DRAFT PROPOSED SUBMISSION - DEVELOPMENT MANAGEMENT DPD
DecidedCommittee3 papers
Development Management Panel (Decommissioned 18/05/2016) decided this item on Monday 18 January 2010. Below is the council's own wording, with the papers it was decided on.
RESOLVED that Members be invited to forward their comments on the Draft Proposed Submission: Development Management DPD to the Planning Service Manager (Policy) by 31st January 2010 in advance of the submission of the proposed policies to the Cabinet and Council in February.
Word for word from the decision Huntingdonshire published for this meeting.Source: democracy.huntingdonshire.gov.uk
Report to Development Management Panel (Decommissioned 18/05/2016)
2 Mitigating and Adapting to Climate Change Huntingdonshire LDF | Development Management DPD: Proposed Submission 2010
Sustainable Design
Policy C 1 Sustainable Design
All development proposals should take account of the predicted impact of climate change over the expected lifetime of the development.
Development layouts, building design and landscaping should demonstrate how the proposal:
a. uses sustainable building methods and verifiably sustainable, locally sourced materials where practicable; b. maximises energy efficiency through the use of materials with high thermal efficiency; c. maximises the benefits of passive solar gain to provide natural heating and lighting; d. minimises overshadowing; e. promotes natural ventilation, cooling and shading; f. incorporates resilient indigenous species as part of landscaping schemeswhich are resilient to the predicted impacts of climate change; g. Makes the most efficient use of water resources; and h. ensures that water run off levels are maintained at pre-development levels wherever possible through the use of permeable surfaces, sustainable drainage systems, green roofs and other water management features.
Residential development will be expected toshould comply with standards as set out in the Code for Sustainable Homes (CSH) or any successor such that upon delivery homes will be certified are built to at least CSH level 3 or equivalent.
Non-residential development will be expected toshould comply with applicable Building Research Establishment Environmental Assessment Method (BREEAM) standards or any successor such that upon delivery buildings will be certified are built to at least BREEAM 'Very Good' or equivalent.
2.7Development will need to be designed to withstand the predicted impacts of climate change to ensure that throughout a buildings anticipated lifespan it is practical and comfortable for users. Developers should also seek to minimise further emissions of CO2 during the construction and operational phases of development.
2.8The CSH is intended to deliver stepped improvements in energy and water efficiency, facilitate fewer CO2 emissions, less waste and pollution and more sustainable lifestyles. Phased changes in building regulations are intended to result in all homes built from 2016 having zero net CO2 emissions which means that renewable energy technologies associated with the home must be capable of putting at least as much energy back into the national grid as is taken out to run the home. This will rarely be achievable through on site measures alone so there is a role for 'allowable solutions' in achieving higher levels of the CSH.
2.9A similar sustainability code to that for residential buildings is expected for non-residential buildings. Until such time as a national code for non-residential buildings is forthcoming, the various BREEAM standards are expected to be used by applicants when developing proposals.
2.10This area of policy has seen rapid change, reflecting advances in technology and developing experience and expertise, and is likely to continue to do so. It is anticipated that in reviewing such changes the Council will supplement this policy and further specify what is expected.
2 Mitigating and Adapting to Climate Change 2 Huntingdonshire LDF | Development Management DPD: Proposed Submission 2010
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Development Management Panel (Decommissioned 18/05/2016) at Huntingdonshire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.