Resolved

RESOLVED (a) Construction of new road following demolition of existing buildings, land between Brampton Road and Ermine Street, Huntingdon - 09/00872/ CAC and 09/00871/FUL ( Councillors P J Downes and M F Shellens addressed the Panel on the applications). ( i ) that application number 09/00872/ CAC and 09/00871/FUL be approved subject to conditions to be determined by the Head of Planning Services to include those listed in paragraph 8 of the report now submitted; and (ii) that the Head of Planning Services be authorised to refer application no. 09/00872/ CAC to Go-East should it be necessary to do so. (b) Retention of completed dwelling, not built fully in accordance with approved plans, together with proposed details of boundary treatment, Oakwood, Westwood Road , St. Ives - 09/01085/FUL ( [name removed], objector and [name removed] on behalf of the applicant, addressed the Panel on the application). that the application be approved subject to conditions to be determined by the Head of Planning Services to include early and effective hedge and boundary treatment. (c) Erection of wind farm, comprising eight wind turbines, sub-station, anemometry mast, access tracks and ancillary infrastructure, land south of Great Parlow Close, Graveley Road, Offord D'Arcy ( Councillor J Gimblett , the Offords Parish Council, Councillor D Richardson, Great Paxton Parish Council, Councillor K McConnell, Graveley Parish Council and [name removed], Toseland Parish Council, [name removed], Chairman of Cotton Farm Action Group and [name removed] on behalf of the applicant addressed the Panel on the application). ( i ) that the application be refused for the following reasons:- the proposed development will have an adverse effect on the landscape of the Grade 2* listed building of Toseland Hall. Whilst the wider environmental and economic benefits of this renewable energy project are considered to outweigh the effect on the landscape, the significant adverse effect of the proposed wind farm on the setting of Toseland Hall as a result of its proximity and visual intrusion is not outweighed by the benefits of the development. The proposal is, therefore, contrary to Planning Policy Guidance No. 15, Planning Policy Statement No. 15, policy ENV 6 of the East of England Regional Spatial Strategy, policy En2 of the Huntingdonshire Local Plan 1995, policy B7 of the Huntingdonshire Interim Planning Policy Statement 2007, policy CS1 of the Huntingdonshire Local Development Framework Core Strategy 2009 and Supplementary Planning Document Huntingdonshire Wind Power, 2006; and (ii) the proposal also fails to provide adequate information to properly assess the impact upon the moated site in Toseland Wood Scheduled Ancient Monument 27925 and it cannot, therefore be concluded that the benefits of the ... view the full minutes text for item 44.
Word for word from the decision Huntingdonshire published for this meeting. Source: democracy.huntingdonshire.gov.uk

Follow this further

Built from Huntingdonshire's papers

What the report saysPro

Report to Development Management Panel (Decommissioned 18/05/2016)

AGENDA ITEM NO.

DEVELOPMENT MANAGEMENT PANEL 16 NOVEMBER 2009

APPLICATIONS REQUIRING REFERENCE TO DEVELOPMENT MANAGEMENT PANEL (Reports by Planning Service Manager (Development Management)

Case No: 0802296FUL (FULL PLANNING APPLICATION)

Proposal: ERECTION OF WIND FARM COMPRISING EIGHT WIND TURBINES, SUBSTATION, ANEMOMETRY MAST, ACCESS TRACKS AND ANCILLARY INFRASTRUCTURE

Location: LAND SOUTH OF GREAT PARLOW CLOSE, GRAVELEY ROAD

Applicant: NPOWER RENEWABLES (FAO MS K GAULD-CLARK)

Grid Ref: 523582 264122

Date of Registration: 30.07.2008

Parish: OFFORD DARCY

RECOMMENDATION - REFUSE

1. DESCRIPTION OF SITE AND APPLICATION

1.1Cotton Farm extends to 179 hectares in size and is located to the north of Toseland village and to the west of Graveley. The site was used as an airfield in World War 2 and is therefore flat with few natural features. The site is at an elevation of 50 metres AOD and forms part of the plateau east of the Ouse Valley. Toseland, the nearest village is also at 50 metres AOD, although Graveley, in South Cambs, is around 40 metres AOD. Great Paxton and the Offords are around 10 metres AOD. Parts of Yelling to the east are around 50 metres AOD. Several of the runway tracks including the perimeter track are still in evidence on the site. The site is farmed intensively with arable crops. There is one unnamed brook on the site flowing out of the south west corner of the site, and four small water bodies located in a small area of woodland in the south west of the site. On the site there is one dwelling, Cotton Farm, and a number of farm buildings. There are no public rights of way within the site boundary.

