Resolved
RESOLVED that Item 3 (b) Sawtry be not determined because the Application has been withdrawn.
Development Management Committee decided this item on Monday 15 July 2019. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that Item 3 (b) Sawtry be not determined because the Application has been withdrawn.
DEVELOPMENT MANAGEMENT COMMITTEE 15 JULY 2019
Case No: 19/00287/FUL (FULL PLANNING APPLICATION)
Proposal: RE-PLAN OF PLANNING PERMISSION 1401659OUT AND 18/00633/REM. SUBSTITUTE HOUSETYPES AND INCREASE OVERALL NUMBER OF DWELLINGS FROM 80 TO 85.
Location: LAND EAST OF GLEBE FARM GIDDING ROAD SAWTRY
Applicant: LINDEN LIMITED (MISS HANNAH SHORT)
Grid Ref: 516270 283642
Date of Registration: 14.02.2019
Parish: SAWTRY
RECOMMENDATION - APPROVE
This application is referred to the Development Management Committee (DMC) as Sawtry Parish Council's recommendation of refusal is contrary to the officer recommendation of approval.
1. DESCRIPTION OF SITE AND APPLICATION
1.1The site measures 3.76 ha and fronts onto Gidding Road, at the western gateway to the village of Sawtry. The site is within 300 metres (5 minutes walking time) of the village centre where a range of service and facilities are located, specifically: local shops; health facilities; indoor and outdoor sports facilities; a primary school and secondary school. Local employment opportunities exist at the small employment area at Brookside.
1.2The site is triangular shaped and bounded to the east by existing residential properties, to the west/northwest by Sawtry brook and to the south by Gidding Road. The South-western corner is marked by the Glebe Farm complex. No 56 Gidding Road (a two storey dwelling with a number of single storey out-buildings) is located roughly half way between the existing residential properties to the east and the Glebe Farm complex to the west. This property (No. 56) is outside the red line boundary of the application site. The boundaries are marked by existing hedges and occasional trees. The adjacent residential development to the east is typical of its time having been constructed in the early 1970's.
1.3The site is currently in the construction stages of development with the developer building in line with the previous approvals (refs: 14/01659/OUT and 18/00633/REM). The site was originally arable grassland, and was used for farming purposes at certain times of the year. The site slopes in a north easterly direction with a general fall in level of approximately 4 metres. 1.4 Access to the site is achieved via two access points to the south onto Gidding Road. Bus stops are located within 400 metres to the east of the site. A Public Right of Way crosses the site but ends at Mill View, a cul-de-sac to the east of the site boundary. The Public Right of Way was subsequently diverted through the site (having regard to the layout of the development) and onto Glebe Road. A further Public Right of Way is located along the site boundary on Gidding Road. A Public Right of Way also runs along Deerpark Road, to the east of the site.
1.5The site falls within Flood Zone 1. Table 1 of the Technical Guidance to the NPPF defines land located within Flood Zone 1 as areas which are outside the flood plain and have little or no chance of flooding. These are areas with an indicative probability of flooding of 1 in 1000 years or greater (i.e. less than 0.1% chance in any given year) from fluvial sources.
1.6In terms of planning history, outline planning permission was approved under reference 14/01659/OUT with all matters reserved except access. The subsequent reserved matters 16/01109/REM was approved by the Planning Inspectorate on 10th April 2017. Since the approval of the reserved matters a number of discharge of condition applications have been received and subsequently the majority of conditions attached under both application references 14/01659/OUT and 16/01109/REM have been fully discharged to enable the commencement of development on site.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Agenda Item 3 (b): Sawtry: 19/00287/FULAgenda | 4.3 MB | DownloadRead as text |
Follow Development Management Committee at Huntingdonshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 21 Sep 2026 | Appeal decisionsRESOLVED that the contents of the report be noted. | Noted | Open |
| 17 Aug 2026 | Appeal decisionsRESOLVED that the contents of the report be noted. | Noted | Open |
| 20 Jul 2026 | Application requiring reference to the development management committee - change of use of site to coach depot and workshop and erection of security fencing - wansford railway station, old great north road, stibbington, peterborough - 25/01775/fulRESOLVED that the application be not determined. | Decided | Open |
| 20 Jul 2026 | Appeal decisionsRESOLVED that the contents of the report be noted. | Noted | Open |
| 22 Jun 2026 | Appeal decisionsRESOLVED that the contents of the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.