CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Ipswich Borough Council
Planning & Development Committee, Wednesday 5 April 2017 at 9.30am

PD/16/15 Item 5 - Application IP/17/00155/VC

Approved Planning 2 papers

Planning & Development Committee approved this item on Wednesday 5 April 2017. Below is the council's own wording, with the papers it was decided on.

Item156

Resolved

- Grant planning permission subject to the following conditions (briefly):- 1. In accordance with the approved plans as amended by this application. 2. Accesses to be retained in accordance with the approved details as amended by this application. 3. Vehicular accesses to be fully surfaced prior to occupation in accordance with the approved details. 4. Surface water drainage to be in accordance with the approved details. 5. Footway fronting the site to be reconstructed in accordance with approved details. 6. Details for unloading, manoeuvring and parking of vehicles including secure covered cycle storage, details of the electric vehicle charging points, and shower and locker facilities shall be carried out in accordance with the approved details and implemented prior to use commencing. 7. External materials; fenestration; and external hard and soft landscaping to be in accordance with approved details. 8. Construction phase of the development to comply with the approved Construction Management plan. 9. Agreed travel Plan to be followed in accordance with details. 10. Surface Water drainage scheme to be fully implemented, managed, and maintained in accordance with the approved details. 11. Building to be constructed in accordance with the BREEAM design stage assessment. Within 3 months of first occupation a post construction review and certification report shall be submitted for approval. 12. Details provided showing the building will attain 15% of the predicted energy use from decentralised and renewable low carbon sources shall be implemented fully and retained. 13. The finished ground floor level of the office accommodation hereby approved shall be set no lower than 3.9m above Ordnance Datum (AOD). 14. Flood resilience and resilience building techniques previously approved shall be fully implemented. 15. The Flood Evacuation Plan and flood warning arrangements submitted as part of the Flood Risk Assessment from Peter Brett ref: - J :1224 shall be implemented in full and made available to all future tenants. 16. Details submitted and agreed regarding contamination shall be fully implemented. 17. If, during development, contamination not previously identified is found to be present at the site then work to stop and the LPA to be notified, and necessary mitigation to be agreed and implemented. 18. Prior to their installation the details of any extraction systems, generators and/or other plant and the associated acoustic housing is to be submitted and approved by the Local Planning Authority. Details approved under application IP/17/00133/CON shall be fully implemented. 19. Details submitted regarding generators under application Ref: ... view the full minutes text for item 156.
Word for word from the decision Ipswich published for this meeting. Source: democracy.ipswich.gov.uk

Follow this further

Built from Ipswich's papers

What the report saysPro

Report to Planning & Development Committee

Do not scale from this drawing. To be read in conjunction with all other drawings, engineer's & specialist drawings and specifications. All dimensions are to structural elements only unless otherwise stated. SCALE Any discrepancies between drawings to be reported to the architect before commencement of 0 2 4 6 8 10 12 14 16 18 20 M affected work. All dimensions to be checked on site. This drawing is copyright of the architect and shall not be reproduced without his permission.

Revisions: P4 10.02.17 Generator enclosure extended. Disabled persons space moved. DP 1 No parking space omitted. Cycle parking moved. Splays to entrance / exit altered. Rising bollards added

N

up

80mm open projecting minus to the centres 100 not to 228 degrees handle handlesmmof the = doors mullionstherefore clear width

12 fitting tol. 80mm projecting

handle

CH A LO NS TR EE T up

T EE TR SS CE up

IN handle

projecting 80mm

PR width mullionstherefore clear = doors the handlesmmof to 228 degrees handle centres 100 not minus to the projecting open 80mm

FFL 3.9M

handle IN 12 UNCOVERED projecting 80mm

CYCLES width clear doors = mullionstherefore handles mmthe handle to 228 of degrees not minus 100 centresprojecting the to 80mm open

3No TELESCOPIC RETRACTABLE handle

projecting 80mm

BOLLARDS AT ELECTRIC VEHICLE QUARTER POINTS CHARGE POINT

width mullions of = clear the therefore doors

mm centres 228 handles degrees handle to

minus 100 not

the to projecting open 80mm

ACROSS ENTRANCE TO M&E DETAILS

up

80mmto 100 open the the projecting handle

centres mm = clear minus 228 handles doors therefore mullions ofdegrees width

not to

72 CAR PARKING handle projecting 80mm SPACES (INCLUDING SEATING 4 DISABLED SPACES T

AREA EE

@5%) STR ES INC

2 no. TWO PR

slope up WHEELED handle projecting 80mm

POWERED to handles minus the centres 80mm open 100 = clear

degrees toprojecting width

mm mullions doors not 228 of the therefore handle VEHICLE SPACES slope up 12 fitting tol.

