3.2The intention is to introduce the measures early in 2009. New bus stop posts would be installed and bus stop clearways would be marked out to prevent parking at anytime. The cost of marking out each 25 metres long clearway is £250 and the total for all 9 bus stops is £2,250. Hounslow Transport Planning officer time to cover design, consultation and liaison with the public and London Buses amount to £1,350. Therefore the overall cost of the project is £3,600 and these charges would be reclaimed from the Transport for London bus stop accessibility budget for 2008/09.
Consultation 3.3 The consultation exercise was carried out to ensure that the proposal would, as far as possible, represent the wishes of the bus passengers as well as the local residents and businesses.
3.4A consultation letter and scheme plan was sent to local residents that would be affected by the proposals. Consultation letters were sent to 106 households on 17 September and comments were invited until 20 October 2008.
Consultation Outcomes 3.5 There were 17 responses received during the consultation process. This amounts to a response rate of 16%. All of the responses received objected to the proposed bus stopping measures in some form.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Central Hounslow Area Committee (Planning) at Hounslow and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.