Planning & Development Committee approved this item on Wednesday 16 September 2015. Below is the council's own wording, with the papers it was decided on.
Grant Planning Permission upon condition that:- 1. Development to be carried out in accordance with submitted plans. 2. Hours of construction. 3. Details to be submitted and approved to ‘make good ’ the garage belonging to Nos 44 and 42 Gleneagles Drive and these works to be completed before first occupation of the extension. 4. Obscure glazing to be provided in the high level flank wall windows.
Word for word from the decision Ipswich published for this meeting.Source: democracy.ipswich.gov.uk
GENERAL SPECIFICATION - All works are to comply with the current Building Regulations, British Standards and Codes of Practice referred to herein but not specifically The works shall be carried out to the full satisfaction of the local authority Building Control Officer, Approved inspector or other body including submission of all necessary notices and payment of All products referred to on the drawing and this specification are to be used strictly in accordance with the manufacturer's Before starting any works, all site conditions and dimensions are to be checked and verified by the builder and any discrepancies reported to the Allow to supply and fix/apply all new finishes/fittings to match existing unless otherwise specified, eg. doors/frames, windows, door and window furniture, skirtings, architraves, dado/picture rails All softwood used in a structural capacity to be FSC or PEFC certified, min C16 grade (to BS 5268 pt 2, 1991) unless otherwise specified. Rendered finish above facing STRUCTURAL DESIGN - Construction specification to be read in conjunction with any structural calculations relating to project. brickwork plinth to match existing ELECTRICS - All electrics to be wired in accordance with latest IEE Regulations. Power outlets and light fittings to be located as directed by applicant. Efficient lighting to be provided in new building/extension/alterations with at least 75% of the total of all new light fittings to have a luminous efficacy greater than 45 lumens per circuit-watt. Fixed external lighting to be controlled via. sensors which automatically turn off lights when not required and when there is sufficient daylight. Each external light fitting should not have a lamp capacity exceeding 150W. All electrical work required to meet the requirements of Part P (Electrical Safety) must be designed, installed, inspected and tested by a registered person competent to do so. Prior to completion PROPOSED FRONT ELEVATION 1:100 PROPOSED SIDE ELEVATION 1:100 the Council should be satisfied that Part P has been complied with. This will require an appropriate BS 7671 electrical installation certificate to be issued for the work by a registered person competent to do so.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.