WITH LOCK FIXING TO WALL doors therefore mullions

width handle centres degrees

= clear of the open projecting the to 100

mm to handles not 228 80mm

minus

handle projecting 80mm

Tenant Generator

Store Rm Intake 14 UNCOVERED Rm Sub Stn CYCLES

Bin Store 26 COVERED CYCLES T Purpose of Issue R EE OUT IN AL ST PLANNING RD CA W Project Title NE 3No 145 PRINCES STREET, IPSWICH TELESCOPIC RETRACTABLE BOLLARDS AT QUARTER Drawing Title POINTS ACROSS PROPOSED SITE & BLOCK PLAN EXIT

Project Ref : 1556 50.00

Scale @ A1 : 1:250 Scale @ A3 : 1:500 Created By : DM Checked By : CJ Date : 08.10.2014 CAD Ref : 1556-L11 Drawing No : 1556-L11 Rev : P4

BARBER CASANOVAS RUFFLES CHARTERED ARCHITECTS 1 Wellington Street, Cambridge CB1 1HW T: 01223 366717 E: [email removed] Company No. 2376728 C Do not scale from this drawing. To be read in conjunction with all other drawings, engineer's & specialist drawings and specifications. All dimensions are to structural elements only unless otherwise stated. Any discrepancies between drawings to be reported to the architect before commencement of affected work. All dimensions to be checked on site. This drawing is copyright of the architect and shall not be reproduced without his permission.

Revisions:

P3 10.02.17 Generator enclosure extended DP

OPEN AIR TO LINE OF ENCLOSED ROOFS TENANT BELOW FLAT ROOF GENERATOR

UNINSULATED SINGLE PLY LINE OF UNINSULATED GUTTER MEMBRANE FLAT ROOF FORMED IN SINGLE PLY COLOUR DARK GREY MEMBRANE FLAT ROOF COLOUR DARK GREY

RWO RWO RWO

01 External Structures Roof Plan

SLOT APERTURES IN BRICKWORK UNINSULATED SINGLE PLY MEMBRANE TREATED TIMBER FASCIA EAVES BUFF COLOURED FACING BRICKWORK LAID FOR VENTILATION TO ENCLOSURE FLAT ROOF COLOUR DARK GREY DETAIL SET BACK TO OFFER RELIEF TO STRETCHER BOND TO MATCH MAIN BUILDING FRONT FASCIA LINE WITH PIGMENTED MORTAR TO COMPLIMENT THE BRICKWORK

ED5 ED4 ED3 ED2 ED1

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Item 5 17-00155Report 1.5 MB DownloadRead as text
PDF
PD/16/15 Item 5: Application IP/17/00155/VCReport 506 KB Download

At this meeting

Whole meeting

Who was there

14 of 14 attended
PG
Councillor Peter GardinerChair, present
BK
Councillor Bill KnowlesVice-Chair, present
SC
Councillor Stephen ConnellyCommittee Member, present
SG
Councillor Sandra GageCommittee Member, present
AH
Councillor Andi HopgoodCommittee Member, apologies, sent representative
CJ
Councillor Carole JonesCommittee Member, present
CK
Councillor Colin KreidewolfCommittee Member, present
BR
Councillor Bryony RudkinCommittee Member, present
BS
Councillor Barry StuddCommittee Member, present
JC
Councillor John CarnallCommittee Member, present
DG
Councillor David GoldsmithCommittee Member, present
EH
Councillor Elizabeth HarsantCommittee Member, present

All 14 on the meeting page

On this subject at Ipswich

Search all
  1. PD/16/15 Item 5 - Application IP/17/00155/VCThis decision
  2. PD/26/01 Item 1 - Applications IP/25/00532/LBC & IP/25/00533/FULAgreed
  3. PD/26/02 Item 2 - Application IP/26/00014/FULApproved
  4. PD/26/01 Item 5 - Application IP/26/00156/FPI3Approved
  5. PD/25/07 Item 1 - Application IP/24/00118/FULApproved
  6. PD/25/07 Item 2 - Application IP/25/00377/FPI3Approved

More from Ipswich Planning & Development Committee

All decisions
MeetingDecisionOutcome
29 Jul 2026 Unconfirmed Minutes of Previous Meeting - 1 July 2026that the Minutes of the meeting held on 1 July 2026 be signed as a true record. Decided Open
29 Jul 2026 To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. Decided Open
29 Jul 2026 PD/26/03 Information for Councillors, including Planning Enforcement Updatethat the information for Councillors be noted. Noted Open
1 Jul 2026 Unconfirmed Minutes of Previous Meetingthat the Minutes of the meeting held on 3 June 2026 be signed as a true record. Decided Open
1 Jul 2026 To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies