Development Control Panel: changed to Development Management Panel - May 2009 approved this item on Monday 17 July 2006. Below is the council's own wording, with the papers it was decided on.

Item25

Resolved

RESOLVED (a) Extension to dwelling, 2 Fishers Close, Stilton – 06/01637/FUL that the application be approved subject to conditions to be determined by the Head of Planning Services to include 02/003 – time limit (3 years) and 05003 – extension to match. (b) Erection of new Operations Centre with associated parking, yard and plant, plots C and D Beaufort Park , Latham Road , Huntingdon - 06/01732/FUL (Councillor P J Downes declared a personal interest in the following item by virtue of his membership of the Customer First and Accommodation Advisory Group). (Councillor M Monk, The Stukeleys Parish Council, addressed the Panel on the application). ( i ) that the application be approvedsubject to conditions to be determined by the Head of Planning Services to include those listed in paragraph 8 of the report now submitted; and (ii) that the Head of Operations be advised of the Panel’s strong recommendation that other than those vehicles servicing the villages of Great and Little Stukeley , all vehicular traffic from the Operations Centre be routed via the A141, A14 or A1 trunk roads. (c) Erection of dwelling, land adjacent The Hoppings , High Street, Catworth – 06/01471/FUL that the application be approved subject to conditions to be determined by the Head of Planning Services to include those listed in paragraph 8 of the report now submitted. (d) Use of building for office, storage and repairs ancillary to use as a civil engineering contractors depot, use of land for parking and open air storage in association with a civil engineering contractors depot and retention of concrete forecourt, Ashley House, Conquest Drove, Farcet – 03/01953/FUL ( see Minute No. 22 for Members’ Interests). that the application be refused for the following reasons:- ( i ) the proposed development is considered to be contrary to policy P1/2 of the Cambridgeshire and Peterborough Structure Plan, 2003 and policy En17 of the Huntingdonshire Local Plan, 1995 and policy P8 of the Huntingdonshire Local Development Framework Core Strategy, 2006, approved for submission to the Secretary of State in that development in the countryside will be restricted to that which is essential to the efficient operation of local agriculture, horticulture, forestry, permitted mineral extraction, outdoor recreation or public utility services; and (ii) the remote location of the development results in additional motor journeys to the site, which are unsustainable and therefore the proposal is contrary to the policies and guidance which direct development to sustainable locations and seek to minimise the need to travel. The proposal is therefore contrary to policies P1/1 and P1/3 of the Cambridgeshire and Peterborough Structure Plan, 2003 and policies ... view the full minutes text for item 25.
Word for word from the decision Huntingdonshire published for this meeting. Source: democracy.huntingdonshire.gov.uk

Follow this further

Built from Huntingdonshire's papers

What the report saysPro

Report to Development Control Panel: changed to Development Management Panel - May 2009

AGENDA ITEM NO.

DEVELOPMENT CONTROL PANEL 17 JULY 2006

Case No: 0301953FUL (FULL PLANNING APPLICATION)

Proposal: USE OF BUILDING FOR OFFICE, STORAGE AND REPAIRS ANCILLARY TO USE AS A CIVIL ENGINEERING CONTRACTORS DEPOT, USE OF LAND FOR PARKING AND OPEN AIR STORAGE IN ASSOCIATION WITH A CIVIL ENGINEERING CONTRACTORS DEPOT AND RETENTION OF CONCRETE FORECOURT

Location: ASHLEY HOUSE, CONQUEST DROVE, FARCET PE7 3DH

Applicant: MR R RUDD

Grid Ref: 521263 293525

Date of Registration: 22.07.2003

Parish: FARCET

RECOMMENDATION - APPROVE

1. DESCRIPTION OF SITE AND APPLICATION

1.1The proposal is to retain a hardstanding and the use of a site in the countryside as a civil engineering contractor’s depot. The proposal also entails the retention of use of a two-storey store with a ground floor area measuring 18.5 x 12.4 metres (and additional space provided at first floor level) in association with the depot. The building is currently part used as offices and storage in association with the depot and part used for domestic storage in association with the adjacent house, Ashley House. Two members of staff are employed at the office.

1.2The applicant lives at Ashley House and operates the depot. He wishes to sever the use of the site from the house, which means that the part-domestic storage use of the building would cease if the application were approved.

1.3The applicant advises that the intention is to keep the vehicles off-site and working as much as possible and to, where possible, move the vehicles directly from one job to another rather than back to site. However, the vehicles may be returned to site for Christmas holidays for approximately two weeks, between tasks and if repairs are needed that cannot be undertaken elsewhere on the customers’ sites.