1.2The application proposes the erection of 8 wind turbines with a total generating capacity of between 16 and 24 megawatts. The main components of the scheme are:

• Installation of 8 wind turbines with a maximum height to blade tip of 127 metres; • New site entrance off Toseland Road; • Construction of 1.1 km of new on site access tracks and the upgrading of 4.6 km of existing access track; • Construction of ancillary development including on site sub- station, crane hard standing areas, one external transformer adjacent to each turbine, connecting cabling and one permanent wind monitoring mast; • Creation of one temporary construction compound close to site entrance 1 and erection of one temporary guyed wind monitoring mast which will be in place during the construction period; and, • Proposals for habitat management.

Description of Turbines

1.3All the turbines would be a three bladed horizontal axis type. The stated height of 127 metres represents the maximum height and a turbine of this height would typically have a hub height of around 82 metres and a rotor diameter of 90 metres. The tower would be constructed from steel and the turbines are generally semi-matt pale grey. The turbines operate at a variable speed but typically would range from 8-20 revolutions per minute. The turbines have been positioned in two rows of four with access to each turbine coming off the existing perimeter track.

Associated Works

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
0802296FUL nov09Report 211 KB DownloadRead as text
PDF
0900033ENBOCReport 64 KB Download
PDF
0900758FULReport 89 KB Download
PDF
0900871FUL & 0900872CACReport 126 KB Download
PDF
0901085FULReport 89 KB Download
PDF
DEVELOPMENT MANAGEMENTReport 304 KB Download

At this meeting

Whole meeting

Who was there

14 of 16 attended
JD
Councillor Jason David AblewhiteMember, present
MM
Councillor Mrs Madhabi BanerjeeMember, present
MB
Councillor Mrs Barbara Elizabeth BoddingtonMember, present
ER
Councillor Eric Richard ButlerMember, present
WT
Councillor William Terence CloughMember, present
DB
Councillor Douglas Bernard DewMember, present
JD
Councillor Jeff DuttonMember, present
PG
Councillor Peter Gerald MitchellChair, present
CJ
Councillor Christopher John StephensMember, apologies
PA
Councillor Phillip Andrew SwalesMember, present
MM
Councillor Ms Mandy Jayne ThomasMember, present
GS
Councillor Gordon Sydney Edward ThorpeMember, present

All 16 on the meeting page

On this subject at Huntingdonshire

Search all
  1. DEVELOPMENT MANAGEMENTThis decision
  2. Application requiring reference to the development management committee - change of use of site to coach depot and workshop and erection of security fencing - wansford railway station, old great north road, stibbington, peterborough - 25/01775/fulDecided
  3. Development management - outline planning application with all matters reserved except for site access for construction of storage and distribution (use class b8), general employment (use class b2), bus depot (sui generis) floorspace with aApproved
  4. Application requiring reference to development management committee - two-storey extension and refurbishment of leisure centre to include new swimming pools, fitness suites, the relocation of an artificial pitch, new racket courts, car parkApproved
  5. Application requiring reference to the development management committee - outline application with all matters reserved except for access via peterborough road for the demolition of 107 peterborough road, and the development of up to 185 dwDecided
  6. Application requiring reference to the development management committee - proposed 2 no. replacement dwellings and 1 no. detached double garage - 3 sheepwalk cottages, oundle road, elton, peterborough - 25/01436/fulDecided

More from Huntingdonshire Development Management Panel (Decommissioned 18/05/2016)

All decisions
MeetingDecisionOutcome
18 Apr 2016 The use of land as a private gypsy and traveller caravan site consisting of 4 pitches each of which would comprise of 1 No. Mobile home, 1 No. Touring caravan, one small amenity building, hardstandings, foul drainage; creation of new access and track way - Kym Stables, Kimbolton Road, Hail Weston.RESOLVED that the application be approved subject to conditions set out in section 8 of the December 2014 report but ... Approved Open
18 Apr 2016 Proposed Amendment to the Scheme of Delegation in relation to the making and confirming Tree Preservation Orders. Objection to Tree Preservation Order L/TPO/381 - 15 Hunts End, Buckden.RESOLVED that the contents of the report be noted and the Scheme of Delegation amended as follows: (a) the Head of De... Noted Open
18 Apr 2016 Appeal decisionsRESOLVED that the contents of the report be noted. Noted Open
14 Mar 2016 Removal of Condition 3 of Planning Permission 15/00417/FUL, variation of Condition 4 for hours of Cafe opening to be from 7:00 a.m.RESOLVED that, the application be approved and the Planning Service Manager (Development Management) be authorised to... Approved Open
14 Mar 2016 Appeal decisionsRESOLVED that the contents of the report be noted. Noted Open