Resolved
- Grant Full Planning Permission upon condition that:- 1. The development shall be carried out in accordance with the revised submitted drawings:- E13/4226/2/8 Rev. A 27 & 27A New Garage E13/4226/2/1/A 27A New Build Elevation and Layout E13/4226/2/2 Rev.A 27A New Build Ground Floor E13/4226/2/5 Rev. B 27A New Build Site Plan E13/4226/2/9 Rev. A Vehicular Access E13/4226/2/10 Rev. A 27A New Build Elevations E13/4226/2/3 Rev. A 27A New Build 2nd Floor 2. Prior to the commencement of the development hereby approved, or such other timescale as may be agreed in writing with the Local Planning Authority, a scheme to provide a minimum of 15% (or in the case that the achievement of this percentage is demonstrated not to be feasible or viable such lesser percentage as may be agreed in writing with the Local Planning Authority) of the predicted required energy supply for the new development from decentralised and renewable or low carbon sources shall be submitted to and approved in writing by the Local Planning Authority. The development shall not be first occupied unless and until the approved scheme has been implemented in full and thereafter the provisions of the scheme shall be maintained for the lifetime of the development in accordance with the details of the approved scheme. 3. The new vehicular access shall be laid out and completed in all respects in accordance with Drawing No. E13/4226/2/9 revision A and made available for use prior to occupation of the dwelling. Thereafter the access shall be retained in the specified form. 4. Details of foul and surface water drainage for the site shall be submitted to and approved in writing by the Local Planning Authority before any work on the site commences. Sustainable Urban Drainage Systems should be used wherever reasonably practical. The drainage works shall be constructed in accordance with the approved details before the related buildings are first occupied. 5. Before the development is commenced details shall be submitted to and approved in writing by the Local Planning Authority showing the means to prevent the discharge of surface water from the development onto the highway. The approved scheme shall be carried out in its entirety before the access is first used and shall be retained thereafter in its approved form. 6. Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 as amended there shall be no extensions carried out to the hereby approved dwelling[s]. 7. External material finishes (brick, quoins, lintels and sills) shall match No. 27 Cauldwell Avenue and prior to commencement of development written specification and samples of the proposed materials shall be submitted for the prior written approval of the planning authority, the materials shall be used as agreed. 8. Prior to commencement of development details of ... view the full minutes text for item 112.
Word for word from the decision Ipswich published for this meeting.
Source: democracy.ipswich.gov.uk