Resolved
that retrospectively £3934.01 be allocated from the South West Area Committee budget for repair of block paving and removal of two trees at Ellenbrook Green, as detailed in Appendix 1 to report Ref No: SWAC/14/22, be agreed. Reason: To improve infrastructure for the community with the repair of paving and removal of trees on site as this would result in increased safety for pedestrians.