CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Huntingdonshire District Council

Leisure Centres Annual Report

Noted Committee 1 paper

St Neots Leisure Centre Management Committee: expired April 2009 noted this item on Thursday 27 May 2004. Below is the council's own wording, with the papers it was decided on.

Item29

Resolved

RESOLVED that the contents of the for 2003/4 be received and noted.
Word for word from the decision Huntingdonshire published for this meeting. Source: democracy.huntingdonshire.gov.uk

Follow this further

Built from Huntingdonshire's papers

What the report saysPro

Report to St Neots Leisure Centre Management Committee: expired April 2009

ALL LEISURE CENTRE 24-28 MAY 2004 MANAGEMENTCOMMITTEES

LEISURE CENTRES ANNUAL REPORT (Report by Leisure Centres’ Co-ordinator)

1. ADMISSIONS

1.1Total paying public admissions for all Centres for 2003-2004 was as follows:

Sports Hall 238,052 16.9% Swimming 230,701 16.4% Fitness Studios 206,931 14.7% Miscellaneous (inc. spectators) 168,117 11.9% Synthetic & Outdoor Pitches 162,742 11.5% Swim Courses 102,631 7.3% Functions 98,614 7.0% Aerobic Classes 74,880 5.3% Swimming Clubs 40,108 2.8% Squash 35,490 2.5% Health Suite 33,750 2.4% Track (SILC outdoor only) 12,205 0.9% Rifle Range 5,959 0.4%

2003/04 1,410,180 2002/03 1,280,076 2001/02 1,301,696

Admissions exceeded 1.4 million for the first time ever, an increase of 8.3% on 2002/03. This despite the effects of prolonged building and maintenance work which occurred across the 5 sites. Centre Staff and Management are congratulated on their flexibility in continuing to provide the maximum number of activities at difficult times.

1.2Within the total there are significant gains and losses. The most relevant are:-

Sports Hall Activities + 20% More courses, better occupancy Synthetic & Outdoor Pitches + 20% Greater use

Fitness Studios + 5% Advantage Memberships increasing Swimming - 7% Protracted closure of RLC Swimming Courses - 8% Loss of 1 term lessons at RLC Health Suite - 23% Hot summer, health alerts

Rifle Range - 23% Decreased usage 1.3 Overall admission figures do not include 294,670 non-participants (enquiries, bar, café, vending).

1.4The total amount of all-inclusive admissions for the year is 2,060,192 an increase of 9.75%

2. STATISTICS

2.12000/01 2001/02 2002/03 2003/04 Card Holders 43,577 49,532 56,321 65,374 Anyone registered on our member database “Live” Members 13,189 14,193 15,065 15,079 Those who have visited in past 6 months 13 – 17 Members - - 4,026 5,030 Courts occupied 69.7% 60.6% 68.5% 69.2% Percentage of public courts used Swimmers per hour 25.1 22.0 21.2 21.4 Swimmers using pool during public times Accidents - 810 780 810 Accidents related to activities Non-accident related accidents - 113 37 47 Accidents not caused as a result of direct participation in an activity Pool Closures (hrs) - 639.5 459 166 Number of hours pool closed due to faults or repairs – excludes planned closures Cancelled Classes - 269.5 95 91 Classes cancelled due to unforeseen circumstances Overtime (hours) - 4,321 2,487 1,942 Sickness (days) - 467 409 404 Full days absence from contracted staff

3. KEY EVENTS

3.1Buildings & Equipment

The approval of the 5 year Condition Survey for the Leisure Centres has precipitated numerous building repairs and improvements across the District. This, coupled with other capital programme activities and general centre maintenance has seen the most proactive year in the Centres’ history. Listed below are examples of such work at each of the sites.

Automatic doors to Impressions - HLC Changing room improvements (pool) - HLC Changing room improvements (sports) - HLC Sports Hall floor re-varnished - HLC Gemini Suite re-decorated - HLC Offices re-modelled - HLC Car Park re-lined - HLC Air Handling Unit replaced - HLC New boilers (pool) - HLC Carpeting of corridors - HLC Reception re-modelled - HLC Spinning Bikes - HLC Air Conditioning – Gemini Suite - HLC New Signage - HLC All paintwork throughout building - SLC New flooring throughout - SLC Re-tiling Ladies Dryside - SLC New showers Dryside - SLC Fully equipped disabled suite and glazed entrance lobby - SLC New pool vac - SLC New chlorination system - SLC New signage - SLC

Pool Shower Boiler replacements - SNLC Pool Roof repairs - SNLC Resurface and drainage work to car park And access road - SNLC Digital CCTV to Dryside - SNLC Re-sealing Scarlet Suite floor - SNLC New blinds for Scarlet Suite - SNLC Upgrade emergency lighting to pool and Centre - SNLC Re-decorate Squash Courts - SNLC PIR’s in outside changing rooms - SNLC Replace Health Suite floor - SNLC Replace kitchen equipment (2x fridges and Dishwashers) - SNLC

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Leisure Centres Annual ReportReport 27 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

10 of 14 attended
CC
County Councillor Derek Arthur GilesPublic, expected
GD
Graham DolanPublic, expected
G
Mrs GwytherGuest, present
SB
Simon BellOfficer, present
MB
Councillor Mrs Barbara Elizabeth BoddingtonMember, present
DB
Dianne BreedonGuest, present
MJ
Councillor Mrs Jean ChandlerMember, present
JC
Mr Jonathon ClarkeGuest, present
PC
Peter CorleyOfficer, present
DA
Councillor Derek Arthur GilesMember, apologies
CC
County Councillor Mrs Sandra Anne GilesMember, present
HL
Helen LackSecretary, present

All 14 on the meeting page

On this subject at Huntingdonshire

Search all
  1. Leisure Centres Annual ReportThis decision
  2. Leisure centres - performance monitoring reportNoted
  3. Leisure Centres Management ArrangementsAgreed
  4. Leisure centres' restructuringApproved
  5. Leisure centres re-structuringApproved
  6. Leisure centres' annual reportNoted

More from Huntingdonshire St Neots Leisure Centre Management Committee: expired April 2009

All decisions
MeetingDecisionOutcome
2 Apr 2009 Termination of Joint CommitteesRESOLVED (a) that any balance remaining on the repairs and renewals fund on the closure of the separate accounts for ... Decided Open
12 Feb 2009 Leisure centre management agreementRESOLVED (a) that, subject to the approval of the recommendations in the attached report by the cabinet, a final meet... Approved Open
23 Oct 2008 Final Accounts Update 2007/08RESOLVED (a) that the Annual Governance Statement and the Letter of Representation be formally approved and signed by... Approved Open
23 Oct 2008 Free SwimmingRESOLVED that the contents of the report submitted be noted. Noted Open
24 Jul 2008 Final accounts 2007/08 and budget monitoring 2008/09RESOLVED that the final outturn position for 2007/08 and the current expected variations for 2008/09 be received and ... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies