Item89
Resolved
- 1. That a section 106 obligation be entered into providing for:- - 13% affordable housing (as detailed on the revised Viability assessment dated 10 January 2013) and a primary school contribution of £102,275. - Viability review after 5 years should the development not be completed. - Contribution to maintenance of public open space should IBC adopt. 2. Upon completion of 01 the Head of Development and Public Protection be authorised to grant outline planning permission subject to conditions covering:- 1. Submission of reserved matters (details of landscaping, design , layout and scale based on the submitted parameter drawings) 2. Details of materials, levels, cycle parking, boundary treatments and refuse arrangements, and layout of public open space 3. No vehicular access to Woodbridge Road 4. Access and road layout, design and surfacing 5. Noise mitigation 6. Drainage details 7. Soil remediation 8. Archaeology investigation 9. Ecological mitigation 10. Pedestrian access to be formed to Woodbridge Road prior to any occupation 11. Dwellings to front onto roads and public open space 12. Travel Plan 13. Code for Sustainable Homes Level 4 and 15% renewable energy subject to viability 3. Should a section 106 agreement not be completed by 1 March 2013 the Head of Development and Public Protection be authorised to refuse planning permission at his discretion.
Word for word from the decision Ipswich published for this meeting.
Source: democracy.ipswich.gov.uk