1.4Small amounts of storage of parts and equipment takes place both in the building and in the open air. The staff drivers may park their own vehicles on the site when collecting a business vehicle too. The applicant estimates that an average of one HGV visit may be made a week will be made, which may entail a long low-loader vehicle to carry other vehicles. The yard is part enclosed by galvanised fencing and tall leylandii although the boundary with the paddock is undefined.

1.5The proposed hours of business are 7.30am - 5.30pm Monday-Friday and Saturday 7.30-1pm with no operation on Sunday.

1.6The applicant has amended the plans to reduce the site area significantly to approximately 40 metres wide and 51 metres long. The amended plan now excludes much of the adjoining paddock and has agreed to relocate the access in order to improve access for the low-loader and to allow it to enter and leave and unload on the site, thus overcoming concerns about obstruction of the road and damage to the verges. The applicant has agreed to landscape the boundary between the site and paddock.

2. NATIONAL GUIDANCE

2.1PPS1 provides guidance on the operation of the plan-led system and seeks to minimise the need to travel.

2.2PPG4 seeks to balance development with environmental protection.

2.3PPS7 seeks to achieve sustainable development, which enhances the intrinsic qualities of the countryside but supports a range of economic activity in rural areas and encourages the reuse of appropriately located and suitably constructed buildings in the countryside.

2.4PPG13 locate developments in sustainable areas and considers traffic/highway implications.

2.5PPG18 gives advice on handling enforcement matters.

3. PLANNING POLICIES

3.1The following Policies of Cambridgeshire and Peterborough Structure Plan 2003 are relevant:

• P1/1 requires development to be restricted in areas minimising car travel.

• P1/2 restricts development in countryside, in flood plain and on higher grade land.

• P1/3 seek sustainability/quality/minimise the need to travel.

• P2/2 employment developments should reduce the need to travel by private car and maximise the use of buildings.

• P2/6 enables rural diversification and reuse of existing buildings.

• P7/4 relate sensitively to environment.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
0301953fulReport 23 KB DownloadRead as text
PDF
0601140fulReport 21 KB Download
PDF
0601232fulReport 26 KB Download
PDF
0601417Report 28 KB Download
PDF
0601732 jul06Report 20 KB Download
PDF
DEVELOPMENT CONTROLReport 14 KB Download

At this meeting

Whole meeting

Who was there

12 of 17 attended
MM
Councillor Mrs Madhabi BanerjeeMember, present
MB
Councillor Mrs Barbara Elizabeth BoddingtonMember, apologies
PL
Councillor Peter Leonard Ernest BucknellMember, apologies
ER
Councillor Eric Richard ButlerMember, present
DB
Councillor Douglas Bernard DewVice-Chair, present
PJ
Councillor Peter James Downes OBEMember, present
JD
Councillor Jeff DuttonMember, present
JA
Councillor John Ackerly Penhall EddyMember, apologies
JD
Councillor James Dudley FellMember, present
JA
Councillor Jonathan Alexander GrayMember, in attendance
CR
Councillor Colin Richard HyamsMember, present
PG
Councillor Peter Gerald MitchellChair, present

All 17 on the meeting page

On this subject at Huntingdonshire

Search all
  1. DEVELOPMENT CONTROLThis decision
  2. The transformation from development control to development management - changes to job titlesDecided
  3. Development Control PanelApproved
  4. Development controlApproved
  5. Development controlApproved
  6. Proposed service enhancements - the transformation from development control to development managementDecided

More from Huntingdonshire Development Control Panel: changed to Development Management Panel - May 2009

All decisions
MeetingDecisionOutcome
20 Apr 2009 Development controlRESOLVED (a) Erection of four floodlight columns and floodlights, informal open space, north-east of 46 High Street ,... Approved Open
16 Mar 2009 Development controlRESOLVED (a) Removal of Condition 9 of Reserved Matters Approval 07/02174/REM to allow floodlighting, land at Gifford... Approved Open
16 Mar 2009 S106 agreement advisory groupRESOLVED that Councillor J S Watt be appointed to the vacancy in the membership of the Section 106 Agreement Advisory... Agreed Open
16 Mar 2009 Exclusion of press and publicRESOLVED that the public be excluded from the meeting because the business to be transacted contains exempt informati... Agreed Open
16 Mar 2009 Change of use to gypsy site without planning permission, land 800 metres east of woodwalton nature reserve and south of harpers drove, ramsey heights, huntingdon - 09/00038/encaraRESOLVED that the approach outlined in the report now submitted be endorsed, namely the issuing of an enforcement not... Decided Open