Resolved
Application deferred.
Planning & Development Committee deferred this item on Wednesday 6 April 2016. Below is the council's own wording, with the papers it was decided on.
Resolved
Application deferred.
All dimensions to be verified on site by Main Contractor before the start of any shop drawings or work whatsoever either on their own behalf or that of sub-contractors.
LEGEND: Report any discrepancies to the Contract Administrator at once.
This drawing is to be read with all relevant Architect's and Engineer's N Road / Car park construction; drawings and other relevant information.
Porous Asphalt placed to attenuate within © Ingleton Wood LLP the sub-base, laid to falls towards soakaway.
Important Note: Important Note: DO NOT SCALE Road / Car park construction; Soakaway sizing is subject to in-situ percolation All existing drainage for re-use is unconfirmed for Impermeable Asphalt finish. Notes: testing. Tests in accordance with BRE Digest 365 condition, levels & connections. CCTV survey is - The principle disposal of surface water runoff is to be by Existing level means of infiltration via a buried soakaway. Northwestern must be undertaken to confirm infiltration rates. required to demonstrate appropriateness of all most corner of car park resurfacing to fall towards existing drainage to be reused and to confirm outfall. 7.00 Proposed level channel drain to be re-used to provide positive drainage. 1/80 - The permeable paving car park is designed to provide Fall 3No. stages of surface water treatment prior to discharge
LC Lighting Column from the drainage system; 1. porous asphalt road construction, Kerb Type Details: 2. filter media placed above buried soakaway, 3. and via buried tank soakaway. 125 x 255mm Type HB2 PCC kerb to HB2 - Stockpiled and excavated material to be reused as BS EN 1340:2003 with 100mm upstand. capping material to regulate existing site levels to design 125 x 150mm Type BN PCC kerb to formation of porous asphalt road construction. BN New ACO channel drain to be BS EN 1340:2003 with 0-25mm upstand. - Soakaway sizing is subject to in-situ percolation testing Existing petrol interceptor to be installed in place of existing, re-using cleaned and de-sludged for re-use. existing outlet connection to existing 125 x 255/150mm Type DL1 & DR1 PCC kerb to to confirm infiltration rates in accordance with BRE Digest surface water drainage network. DK Existing condition to be surveyed BS EN 1340:2003 with 100 down to 25mm upstand. 365. and confirmed by Contractor and ACO M150D 0.0 or similar approved. - Manhole covers to be taken up and re-layed regulated to findings reported to the Engineer. 50 x 150mm Type EF PCC edging to EF suit final surface levels. BS EN 1340:2003 laid flush. 6.46 6.35 LC Former Crown 6.36 Ex.SW 1 6.75 Zone of infiltration within footprint of former Court Building Ø CL 6.39 IL TBC building, subsequently demolished. 0 Ex.SW 2 1/2 10 0 Existing surface water drain to be reused. CL 6.53 54 0Ø IL 6.08 10 55 New channel drain to be installed on LC
1/20 7.325 56 existing outlet
1/20 57 Buried Tank Soakaway;
1/ 58
25 30 year return period Ex.SW 3 59 CL 7.10, IL 5.50 6.975 CL 6.57 60 A: 27.0 x 8.0m = 216.0m²
3 IL 4.95
1/8 61 V: 216.0 x 0.8m dp = 164.2m³ 62 Wavin 'Aquacell Core' 1.0 x 0.5 x 0.4m units 63 (95% void ratio)
150Ø 1/9 52 53 7.30
0 7.19 HB2 LC
1/9 7.285 7.20 7.19 7.19 42 43 44 HB2 45 46 47 48 49 50 7.30
51 7.37 7.20 7.15 7.15 64 7.30 Ex.SW 4
1/120 0
1/120 1/9 CL 6.82 LC 7.45 IL 3.62 7.21
7.687.64 7.10 7.10 150Ø 1/124
1/5 5 7.10 34 35 36 37 38 39 40 41 31 32 33
7.2514 15 16 17 18 19 7.175 1/120 LC HB2 7.10 LC HB2 7.10 7.10 28 HB2 29 30 LC 20 21 HB2 22 23 24 25 7.10 26 27 PRELIMINARY CI
1/8 0 0 1/58 1/4 7.515 7.265 VI
LC Ex.SW 5 7.205 C
CL TBC IL 3.50 DR
1/120 1/120 IV
Approximate location of existing buried manhole. To be confirmed on site and 30
HB2 E
0Ø
confirmed to the Engineer. 3 4 5 6 7 8 9 10 11 12 13 2 1/2
1 21
P1 09.02.16 Fist issue. JS -
Revision: Date: Description: Drw: Chk: 7.25 7.305 7.25 7.25
1/25
1/45 Ex.SW 6 CL 6.80 (7.14) (7.21) IL 3.41
Vision, form and function (7.00) (7.04) Cambridge Billericay Compass House, Vision Park C TB
Cambridge Chivers Way, Histon Cambridge CB24 9AD Ø
Colchester
T RE ET London T: 01223 965200
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Item 05: 16-00156Report | 2 MB | DownloadRead as text |
PDF |
PD/15/16 Item 5: Application IP/16/00156/FPI3Report | 527 KB | Download |
Follow Planning & Development Committee at Ipswich and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jul 2026 | Unconfirmed Minutes of Previous Meeting - 1 July 2026that the Minutes of the meeting held on 1 July 2026 be signed as a true record. | Decided | Open |
| 29 Jul 2026 | To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. | Decided | Open |
| 29 Jul 2026 | PD/26/03 Information for Councillors, including Planning Enforcement Updatethat the information for Councillors be noted. | Noted | Open |
| 1 Jul 2026 | Unconfirmed Minutes of Previous Meetingthat the Minutes of the meeting held on 3 June 2026 be signed as a true record. | Decided | Open |
| 1 Jul 2026 | To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.