CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
London Borough of Hounslow
Sustainable Development Committee, Thursday 23 February 2012 at 7.30pm

Wellington Primary School, Sutton Lane, Hounslow

Approved Committee 2 papers

Sustainable Development Committee approved this item on Thursday 23 February 2012. Below is the council's own wording, with the papers it was decided on.

Item126

Resolved

Approved.
Word for word from the decision Hounslow published for this meeting. Source: democraticservices.hounslow.gov.uk

Follow this further

Built from Hounslow's papers

What the report saysPro

Report to Sustainable Development Committee

SUSTAINABLE DEVELOPMENT COMMITTEE 23rd February 2012

Sam Collins e-mail: [email protected]

References: P/2011/3401 01095/D/S13

Address: Wellington Primary School, Sutton Lane, Hounslow

Ward: Heston Central

Proposal: Retrospective application for the erection of a new mobile classroom unit

Drawing numbers: PC-11-073/02

Received: 1st December 2011

Application received: 1st December 2011

This application is being put to Sustainable Development Committee as the application is being made by Corporate Property, on behalf of CSLL on a Council-owned site.

1.0SITE DESCRIPTION

1.1The site is on the western side of Sutton Lane, Hounslow, and measures approximately 1.06 ha in area. The site contains Wellington Primary School, which comprises a large, single storey school building, with a playing field to the north of the site and three large playground areas fronting Sutton Lane. The school playing field is designated as a Local Open Space.

2.0HISTORY

2.1The most recent planning history for the site is as follows;

2.201095/D/S10 Erection of one mobile classroom.

Approved 6th February 1997

2.301095/D/S11 Removal of two existing portable buildings and erection of single storey building incorporating linked walkway to existing school.

Approved 9th December 1999

2.401095/D/S12 Erection of a single storey extension comprising 5 classrooms to replace existing temporary classrooms to school.

Approved 25th July 2003

3.0DETAILS

3.1The mobile classroom unit (which has already been installed) is located to the south of the site, in the south east corner of the existing playground. Internally, the building is divided into two separate classrooms, with toilet and storage facilities. Both ramped and stepped access is provided to each classroom.

3.2The class room measures 17.0 metres in width and 8.0 metres in depth with a flat roof to a height of 3.20 metres. It is light green rendered to the exterior, with white uPVC windows and doors.

3.3At the time of the site visit, the class room had been installed.

4.0CONSULTATIONS

4.1Two site notices were placed at the site on 2nd December 2012. No responses were received.

5.0POLICY

Determining applications for full or outline planning permission

5.1When determining applications for planning permission, the authority is required to have regard to the development plan, so far as is material, and to any other material considerations. In addition, the determination must be made in accordance with the development plan unless material considerations indicate otherwise.

The Development Plan

5.2The Development Plan for the Borough comprises the Council's Unitary Development Plan (UDP), Employment Development Plan Document, Brentford Area Action Plan and the London Plan.

The emerging Core Strategy

5.3On 12 July 2011, the Council's Cabinet approved that the Core Strategy "Preferred Strategy" should go out to consultation. As emerging policy, the Local Planning Authority (LPA) considers that the emerging Core Strategy is capable of being a material consideration. Given that the emerging Core Strategy is still in the consultation stages, the LPA considers that in general limited weight can be given to it at this stage and that where a specific core strategy policy is engaged by an application greater weight may be attached.

The draft National Planning Policy Framework

5.4The consultation on the draft National Planning Policy Framework (NPPF) closed on 17 October 2011. The NPPF is not yet in force and may be subject to amendment. Nonetheless, as emerging policy, the Local Planning Authority (LPA) considers that the NPPF is capable of being a material consideration. As the Planning Policy Statements, Guidance notes and Circulars remain in place until cancelled and given that the NPPF may be subject to amendment, the LPA considers that very limited weight can be given to the NPPF at this stage. 6.0 PLANNING ISSUES

6.1The main planning issues concerning the case are:

• The acceptability, in principle, of the proposal

• The impact of the proposal on the street scene and the character of the area.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Wellington Primary School mapPlan 379 KB Download
PDF
Wellington Primary School, Sutton Lane, HounslowReport 81 KB DownloadRead as text

At this meeting

Whole meeting

On this subject at Hounslow

Search all
  1. Wellington Primary School, Sutton Lane, HounslowThis decision
  2. CA 455 - Outcomes of the formal consultation to expand Wellington Primary School for September 2017Agreed
  3. Wellington Primary School, Sutton Lane, HounslowApproved

More from Hounslow Sustainable Development Committee

All decisions
MeetingDecisionOutcome
29 Mar 2012 Land between 16 & 18 Brabazon Road and 15 & 17 Johnson Road, HounslowThat planning permission for planning application 00139/D/P1 for the development of the site within the Brabazon Esta... Approved Open
29 Mar 2012 3 Devonshire Road, ChiswickThat planning permission for planning application 00355/3/P1 for the change of use from A1 (retail) to A3 (restaurant... Approved Open
29 Mar 2012 Garage Block, Lateward Road, Brentforda) That planning permission for planning application 00681/ADJ12/P1 for the demolition of existing garage blocks and ... Approved Open
29 Mar 2012 Land rear of 2 & 3 De Havilland Road and land adjacent to 12 & 14 Cobham Road, HounslowThat planning permission for planning application 00340/B/P1 for the development of the site to provide 10 x 2 storey... Approved Open
29 Mar 2012 Brentford Football Club, Griffin Park, Braemar Road, BrentfordThat planning permission for planning application 00143/A/P50 for the extension of time for implementation of extant ... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies