Bedfont, Feltham, Hanworth Area Forum noted this item on Thursday 24 January 2013. Below is the council's own wording, with the papers it was decided on.
Resolved – Members: Noted the contents of the report, and the work of officers to implement traffic improvement schemes in tandem with the maintenance and renewal programme being undertaken by Hounslow Highways; Approved the construction of a new footway along the southern side of Bedfont Road ( Stanwell ), as shown in Annex B, and permitted use by bicycles through its designation as a ‘shared use path’; Agreed that the footway on the southern side of Stanwell Road be designated as a ‘shared use path’; Agreed that officers proceed with the detailed design and consultation with local businesses; and Authorised officers, where possible, to resolve any objections received to the consultation and implement the scheme and, in the event of any objections remaining unresolved, agreed that the Chair of the Forum be given delegated authority to determine these objections.
Word for word from the decision Hounslow published for this meeting.Source: democraticservices.hounslow.gov.uk
1.1Notes the contents of the report, and the work of Officers to implement traffic improvement schemes in tandem with the maintenance and renewal programme being undertaken by Hounslow Highways;
1.2Approves the construction of a new footway along the southern side of Bedfont Road (Stanwell), as shown in Annex B, and permits use by bicycles through its designation as a ‘shared use path’;
1.3Agrees that the footway on the southern side of Stanwell Road be designated as a ‘shared use path’;
1.4Agrees that Officers proceed with the detailed design and consultation with local businesses; and
1.5Authorises Officers, where possible, to resolve any objections received to the consultation and implement the scheme and, in the event of any objections remaining unresolved, agrees that the Chair of the Forum be given delegated authority to determine these objections.
Background
2.1Hounslow Highways commenced work on their £100m, five year investment programme to renew the Borough’s footways, carriageways and street lighting on 1 January 2013.
2.2The carriageway of Bedfont Road (Stanwell) is due to be renewed during 2013. This provides an opportunity to construct the new footway at the same time as the carriageway works being undertaken by Hounslow Highways, thereby reducing disruption and cost.
2.3The existing footway and cycle paths on the southern side of Bedfont Road (Stanwell) are shown in Annex A. There is an existing footway along the northern side of the road, although this is in a poor state of repair and will need to be addressed by Hounslow Highways as part of their maintenance programme.
3.0DISCUSSION
3.1As can be seen from the plan in Annex A the footway is not continuous along the southern side of Bedfont Road. The provision of a continuous footway along the southern side would link the existing bus stops with the businesses on the southern side of the road. The need for a footway along this side of Bedfont Road is evident by the worn track along the grass verge, as shown in the photos below.
3.2As shown in Annex A there is currently a cycle track to the east of the Beacon Road Roundabout, which links the A30 Staines Road with Stanwell Road, and a segregated cycleway to the west of the Esso depot where Bedfont Road enters the borough of Spelthorne. The designation of the new footway as a ‘shared use path’ would create a useful link for cyclists.
3.3A shared use path is considered the most appropriate for this location given: a) The speed of traffic using the link is relatively high, which can be intimidating for cyclists using the carriageway; b) There is a relatively high proportion of large freight vehicles which also pose specific safety (both real and perceived) for cyclists; c) The carriageway width is too narrow, at circa 6.2m, for compliant (1.5m wide) cycle lanes to be provided and there is no cost-effective option to significantly widen the carriageway; d) A shared use path would provide a useful connection between two existing cycle facilities on the southern side of Bedfont Road; e) The route is broken by only three accesses into businesses to the south. This means that there will be few conflicts between users of the path and turning vehicles seeking to cross the path; and e) Flows of pedestrians and cyclists will be relatively low meaning conflicts between the two will be rare and mitigated by providing a 2.5m wide footway, which allows for a cyclists and pedestrian to pass each other with ease.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.