CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Huntingdonshire District Council
Development Management Committee, Monday 23 August 2021 at 7.00pm

DEVELOPMENT MANAGEMENT - OTHER APPLICATION - ERECTION OF CLIMBING FRAME - GODMANCHESTER RECREATION GROUND, THE CAUSEWAY, GODMANCHESTER - 20/02553/FUL

Approved Committee 1 paper

Development Management Committee approved this item on Monday 23 August 2021. Below is the council's own wording, with the papers it was decided on.

Item24

Resolved

RESOLVED that the application be approved subject to conditions to be determined by the Planning Service Manager (Development Management) to include those listed in paragraph 8 of the report now submitted.
Word for word from the decision Huntingdonshire published for this meeting. Source: democracy.huntingdonshire.gov.uk

Follow this further

Built from Huntingdonshire's papers

What the report saysPro

Report to Development Management Committee

DEVELOPMENT MANAGEMENT COMMITTEE 23rd AUGUST 2021 Case No: 20/02553/FUL (FULL PLANNING APPLICATION)

Proposal: ERECTION OF CLIMBING FRAME

Location: GODMANCHESTER RECREATION GROUND THE CAUSEWAY GODMANCHESTER

Applicant: VICKY PRYCE

Grid Ref: 524295 270572

Date of Registration: 12.01.2021

Parish: GODMANCHESTER RECOMMENDATION - APPROVE

This application is referred to the Development Management Committee (DMC) as it an application made on behalf of Godmanchester Town Council and there have been neighbour objections received, contrary to the Officer recommendation of approval.

1. DESCRIPTION OF SITE AND APPLICATION

1.1The application site is located outside the built-up area of Godmanchester, to the west of Godmanchester. The site is located north of Portholme which is a Site of Special Scientific Interest (SSSI) and Special Area of Conservation (SACs). To the south of the site is a public right of way, Footpath 1670, which extends east across the Chinese Bridge (1671), serving as the primary access to the Recreation Ground. To the east of the proposed development is an existing wooden play area, which is going to be retained as a part of the proposal. The south of the site to the opposite side of the River Great Ouse and the east of the site faces the built-up Area of Godmanchester. Along the western boundary of the site are a significant number of mature trees. The site is located within Godmanchester Conservation Area and located within Flood Zone 3b as identified by the 2017 SFRA. The closest Listed Buildings are situated approximately 124 metres to the east of the site and are Grade II* Listed.

1.2Planning permission is sought to erect a climbing frame which has a maximum depth of 23 Metres, a maximum width of 26 Metres a maximum height of 5.85 Metres.

1.3Amended plans have been received during the lifetime of the application showing detailing the correct dimensions on the plans. A period of re-consultation was subsequently carried out. A 21 day period of full re-consultation to all consultees and neighbours was carried out between 22.02.2201 and 15.03.2021 as result of a revised location plan being submitted to the Local Planning Authority to alter the siting of the proposed climbing frame. An additional period of re-consultation was carried out between 22.07.2021 and 05.08.2021 as revised details were submitted to demonstrate the correct dimensions of the proposal. Officers note that whilst revised details have been submitted throughout the lifetime of the application, none of the objections have been withdrawn as a result of the amended plans.

2. NATIONAL GUIDANCE

2.1The National Planning Policy Framework (20th July 2021) (NPPF 2021) sets out the three objectives - economic, social and environmental - of the planning system to contribute to the achievement of sustainable development. The NPPF 2021 at paragraph 10 provides as follows: 'So that sustainable development is pursued in a positive way, at the heart of the Framework is a presumption in favour of sustainable development (paragraph 11).'

2.2The NPPF 2021 sets out the Government's planning policies for (amongst other things): • delivering a sufficient supply of homes; • building a strong, competitive economy; • achieving well-designed, beautiful and safe places; • conserving and enhancing the natural, built and historic environment.

2.3Planning Practice Guidance and the National Design Guide 2019 are also relevant and material considerations.

For full details visit the government website National Guidance

3. PLANNING POLICIES

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
DEVELOPMENT MANAGEMENT: OTHER APPLICATION: ERECTION OF CLIMBING FRAME: GODMANCHESTER RECREATION GROUND, THE CAUSEWAY, GODMANCHESTER: 20/02553/FULReport 3 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

14 of 17 attended
LA
Councillor Lewis Adam BesleyMember, present
SM
Councillor Shaun Mark BurtonMember, present
ER
Councillor Eric Richard ButlerMember, present
MS
Councillor Mrs Sarah Joanne ConboyMember, present
SJ
Councillor Stephen John CorneyMember, present
JC
James CumminsOfficer, expected
DB
Councillor Douglas Bernard DewChair, present
ID
Councillor Ian Derek GardenerMember, present
KP
Councillor Kevin Paul GulsonVice-Chair, present
MH
Councillor Mike HumphreyMember, present
CJ
Councillor Colin John MaslenMember, present
JN
Councillor Jon NeishMember, present

All 17 on the meeting page

On this subject at Huntingdonshire

Search all
  1. DEVELOPMENT MANAGEMENT - OTHER APPLICATION - ERECTION OF CLIMBING FRAME - GODMANCHESTER RECREATION GROUND, THE CAUSEWAY, GODMANCHESTER - 20/02553/FULThis decision
  2. Application requiring reference to the development management committee - change of use of site to coach depot and workshop and erection of security fencing - wansford railway station, old great north road, stibbington, peterborough - 25/01775/fulDecided
  3. Development management - outline planning application with all matters reserved except for site access for construction of storage and distribution (use class b8), general employment (use class b2), bus depot (sui generis) floorspace with aApproved
  4. Application requiring reference to development management committee - two-storey extension and refurbishment of leisure centre to include new swimming pools, fitness suites, the relocation of an artificial pitch, new racket courts, car parkApproved
  5. Application requiring reference to the development management committee - outline application with all matters reserved except for access via peterborough road for the demolition of 107 peterborough road, and the development of up to 185 dwDecided
  6. Application requiring reference to the development management committee - proposed 2 no. replacement dwellings and 1 no. detached double garage - 3 sheepwalk cottages, oundle road, elton, peterborough - 25/01436/fulDecided

More from Huntingdonshire Development Management Committee

All decisions
MeetingDecisionOutcome
21 Sep 2026 Appeal decisionsRESOLVED that the contents of the report be noted. Noted Open
17 Aug 2026 Appeal decisionsRESOLVED that the contents of the report be noted. Noted Open
20 Jul 2026 Application requiring reference to the development management committee - change of use of site to coach depot and workshop and erection of security fencing - wansford railway station, old great north road, stibbington, peterborough - 25/01775/fulRESOLVED that the application be not determined. Decided Open
20 Jul 2026 Appeal decisionsRESOLVED that the contents of the report be noted. Noted Open
22 Jun 2026 Appeal decisionsRESOLVED that the contents of the report be noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies