Resolved – Members voted against officer recommendations and refused the planning application with authority delegated to the Chief Planning and Transportation Officer to draft an appropriate reason for refusal for the following reason: 1) Impact of the development on the Green Belt. N.B. – 1 . Andy Barnes – Spoke against the application. · Chair of Stan Hill Village Community Association. · Agreed in a ... view the full minutes text for item 433.
Word for word from the decision Hyndburn published for this meeting.Source: democracy.hyndburnbc.gov.uk
Full Application: Major Full: Development of a Battery Energy Storage System (BESS) and Associated Infrastructure.
Date for Decision: 17/02/2025 (Ext. until 01/05/2025)
Site and Proposal
This is an application for full planning permission for development of a 60MW Battery Energy Storage System (BESS) to provide energy balancing services to the National Grid. This type of facility operates by taking electricity from the Grid at times of low demand, storing it in batteries, and releasing it back to the Grid when demand is high.
Demand for electricity can vary dramatically across the day. Using fossil fuels, it was possible to adjust the amount of power being generated to match the amount required. However, that is much harder with renewable energy sources. When the amount of power being generated exceeds demand, BESS charge up and store the energy, releasing power back into the grid when demand increases. As such, BESS play a key role between renewable energy supplies and responding to energy demands.
The application site (as amended 17th March 2025) is a 2.05ha parcel of agricultural land and woodland to the south of Stanhill Road and to the west of the M65 Motorway. White Ash and Stanhill Barn are located to the north of the site, adjacent to Knuzden Moss Farm. The point of access as originally applied for was a private gate located along Stanhill Road through Knuzden Moss Farm. The proposal was amended on 17th March by submission of new access details, with the new point of access further to the east and therefore further from the motorway. The site is located within the designated Green Belt.
The proposed development would comprise of the following equipment:
Fenced compound measuring 117m x 50m containing: o 14no. Battery Clusters o 7no. BESS Transformers on bunded foundations o 1no. Site Welfare and LV Switchroom placed on paving slabs at the corners o 1no 33kV BESS switchroom on raised pillars o 2no. 132kV Substation Switchrooms o 1no. 33kV/415V Site Supply Transformer on bunded foundation o 2no. 132kV Substation within a compound. This compound to have a bunded foundation o 2no. car parking spaces o 2no. Water Tanks o 1no. Fire Hydrant
The compound would have two rows of battery clusters and transformers accessed by two internal access tracks with two gates from the access road to the site. There would be one switchroom at the end of a battery cluster row. The substation compound would lie to the south of the rows of battery clusters whilst the remainder of the site would contain a SuDs pond and landscaping.
The compound surface would comprise primarily of permeable ground with the BESS clusters sat on screw piles on concrete foundations. The invertors would have bunded concrete foundations and the switchroom would be placed on paving slabs in the corners. Internal access tracks within the compound would consist of a type 1 (i.e. <40mm) compacted stone. The compound would be surrounded by a 3m high acoustic fence to the north, east and west with a mesh fence which would be 2.4m in height to the south. 24hr CCTV will be located along the compound perimeter.
A screening opinion under the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 was submitted to the LPA in June 2024. The LPA do not consider the proposed development to comprise EIA development.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.