Resolved
- Grant Full Planning Permission upon condition that:- 1. To be in accordance with the approved drawings and the requirements of any succeeding conditions. 2. Conditions relating to access, surfacing, highway drainage of vehicular areas and parking space, reconstruction of the footway, and highways condition survey. 3. Details relating to cycle parking, bin storage and collection arrangements, electric charging points, powered two wheel vehicles. Agreed details/works to be carried out prior to occupation. 4. Samples of external facing materials, fenestration, and all external hard landscaping. 5. Construction Management Plan. 6. Travel Plan submission and implementation including details and provision of showering facilities for staff, and supplemented bus tickets. 7. Details of surface water drainage design. 8. No development to commence unless and until details relating to provision and maintenance of landscaping, inclusion of root direction systems, and replanting of street trees with types to be determined, has been submitted and agreed. 9. Development to achieve BREEAM ‘excellent’ unless demonstrated not feasible or viable. 10. Development shall achieve 15% of energy requirements from decentralised and renewable or low carbon sources unless demonstrated not feasible or viable. 11. A rchaeological scheme of investigation. 12. Co mmercial floor levels being no lower than 3.9 metres AOD. 13. Details of flood resistance and resilience techniques. 14. E mergency plan and flood warning arrangements. 15. Phase 2 contaminated land investigation. 16. Submission of a remediation scheme relating to contamination. 17. Verification report demonstrating completion of works. 18. R eports on monitoring and maintenance and any contingency action carried out. 19. The Council to be notified immediately of any contamination found not previously identified. 20. Details of extraction systems, generators and associated acoustic housing to be submitted and approved. INFORMATIVES:- 1. S prinklers recommended. 2. Hi ghways Authority permission is required for works within the public highway.