SUSTAINABLE DEVELOPMENT COMMITTEE 23rd February 2012
Sam Collins e-mail: [email protected]
References: P/2011/3401 01095/D/S13
Address: Wellington Primary School, Sutton Lane, Hounslow
Ward: Heston Central
Proposal: Retrospective application for the erection of a new mobile classroom unit
Drawing numbers: PC-11-073/02
Received: 1st December 2011
Application received: 1st December 2011
This application is being put to Sustainable Development Committee as the application is being made by Corporate Property, on behalf of CSLL on a Council-owned site.
1.0SITE DESCRIPTION
1.1The site is on the western side of Sutton Lane, Hounslow, and measures approximately 1.06 ha in area. The site contains Wellington Primary School, which comprises a large, single storey school building, with a playing field to the north of the site and three large playground areas fronting Sutton Lane. The school playing field is designated as a Local Open Space.
2.0HISTORY
2.1The most recent planning history for the site is as follows;
2.201095/D/S10 Erection of one mobile classroom.
Approved 6th February 1997
2.301095/D/S11 Removal of two existing portable buildings and erection of single storey building incorporating linked walkway to existing school.
Approved 9th December 1999
2.401095/D/S12 Erection of a single storey extension comprising 5 classrooms to replace existing temporary classrooms to school.
Approved 25th July 2003
3.0DETAILS
3.1The mobile classroom unit (which has already been installed) is located to the south of the site, in the south east corner of the existing playground. Internally, the building is divided into two separate classrooms, with toilet and storage facilities. Both ramped and stepped access is provided to each classroom.
3.2The class room measures 17.0 metres in width and 8.0 metres in depth with a flat roof to a height of 3.20 metres. It is light green rendered to the exterior, with white uPVC windows and doors.
3.3At the time of the site visit, the class room had been installed.
4.0CONSULTATIONS
4.1Two site notices were placed at the site on 2nd December 2012. No responses were received.
5.0POLICY
Determining applications for full or outline planning permission
5.1When determining applications for planning permission, the authority is required to have regard to the development plan, so far as is material, and to any other material considerations. In addition, the determination must be made in accordance with the development plan unless material considerations indicate otherwise.
The Development Plan
5.2The Development Plan for the Borough comprises the Council's Unitary Development Plan (UDP), Employment Development Plan Document, Brentford Area Action Plan and the London Plan.
The emerging Core Strategy
5.3On 12 July 2011, the Council's Cabinet approved that the Core Strategy "Preferred Strategy" should go out to consultation. As emerging policy, the Local Planning Authority (LPA) considers that the emerging Core Strategy is capable of being a material consideration. Given that the emerging Core Strategy is still in the consultation stages, the LPA considers that in general limited weight can be given to it at this stage and that where a specific core strategy policy is engaged by an application greater weight may be attached.
The draft National Planning Policy Framework
5.4The consultation on the draft National Planning Policy Framework (NPPF) closed on 17 October 2011. The NPPF is not yet in force and may be subject to amendment. Nonetheless, as emerging policy, the Local Planning Authority (LPA) considers that the NPPF is capable of being a material consideration. As the Planning Policy Statements, Guidance notes and Circulars remain in place until cancelled and given that the NPPF may be subject to amendment, the LPA considers that very limited weight can be given to the NPPF at this stage. 6.0 PLANNING ISSUES
6.1The main planning issues concerning the case are:
• The acceptability, in principle, of the proposal
• The impact of the proposal on the street scene and the character of the area.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Wellington Primary School mapPlan | 379 KB | Download |
PDF |
Wellington Primary School, Sutton Lane, HounslowReport | 81 KB | DownloadRead as text |
Follow Sustainable Development Committee at Hounslow and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Mar 2012 | Land between 16 & 18 Brabazon Road and 15 & 17 Johnson Road, HounslowThat planning permission for planning application 00139/D/P1 for the development of the site within the Brabazon Esta... | Approved | Open |
| 29 Mar 2012 | 3 Devonshire Road, ChiswickThat planning permission for planning application 00355/3/P1 for the change of use from A1 (retail) to A3 (restaurant... | Approved | Open |
| 29 Mar 2012 | Garage Block, Lateward Road, Brentforda) That planning permission for planning application 00681/ADJ12/P1 for the demolition of existing garage blocks and ... | Approved | Open |
| 29 Mar 2012 | Land rear of 2 & 3 De Havilland Road and land adjacent to 12 & 14 Cobham Road, HounslowThat planning permission for planning application 00340/B/P1 for the development of the site to provide 10 x 2 storey... | Approved | Open |
| 29 Mar 2012 | Brentford Football Club, Griffin Park, Braemar Road, BrentfordThat planning permission for planning application 00143/A/P50 for the extension of time for implementation of extant ... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.