Resolved
RESOLVED that the application be approved subject to conditions to be determined by the Head of Development to include those listed in paragraph 8 of the report now submitted.
Development Management Committee approved this item on Monday 15 October 2018. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the application be approved subject to conditions to be determined by the Head of Development to include those listed in paragraph 8 of the report now submitted.
DEVELOPMENT MANAGEMENT COMMITTEE 17 OCTOBER 2018
Case No: 18/01712/FUL (FULL PLANNING APPLICATION)
Proposal: DEMOLITION OF A SHED AND CONSTRUCTION OF A DWELLINGHOUSE AND MEANS OF ACCESS (RESUBMISSION OF PLANNING APPLICATION 17/00170/FUL)
Location: GROVE COTTAGE MALTING LANE ELLINGTON PE28 0AA
Applicant: MR TYSOE
Grid Ref: 516231 272000
Date of Registration: 17.08.2018
Parish: ELLINGTON
RECOMMENDATION - APPROVE
This application is referred to the Development Management Committee as the applicant is a District Councillor and the proposed development represents a departure from the Development Plan.
1. DESCRIPTION OF SITE AND APPLICATION
1.1This application relates to a parcel of land adjacent to Grove Cottage, Malting Lane, Ellington (a Grade II listed building: 1317379).
1.2The application site fronts Malting Lane and is currently used as amenity land for Grove Cottage. The A14 lies to the north of Grove Cottage and an open field to the east. Thrapston Road lies to the south of the application site, with the village of Ellington beyond.
1.3To the west of the application site is a complex of buildings which have been the subject of a number of 'prior approval' notifications to change the use from B1a office to residential (17/00900/P3JPA) and B8 storage use to residential (17/00898/P3PPA and 17/00899/P3PPA). A pumping station is located approximately 30m to the northwest of the application site.
1.4The proposal is for the demolition of a shed, the erection of a dwelling and the construction of a means of access.
2. NATIONAL GUIDANCE
2.1The National Planning Policy Framework (24th July 2018) (NPPF 2018) sets out the Government's planning policies for England and identifies three overarching objectives (economic, social and environmental) to be pursued in mutually supportive ways in order to contribute to the achievement of sustainable development.
2.2Paragraphs 10 and 11 of the NPPF 2018 identify a presumption in favour of sustainable development. 2.3 NPPF 2018 replaced NPPF 2012 in July 2018. HDC submitted their Local Plan on 29 March 2018. Transitional arrangements are in place for Local Planning Authorities which submitted Local Plans for examination prior to the 29 January 2019 to ensure consistency. Accordingly, NPFF 2012 objectives and policies will continue to be relevant.
3. PLANNING POLICIES
3.1Saved policies from the Huntingdonshire Local Plan (1995) • EN2: Character and Setting of Listed Buildings • EN9: Conservation Areas • EN17: Development in the Countryside • EN18: Protection of Countryside Features • EN20: Landscaping Scheme • EN22: Nature and Wildlife Conservation • EN25: General Design Criteria • H23: Housing Outside Environmental Limits • H31: Residential Privacy and Amenity Standards • T18: Access Requirements for New Development • T19: Footpath provision in New Development
3.2Saved policies from the Huntingdonshire Local Plan Alterations (2002) • HL5: Good Design and Layout • HL10: Housing Mix
3.3Adopted Huntingdonshire Local Development Framework Core Strategy (2009) • CS1: Sustainable Development in Huntingdonshire • CS3: Settlement Hierarchy • CS10: Contributions to Infrastructure Requirements
3.4Huntingdonshire's Local Plan to 2036: Proposed Submission 2017 (as amended March 2018 for submission) • LP1: Amount of Development • LP2: Strategy for Development • LP3: Green Infrastructure • LP4: Contributing to Infrastructure Delivery • LP6: Waste Water Management • LP10: Small Settlements • LP11: The Countryside • LP12: Design Context • LP13: Design Implementation • LP15: Amenity • LP16: Surface Water • LP17: Sustainable Travel • LP18: Parking Provision and Vehicle Movement • LP26: Housing Mix • LP32: Biodiversity and Geodiversity • LP33: Trees, Woodland, Hedges and Hedgerows • LP36: Heritage Assets and their Settings
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Development Management: Other Application: Demolition of a shed and construction of a dwellinghouse and means of access (resubmission of planning application 17/00170/FUL): Grove Cottage, Malting Lane, Ellington, Huntingdon: 18/01712/FULReport | 1.6 MB | DownloadRead as text |
Follow Development Management Committee at Huntingdonshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 21 Sep 2026 | Appeal decisionsRESOLVED that the contents of the report be noted. | Noted | Open |
| 17 Aug 2026 | Appeal decisionsRESOLVED that the contents of the report be noted. | Noted | Open |
| 20 Jul 2026 | Application requiring reference to the development management committee - change of use of site to coach depot and workshop and erection of security fencing - wansford railway station, old great north road, stibbington, peterborough - 25/01775/fulRESOLVED that the application be not determined. | Decided | Open |
| 20 Jul 2026 | Appeal decisionsRESOLVED that the contents of the report be noted. | Noted | Open |
| 22 Jun 2026 | Appeal decisionsRESOLVED that the contents of the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.