CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Ipswich Borough Council
Planning & Development Committee, Wednesday 8 March 2017 at 9.30am

PD/16/14 Item 1 - Application IP/16/01102/FUL

Approved Planning 2 papers

Planning & Development Committee approved this item on Wednesday 8 March 2017. Below is the council's own wording, with the papers it was decided on.

Item142

Resolved

- Grant planning permission subject to the following conditions (briefly):- 1. Within 2 months of the date of this decision, handrails and side restraints indicated on the plans to be painted black. 2. Should the use cease then the access ramp hereby approved shall be removed completely and the front garden area be restored in a manner to be first agreed in writing by the Local Planning Authority.
Word for word from the decision Ipswich published for this meeting. Source: democracy.ipswich.gov.uk

Follow this further

Built from Ipswich's papers

What the report saysPro

Report to Planning & Development Committee

Remove all equipement, basins and waste pipes. Make good all walls and ceilings and redecorate. All SVP's to reduce to 75mm fdia over higheste waste trap Remove existing floor covering and

North fit new carpet. Electrics? Connect existing waste pipes to new soil and vent pipe

Extension

DOWN E Cbd

SA E

44 - 48 NEIGHBOURS F ENCE

49 ramp

Ha ndra il Ha ndra il 30 0 STEPS 5 N o. 156 m m rise

780 m m

roof light roof light

PLATFORM LI FT 12 80 x 1 900 STAFF ROOM WC DENTAL SURGERY Flat roof

SUR GERY BIN 1300 X 750 GLADSTONE RD BINS Area

SUR GERY

SUR GERY BIN 585X 730

BIN 585X 730

SUR GERY BIN 1300 X 750 BIN 585X 730

BIN 585X 730

FLAT FLAT A

FOXHALL RD E E

42 roof light

RWP New rainwater downpipe position. Adjust existing gutters to suit BLOCK PLAN Scale 1 : 500

SVP A

roof light roof light SURGERY 2 SURGERY 3 ELECTRICAL KEY Floor duct set into new and existing floors Double socket New rainwater downpipe position. Flat roof 300mm wide x 150mm deep Single socket Adjust existing gutters to suit cctv

RWP Foundations generally 600mm wide Switched fused spur to depth as agreed with building inspector TV T.V socket Steel staircase BT British telecom socket ROOF PLAN Scale 1 : 100 Existing walls lined with Celotex GS5060 C Cooker socket Promenade tiles

Down Lead lining

SVP roof light Landing S Shaver socket Input air grill Light switch RWP BEDROOM 1 No.47 FLAT 2 LIVING Rm New rainwater downpipe position. Input air duct External wall light

WL Adjust existing gutters to suit SVP Extract air duct cooker Lv Low voltage spot light Extract air grill in ceiling P Pendant light Mechanical ventilation with heat recovery unit FL Flourescent light KITCHEN SHOWER RM WL Wall light SVP Soil pipe with 30minutes fire collar BA where passing into surgery ceiling Burglar Alarm Shower DB Door Bell SA NOTES: SA Smoke alarm 1) CAT 6 cabling : 6 No. cables per room between 100 reception area and the following rooms : Consumer unit - Surgery 4 EF Electric extract fan - Surgery 5 - Oral promotion room STRIP Strip lighting - Office E Emergency lighting - Reception Adjust plumbing in 1sr floor flat Emergency brake glass alarm to new svp positions 1st FLOOR PLAN Scale 1 : 50 2) The following rooms to have isolator switches positioned externally in corridor for general power, Fire alarm sounder chair power and TV. Fire alarm controls - Surgery 4 Fire alarm - Surgery 5 - Oral promotion room Security alarm controls security Kitchen alarm Walls & ceilings to be made good, reskimmed cctv

and decorated. Security camera : cctv Floor to receive latex levelling screed and vinyl floor finish New door with manual and elctronic opening Check existing gas boiler has enough device fitted, operated off push button capacity for additional spaces. inside and externally. If not allow to upgrade Move existing counter Archway widened to minimum New work top with cupboard to new position. 800mm, more if possible. units underneath with 2no shelves Redecorate all existing walls Existing gas meter supply to dental surgery No 49 Foxhall road of reception and waiting room 1 Beams, posts and foundation to to remain. 4 No melamine shelves engineers details for computer equipment Party wall line NEIGHBOURS FENCE

Filling Cabinet

higher level COUNTER DESK Boiler

UP 1858 ? may need another support in between Lv SA E ENTRANCE HALL

receptionist workspaces or a post Filling Cabinet

Lv Fire alarm RECEPTION Filling Cabinet 300 800

KITCHEN Removable floor access Handrails, Plastic/ warm touch finish Rega vent mechanical extract unit fitted in purpose

gas E Lv and recess in front of existing

550mm deep recess under worktop made bulkhead where existing ceiling joists Filling Cabinet

Removable vertical end grill / panel

FL meter box for door to open

for wheel chairs users removed

SURGERY 118

Lv shown in red. 650

WAITING ROOM 1

BIN 585 X 730 260

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Item 1 16-01102Report 748 KB DownloadRead as text
PDF
PD/16/14 Item 1: Application IP/16/01102/FULReport 869 KB Download

At this meeting

Whole meeting

Who was there

15 of 15 attended
PG
Councillor Peter GardinerChair, apologies, sent representative
BK
Councillor Bill KnowlesVice-Chair, present
SC
Councillor Stephen ConnellyCommittee Member, present
SG
Councillor Sandra GageCommittee Member, apologies, sent representative
AH
Councillor Andi HopgoodCommittee Member, present
CJ
Councillor Carole JonesCommittee Member, present
CK
Councillor Colin KreidewolfCommittee Member, present
BR
Councillor Bryony RudkinCommittee Member, present
BS
Councillor Barry StuddCommittee Member, present
JC
Councillor John CarnallCommittee Member, present
DG
Councillor David GoldsmithCommittee Member, present
EH
Councillor Elizabeth HarsantCommittee Member, present

All 15 on the meeting page

On this subject at Ipswich

Search all
  1. PD/16/14 Item 1 - Application IP/16/01102/FULThis decision
  2. PD/26/01 Item 1 - Applications IP/25/00532/LBC & IP/25/00533/FULAgreed
  3. PD/26/02 Item 2 - Application IP/26/00014/FULApproved
  4. PD/25/07 Item 1 - Application IP/24/00118/FULApproved
  5. PD/25/02 Item 4 - Application IP/25/00070/FULApproved
  6. PD/25/02 Item 6 - Application IP/25/00302/FULDecided

More from Ipswich Planning & Development Committee

All decisions
MeetingDecisionOutcome
29 Jul 2026 Unconfirmed Minutes of Previous Meeting - 1 July 2026that the Minutes of the meeting held on 1 July 2026 be signed as a true record. Decided Open
29 Jul 2026 To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. Decided Open
29 Jul 2026 PD/26/03 Information for Councillors, including Planning Enforcement Updatethat the information for Councillors be noted. Noted Open
1 Jul 2026 Unconfirmed Minutes of Previous Meetingthat the Minutes of the meeting held on 3 June 2026 be signed as a true record. Decided Open
1 Jul 2026 To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies