Resolved
RESOLVED a) that the report be received and noted, and b) that a report be submitted to a future meeting on the potential scope of a study into shopping facilities in the District.
Overview and Scrutiny Panel (Economic Well-Being) noted this item on Thursday 15 October 2009. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED a) that the report be received and noted, and b) that a report be submitted to a future meeting on the potential scope of a study into shopping facilities in the District.
Place Survey – Huntingdonshire District Council
Report of Findings
Prepared For: Huntingdonshire District Council
Prepared By: CELLO mruk research 114-115 Tottenham Court Road London W1T 5AH
Created By: Lisa Pearce Date: 20/04/2009
Reviewed By: Jean Black Date: 30/06/2009 Contents Page
1. Introduction 1
2. Executive Summary 2
3. Methodology 4
4. Key Findings 6
4.1National Performance Indicators 6
4.1.1 District Comparison 6
4.1.2 National & BVPI Comparisons 9
4.2Local Area 11
4.3Local Public Services 15
4.4Communications 29
4.5Local Decision Making 32
4.6Helping Out 34
4.7Getting Involved 35
4.8Respect and Consideration 37
4.9Community Safety 42
Appendix A Demographics for Huntingdonshire (weighted)48
Appendix B Technical Information 54
Sample 54
Questionnaire 54
Fieldwork 55
Data processing 55 Appendix C Guide to Interpreting the Data 57
Appendix D Selected Cross Tabulations 58 1. Introduction
This report presents the findings from the 2008 Place Survey conducted by CELLO mruk research on behalf of Huntingdonshire District Council.
The Place Survey is a statutory exercise that Central Government has specified must be undertaken by all local authorities every two years. The Place Survey replaces the Best Value User Satisfaction Survey that local authorities were previously required to undertake.
The new performance framework for local government includes a new National Performance Indicator set introduced from April 2008. This provides a single set of indicators common to all areas reflecting national priorities across government and replaces the former Best Value Performance Indicators. The national indicators have been designed to measure how well Government’s priorities are being delivered and within the set are 18 indicators (relating to citizen’s perspectives) that are to be collected through the new single Place Survey.
The Place Survey has been designed to capture local people’s views, experiences and perceptions, so that any proposed solutions and interventions for an area reflect local views and preferences. The survey is considered to be a key tool to track people’s changing perceptions, as a way of determining whether interventions made in an area result in a positive outcome for local people.
The Government prescribed in detail the minimum requirements for the conduct of the Place Survey and this information can be found in the Department of Communities and Local Government Place Survey 2008-09 Manual1. The minimum requirements are in place to ensure direct comparability of data across all local authorities, while allowing some flexibility on the contents of the questionnaire.
1 http://www.communities.gov.uk/documents/localgovernment/pdf/880021.pdf
CELLO mruk research: Place Survey – Huntingdonshire District Council Page 1 2. Executive Summary
In this section of the report, Huntingdonshire District Council’s performance on the 18 National Indicators measured by the Place Survey, are discussed and the key areas where the Council has done well, and conversely done less well than the County as a whole and by the national average.
County Comparison
Huntingdonshire District Council performed better than the County average on 11 out of the 18 National Indicators measured by the Place Survey however it should be noted that the differences are not significant:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
The Place SurveyReport | 646 KB | DownloadRead as text |
Follow Overview and Scrutiny Panel (Economic Well-Being) at Huntingdonshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 8 Dec 2015 | Zero Based Budgeting Update: Preparation for the 2016/17 Budget and Medium Term Financial StrategyRESOLVED that the Cabinet be recommended to include the savings proposals contained in Appendix 1 to the report now s... | Decided | Open |
| 8 Dec 2015 | Customer service strategyRESOLVED that t he Cabinet be recommended to approve the revised Customer Service Strategy. | Approved | Open |
| 8 Dec 2015 | Corporate fraud and prosecution policyRESOLVED that the Cabinet be recommended to: · approve the Fraud Workplan ; · approve the revised Prosecution Policy,... | Approved | Open |
| 8 Dec 2015 | Procurement policyRESOLVED that the Cabinet be recommended to approve the Procurement Policy. | Approved | Open |
| 8 Dec 2015 | Reserves reviewRESOLVED that the Cabinet be recommended to: · approve the Reserves Strategy; · endorse the minimum level of reserves... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.