Item12
Resolved
Grant planning permission upon condition that (briefly):- 1. Development to be carried out in accordance with approved plans. 2. Details to be submitted and approved:- External materials, hard and soft landscaping scheme including external surfacing; boundary treatments including brick wall associated with highway frontage; cycle storage details, refuse/recycle presentation area detail, tree protection plan, site levels (existing and proposed finished floor levels); biodiversity enhancements; engineered solution to pedestrian access to proposed No.97. All agreed details to be fully implemented prior to occupation. 3. Dwellings to meet necessary energy and water use sustainability targets as required by policy DM1. 4. Refuse/recycle storage to be provided and retained as per submitted drawing. 5. Submission of a pre-commencement Demolition and Construction Management Plan to be submitted and approved. No works in respect of the demolition and construction of the development hereby permitted and no deliveries to the site during construction shall be undertaken at the following times:- Outside the hours of 0800 - 1800 on Mondays to Fridays (inclusive), Outside the hours of 0800 - 1300 on Saturdays, On Sundays and on public holidays. 6. Ground floor windows on west elevation to be obscure glazed, and retained as such thereafter. 7. Vehicular accesses to be a maximum of 3m in width. 8. Submission of a scheme to prevent discharge of surface water onto the highway. 9. Space for the manoeuvring and parking of vehicles and the secure cycle storage to be ... view the full minutes text for item 12.
Word for word from the decision Ipswich published for this meeting.
Source: democracy.ipswich.gov.uk