Resolved - That the Director be authorised to undertake all necessary negotiations including seeking any necessary professional advice and enter into suitable agreements with Chiltern Railways to ensure that any works cause the minimum of disruption to the Authority’s operation.
Word for word from the decision Hounslow published for this meeting.Source: democraticservices.hounslow.gov.uk
1.1The Authority’s rail transfer station at Victoria Road South Ruislip was constructed during the late 1970’s and commissioned in 1980. The land upon which the site occupies is leased, currently via our railway services provider D B Schenker, from Network Rail.
1.2As part of the original construction works a new railway bridge was erected on the northern site boundary to provide a single track for the rail service between London Marylebone and Birmingham. In 1980 this service was operated by British Railways, but under rail privatisation is now provided by Chiltern Railways. The road passing beneath this bridge provides the sole vehicle and pedestrian access and egress for the transfer station and CA Site, as the site is bounded on all sides by railway lines.
2. Detail
2.1In December 2009 Chiltern Railway’s contacted the Authority and arranged a meeting where they advised of their proposals in connection with upgrading their line so as to improve the journey time between London Marylebone and Birmingham. The works are required as part of the arrangement for Chiltern Railways retaining their train operating company (TOC) franchise. Unlike most other railway infrastructure works, which are generally the responsibility of Network Rail, Chiltern Railways are permitted to procure the proposed works themselves. 2.2. Chiltern Railway’s proposals include works at a number of locations along the line between London and Birmingham. What is significant for the Authority are the plans to provide an additional track adjacent to the current single track where it runs along the embankment forming the northern boundary of the transfer station. As well as the works to widen, strengthen and stabilise the embankment, this element of the work will also require the existing bridge over the Authority’s access road to be removed and a wider bridge constructed. At the time of the December meeting Chiltern Railways and their consultants were still preparing the detailed plans of the works, together with the associated detailed programme. The estimate at that time was that they believe the works will take approximately 4 months to complete. Their current deadline is to have all works completed before the December 2010 timetable revision becomes effective.
2.3What is clear from the initial meeting is that Chiltern Railways will require access via the transfer station site to enable their contractor to undertake the works to the embankment and the bridge. It is also apparent that the contractor undertaking the works will be under a very tight timescale and extreme pressure if the works are to be completed by December 2010. However, Chiltern Railways are confident that with careful preparation, planning and co- operation of all the interested parties the impact of the works will be managed to ensure minimum impact upon operations.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.