That planning permission for planning application 01636/3/P5 for the extension of third storey to provide additional floor of accommodation and stairwells, erection of a single storey pavilion to the rear and four detached energy modules to either end of the building, refurbishment of the exterior of the existing building at Building 3 Bedfont Lakes, 3 New Square, Bedfont be approved, subject to subject to the conditions set out in the report and the addendum report and the prior completion of a satisfactory S.106 agreement, highways agreements or unilateral undertaking, as set out in section 12.0 of the report and heads of terms set out in section 9.4 of the report.
Word for word from the decision Hounslow published for this meeting.Source: democraticservices.hounslow.gov.uk
1.1The proposed development would support the economic prosperity of the Borough by providing additional office space in a Key Office Location. The development would be of a high quality and sustainable design and would have no unacceptable impacts on the Borough’s Transport Network.
It is therefore recommended that Planning Permission be APPROVED subject to a Section 106 Agreement and conditions set out at Section 12.0
2.0SITE DESCRIPTION
2.1The site is located within the Bedfont Lakes Business Park which comprises seven office buildings located at the westernmost end of the Borough, to the south of Heathrow Airport. The office park was developed in the early 1990s. Bedfont Lakes was first a quarry and gravel works, and latterly, a landfill site prior to its development into the Business Park.
2.2Building 3 is a four storey office building (three office floors plus plant level) located on the westernmost plot in the southern portion of The Square. The building was occupied by IBM from opening until 2020 and was built to their specification.
2.3The site borders Bedfont Lakes Country Park, which is designated as Metropolitan Green Belt, and in part, a Site of Importance for Nature Conservation (SINC). The site is in an area of known land contamination from previous use.
2.4The Public Transport Accessibility Level (PTAL) is 1b (Very Low), however is accessible by London Buses routes H26 and 116, and dedicated shuttle buses between the site and Hatton Cross Underground Station and Feltham Train Station. The site has dedicated car parking for employees and visitors. 3.0 PLANNING HISTORY
3.100287/J/P2 Mineral extraction; creation of lakes; commercial, industrial and residential development; and construction of a link road. APPROVED: 13/05/1988 (and reserved matters applications thereunder)
3.201636/3/P1 Installation of a smoking shelter. APPROVED: 18/07/2007
3.301636/3/P2 Three storey extension to infill front of atrium of building plus installation of a new canopy. APPROVED: 16/08/20211
3.401636/3/P3 Relocation of smoking shelter. APPROVED: 10/04/2012
4.0DETAILS OF THE PROPOSAL
4.1Planning permission is sought for the provision of a further 738.5sqm (GIA) of office accommodation through the addition of the following spaces:
1. The Roof Pavilion: At third floor level, the existing plant room (404.51sqm) will extended to the front, rear and to both sides, and refurbished to provide an additional 372.5sqm of office floor area;
2. The Rear Infill: Designed to accommodate the main staircase, the infill of the rear light-well provides an additional 22.5sqm GIA;
3. The Glazed Link: Connecting the existing building with the pavilion, the glazed link provides an additional 22.5sqm GIA at ground/first & second floor levels (67.5sqm in total);
4. The Glazed Pavilion: The proposed single storey pavilion at the rear of the building provides an additional 276sqm GIA. In addition to serving as a breakout area for informal meetings and visitors’ lounge; and,
5. The existing central plant is replaced with 4 low energy modules (each 14.5sqm (GEA) in area) located next to the existing services risers, located either side of the existing escape staircases. The energy modules are clad in solid and louvered panels to match the existing cladding and will contain the plant and refuse and recycling stores.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.