Resolved
RESOLVED that the application be approved subject to conditions to be determined by the Planning Service Manager (Development Management) to include those listed in paragraph 8 of the report now submitted.
Development Management Committee approved this item on Monday 16 March 2020. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the application be approved subject to conditions to be determined by the Planning Service Manager (Development Management) to include those listed in paragraph 8 of the report now submitted.
DEVELOPMENT MANAGEMENT COMMITTEE 16th MARCH 2020 Case No: 19/02051/FULTDC (TECHNICAL DETAILS CONSENT)
Proposal: PLANNING PERMISSION FOR THE ERECTION OF 4 DWELLINGS IN PURSUANT OF PERMISSION IN PRINCIPLE APPLICATION - 18/02025/PIP
Location: LAND ADJACENT SEATONHURST BLUNTISHAM ROAD COLNE
Applicant: MR CHAPMAN
Grid Ref: 537080 275637
Date of Registration: 10.10.2019
Parish: COLNE
RECOMMENDATION - APPROVE
This application is referred to the Development Management Committee (DMC) as it is a Departure from the Development Plan.
1. DESCRIPTION OF SITE AND APPLICATION
1.1The application site measures approximately one third of a hectare and currently comprises scrub planting, small trees and hedgerows to boundaries, grassed areas and hardstanding. It has the appearance of being vacant and overgrown. The site is located on land west of Bluntisham Road adjacent to the built-up area of Colne. It is bounded by open countryside to the west, a small field to the south beyond which is residential development and by residential development, some of it relatively recently constructed, to the north and east beyond the highway.
1.2The site is in Flood Zone 1 based on the Council's 2017 Strategic Flood Risk Assessment (SFRA) and is not considered to have any other significant constraints. The site is accessed from Bluntisham Road.
1.3The application seeks consent for the technical details for residential development of four two-storey 4/5-bed dwellings. The dwellings are located symmetrically on the site - two to the front and two to the rear either side of the central access road. Each dwelling has a detached double garage. The dwellings at the frontage are of a more traditional design, faced in buff brick and the two to the rear are more contemporary and have the same brick at ground level with white render at first floor level. All four have pitched slate roofs. The dwellings on plots 1 and 2 are set back by 3.5m from the highway. 1.4 The application is supported by a design and access statement and an ecological report.
2. NATIONAL GUIDANCE
2.1The National Planning Policy Framework (NPPF) (2019) sets out the three economic, social and environmental objectives of the planning system to contribute to the achievement of sustainable development. The NPPF confirms that 'So sustainable development is pursued in a positive way, at the heart of the Framework is a presumption in favour of sustainable development. The NPPF sets out the Government's planning policies for: • delivering a sufficient supply of homes; • achieving well-designed places; • conserving and enhancing the natural environment; • conserving and enhancing the historic environment.
For full details visit the government website National Guidance
3. PLANNING POLICIES
3.1Huntingdonshire's Local Plan to 2036 (Adopted 15th May 2019) • LP1: Amount of Development • LP2: Strategy for Development • LP4: Contributing to Infrastructure Delivery • LP5: Flood Risk • LP6: Waste Water Management • LP9: Small Settlements • LP10: The Countryside • LP11: Design Context • LP12: Design Implementation • LP14: Amenity • LP15: Surface Water • LP16: Sustainable Travel • LP17: Parking Provision and Vehicle Movement • LP25: Housing Mix • LP30: Biodiversity and Geodiversity • LP31: Trees, Woodland, Hedges and Hedgerows
3.2Supplementary Planning Documents: • Huntingdonshire Design Guide (2017) • Developer Contributions SPD (2011) • Huntingdonshire Townscape and Landscape Assessment SPD (2007) • HDC Annual Monitoring Report (2019) • Cambridgeshire Flood and Water SPD 2017 • Huntingdonshire Tree Guidance Note 3 • Annual Monitoring Report – Part 1 (Housing) 2019/2019 (October 2019) • Annual Monitoring Report – Part 2 (Non- Housing) 2018/2019 (December 2019) • ECAP CCC Waste Management Design Guide (CCC SPD) 2012 Local For full details visit the government website Local policies
4. PLANNING HISTORY
4.118/02025/PIP - Residential development (up to 4 dwellings) - Accepted December 2019
4.21402092OUT - Residential Development - Refused May 2015
5. CONSULTATIONS
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
DEVELOPMENT MANAGEMENT: OTHER APPLICATION: Planning permission for the erection of 4 dwellings in pursuant of permission in principle application: 18/02025/PIP: Land Adjacent Seatonhurst, Bluntisham Road, Colne: 19/02051/FULTDCReport | 3.3 MB | DownloadRead as text |
Follow Development Management Committee at Huntingdonshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 21 Sep 2026 | Appeal decisionsRESOLVED that the contents of the report be noted. | Noted | Open |
| 17 Aug 2026 | Appeal decisionsRESOLVED that the contents of the report be noted. | Noted | Open |
| 20 Jul 2026 | Application requiring reference to the development management committee - change of use of site to coach depot and workshop and erection of security fencing - wansford railway station, old great north road, stibbington, peterborough - 25/01775/fulRESOLVED that the application be not determined. | Decided | Open |
| 20 Jul 2026 | Appeal decisionsRESOLVED that the contents of the report be noted. | Noted | Open |
| 22 Jun 2026 | Appeal decisionsRESOLVED that the contents of the report be noted. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.