Resolved
RESOLVED that the Cabinet be recommended to agree and note the current progress with the development of both the Cambridgeshire Long Term Transport Strategy and the refresh of Local Transport Plan 3.
Overview and Scrutiny Panel (Environmental Well-Being) agreed this item on Tuesday 15 July 2014. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the Cabinet be recommended to agree and note the current progress with the development of both the Cambridgeshire Long Term Transport Strategy and the refresh of Local Transport Plan 3.
This report outlines the work that is on-going in developing a Long Term Transport Strategy for Cambridgeshire, including Huntingdonshire, based on providing an integrated network that will support the projected growth across the County.
The work to date includes assumptions that a new A14 will be delivered, as well as major improvements to the A428 between Caxton Gibbet and the A1 Black Cat.
Localised work is indicating that growth in Huntingdon will put the A141 under particular strain as well as routes into and out of St. Ives, even with a new A14 built. A possible new A141 will be considered as well as a new link road between Hartford and Godmanchester.
In addition to road-based options, the plan seeks to build on the success of the Guided Busway by providing a high quality dedicated public transport corridor between St. Ives and Peterborough by serving planned developments at RAF Wyton and Alconbury Weald and linked to a possible new rail station on the East Coast Main Line at Alconbury Weald. Linkage would also be provided to Huntingdon. A further corridor is considered appropriate between St. Neots and Cambridge.
The refresh of the Local Transport Plan 3 (LTP3) will look to ensure that all strategies are up to date with a major update to the Implementation Plan to ensure that this properly reflects those schemes delivered since the Plan was first approved in 2011.
Recommendation(s):
Recommended that Cabinet agrees and notes the current progress with the development of both the Cambridgeshire Long Term Transport Strategy and the refresh of Local Transport Plan 3 This page is intentionally left blank 1. WHAT IS THIS REPORT ABOUT/PURPOSE?
1.1The purpose of this report is to note progress on developing a Draft Long Term Transport Strategy (LTTS) for Cambridgeshire as well as an update on the Local Transport Plan (LTP3), both of which have been subject to public consultation until 11th July 2014.
1.2The District Council is a partner to this process and is required to respond to this current consultation.
2. WHY IS THIS REPORT NECESSARY/BACKGROUND
2.1The draft LTTS seeks to provide an integrated network enabling efficient and reliable travel across Cambridgeshire and beyond. As well as improvements to all travel modes, particularly rail, bus, walking & cycling, a key ambition is to improve accessibility on the strategic road network by addressing key constraints such as the A14 and A428 and other key routes across the County.
2.2The Strategy has been developed to support projected growth in all emerging Local Plans, including Huntingdonshire, and includes Action Plans for setting out key infrastructure requirements. These include schemes already planned for delivery, such as the A14, those that support major development, additional schemes not currently programmed but needed to provide new capacity, as well as further schemes that may be required to support longer- term growth. Those for Huntingdonshire are shown at Annex A.
2.3The LTTS does recognise that major investment will be needed and that not all challenges can be addressed at the same time so further work will be needed over time to develop options and a package of funding opportunities.
3. OPTIONS CONSIDERED/ANALYSIS
3.1The modelling undertaken to date includes the assumption that a new A14 will be delivered and that the A428 will be dualled between Caxton Gibbet and the A1 Black Cat, the latter which is emerging as a capacity constraint in the Highways Agency ‘Route Based Strategy’ work that is due to report to Government in March 2015.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
CAMBRIDGESHIRE LONG-TERM TRANSPORT STRATEGY & LOCAL TRANSPORT PLAN 3 REFRESHReport | 130 KB | DownloadRead as text |
PDF |
LTTS & LTP Report 140717 Annex AAppendix | 1.5 MB | Download |
Follow Overview and Scrutiny Panel (Environmental Well-Being) at Huntingdonshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Nov 2015 | Overview and scrutiny panel structureRESOLVED a) that Option 2 as detailed in the report now submitted be endorsed as a new structure for the Overview and... | Decided | Open |
| 10 Nov 2015 | Workplan studiesRESOLVED that Councillors [name removed] , D A Giles, T D Sanderson and R J West be appointed to the Impact of the Co... | Decided | Open |
| 10 Nov 2015 | Overview and scrutiny progressDecision Digest would no longer be printed with the Agenda but would be circulated electronically. The Panel would co... | Decided | Open |
| 16 Jun 2015 | Operations reviewIt was agreed that the Panel will receive regular updates regarding the Operations Review; through quarterly updates ... | Agreed | Open |
| 16 Jun 2015 | Recap updateIt was agreed that RECAP updates will be reported to the Panel as and when they are received. | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.