CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Huntingdonshire District Council

PLANNING APPLICATION CONSULTATION - CREATION OF THE NEW TOWN OF NORTHSTOWE AND ASSOCIATED COMMUNITY AND HIGHWAY INFRASTRUCTURE WORKS

Decided Planning 1 paper

Development Control Panel: changed to Development Management Panel - May 2009 decided this item on Monday 25 February 2008. Below is the council's own wording, with the papers it was decided on.

Item68

Resolved

RESOLVED (a) that South Cambridgeshire District Council be advised that the District Council offers its support for and early delivery of the proposed development of a new town at Northstowe ; and (b) that, South Cambridgeshire District Council be encouraged to require, by condition, the submission of a construction traffic access scheme and in the event that such a scheme is provided, that the District Council be invited to participate in any consultation on the scheme content.
Word for word from the decision Huntingdonshire published for this meeting. Source: democracy.huntingdonshire.gov.uk

Follow this further

Built from Huntingdonshire's papers

What the report saysPro

Report to Development Control Panel: changed to Development Management Panel - May 2009

AGENDA ITEM NO.

DEVELOPMENT CONTROL PANEL 25 FEBRUARY 2008

PLANNING APPLICATION CONSULTATION – CREATION OF THE NEW TOWN OF NORTHSTOWE AND ASSOCIATED COMMUNITY AND HIGHWAY INFRASTRUCTURE WORKS (Report by the Head of Planning Services)

1. INTRODUCTION

1.1The purpose of this report is to inform the Panel that the Council has been formally consulted by South Cambridgeshire District Council, SCDC, who are the applicable Local Planning Authority, with regard to the submitted planning applications relating to the proposed development of the new town of Northstowe.

2. BACKGROUND INFORMATION

2.1The proposed development of a new town on this site has already been approved in ‘principle’ by RPG6 and the Cambridge Sub- Regional Study and it was formally allocated by the adopted Cambridgeshire and Peterborough Structure Plan 2003 and the SCDC Core Strategy 2007. Therefore these current proposals constitute an outline application for the creation of the new town and for the related new roads and road improvements (to both access the site and to improve the local junctions with the A14).

2.2The planning application for the new town proposes that some 427ha of land be developed; for residential purposes (delivering approximately 9,500 new homes with a planned population of some 24,000 new residents), to create new employment opportunities (for approximately 9,000 new jobs), and to deliver a new town and local centres (including retail developments), new schools, play and amenity spaces. It is intended that the retail offer in the town centre will develop over a period of 12 years from an initial foodstore to provide a range of comparison and convenience shopping equivalent to the space provided in a typical market town.

2.3The Cambridge to Huntingdon Guided Bus will pass through the site and provide for a strategic sustainable transport link.

3. IMPLICATIONS FOR HUNTINGDONSHIRE

3.1The successful delivery of the proposed new town development at Northstowe is considered to be a key element of the approved and adopted growth strategy for the Cambridge Sub-Region. The further delayed implementation of this part of the strategy would obviously place increasing pressures upon the surrounding districts to potentially accommodate additional growth. Accordingly it is considered important for the validity of the Huntingdonshire Core Strategy, specifically in terms of the ability of the district to readily accommodate the already implied levels of growth and for us not to be faced with unsustainable additional demands, that the development of Northstowe is now readily expedited. Therefore it is recommended that the Council offers positive support for the early delivery of the new town.

3.2Having regard to the details of the proposed development it is considered that there are two specific areas that may have further implications for Huntingdonshire:

• Both established policy and the proposed transport and vehicle access strategy proposes that the development is appropriately phased to ensure that sufficient highway capacity is available within the A14 corridor, to deal with the traffic generated by that phase, and that the guided bus scheme is successfully implemented. It will be important, to successfully mitigate the traffic impacts of the development, that both of these requirements are effectively complied with.

• Two Preferred Route Announcements have now been made by the Highways Agency relating to the A14 improvements with a view to starting construction late in 2010. In the vicinity of Northstowe, this will include a 3-lane dual carriageway from Fenstanton to the Girton interchange, limited junctions on the A14 and a parallel distributor road or roads for local traffic linking to the vehicle access strategy for the development

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
PLANNING APPLICATION CONSULTATION: CREATION OF THE NEW TOWN OF NORTHSTOWE AND ASSOCIATED COMMUNITY AND HIGHWAY INFRASTRUCTURE WORKSReport 69 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 16 attended
JD
Councillor Jason David AblewhiteMember, present
MM
Councillor Mrs Madhabi BanerjeeMember, apologies
MB
Councillor Mrs Barbara Elizabeth BoddingtonMember, present
PL
Councillor Peter Leonard Ernest BucknellMember, present
ER
Councillor Eric Richard ButlerMember, apologies
JD
Councillor Jeff DuttonMember, present
JD
Councillor James Dudley FellMember, present
PG
Councillor Peter Gerald MitchellChair, present
RP
Councillor Ray PowellMember, present
CJ
Councillor Christopher John StephensMember, present
PA
Councillor Phillip Andrew SwalesMember, apologies
GS
Councillor Gordon Sydney Edward ThorpeMember, present

All 16 on the meeting page

On this subject at Huntingdonshire

Search all
  1. PLANNING APPLICATION CONSULTATION - CREATION OF THE NEW TOWN OF NORTHSTOWE AND ASSOCIATED COMMUNITY AND HIGHWAY INFRASTRUCTURE WORKSThis decision
  2. Variation to Part 3 of the Constitution - Responsibility for Functions: Adoption of National Scheme of Delegation of Decisions on Planning ApplicationsApproved
  3. Development management - outline planning application with all matters reserved except for site access for construction of storage and distribution (use class b8), general employment (use class b2), bus depot (sui generis) floorspace with aApproved
  4. Outline planning application with all matters reserved except for site access for construction of storage and distribution (use class b8), general employment (use class b2), bus depot (sui generis) floorspace with ancillary offices and gateDecided
  5. Development management - other application - outline planning permission with all matters reserved for the construction of up to 120 homes (use class c3) with associated public open space, landscaping, play areas, surface water attenuation,Approved
  6. Development management - other application - details pursuant to condition 8 attached to planning permission 17/02308/out for tier 2 approval of key phase 2 framework comprising boundary plan, design code, regulatory plan, foul and surfaceApproved

More from Huntingdonshire Development Control Panel: changed to Development Management Panel - May 2009

All decisions
MeetingDecisionOutcome
20 Apr 2009 Development controlRESOLVED (a) Erection of four floodlight columns and floodlights, informal open space, north-east of 46 High Street ,... Approved Open
16 Mar 2009 Development controlRESOLVED (a) Removal of Condition 9 of Reserved Matters Approval 07/02174/REM to allow floodlighting, land at Gifford... Approved Open
16 Mar 2009 S106 agreement advisory groupRESOLVED that Councillor J S Watt be appointed to the vacancy in the membership of the Section 106 Agreement Advisory... Agreed Open
16 Mar 2009 Exclusion of press and publicRESOLVED that the public be excluded from the meeting because the business to be transacted contains exempt informati... Agreed Open
16 Mar 2009 Change of use to gypsy site without planning permission, land 800 metres east of woodwalton nature reserve and south of harpers drove, ramsey heights, huntingdon - 09/00038/encaraRESOLVED that the approach outlined in the report now submitted be endorsed, namely the issuing of an enforcement not... Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies