CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Ipswich Borough Council
Planning & Development Committee, Wednesday 23 August 2017 at 9.30am

PD/17/06 Item 4 - Application IP/17/00598/FPI3

Approved Planning 2 papers

Planning & Development Committee approved this item on Wednesday 23 August 2017. Below is the council's own wording, with the papers it was decided on.

Item55

Resolved

- Grant planning permission upon condition that (briefly):- 1. The development is to be constructed in accordance with the approved plans.
Word for word from the decision Ipswich published for this meeting. Source: democracy.ipswich.gov.uk

Follow this further

Built from Ipswich's papers

What the report saysPro

Report to Planning & Development Committee

NOTES This drawing must not be reissued, loaned or copied without the written consent of Richard Vest Architectural Design Ltd. All errors, omissions, discrepancies should be reported to the originator immediately. All dimensions to be checked before 1:20 site fabrication by the contractor, his sub-contractor or supplier. Do not scale plans - use figure or grid dimensions where given. Any deviation from the drawing to be reported to the originator immediately. 1000

20000 Public Footpath The proposals incorporated in this drawing are designed to meet the requirements of the Building Regulations 2000, 943

Approved Documents A to P with all current editions, and all the British Standards and Codes of Practice referred to therein. The drawing is prepared on the basis that the designer will give no site supervision and will have no further involvement 18860 Ex. Edge Public Footpath once Local Authorities permission(s) has been obtained. Inspection Chamber New Gully Drawing issue status: PRELIMINARY CLIENT APPROVAL PLANNING BUILDING REGS TENDER CONSTRUCTION AS-BUILT 1:20 gradient ramping not exceeding 10m going; total ramp CDM REGULATIONS going 22460mm; total rise 943mm with 2 nr 1800 landings 1500 The Principal Contractor is responsible for preparing a Construction Phase Health and Safety Plan before commencing work, which shall include all necessary method statements and risk assessments and details of welfare facilities relating 22460 Gas Meter to the work shown on the plans and detailed in the specification. The Principal Contractor shall provide the Principal Designer with any information requested for the Health and Safety File. 482 943

Gas Meter 461

1:20 Ramp These works require statutory monitoring & official sign-off in the 9644 1800 9216 1800 absence of a Building Notice Application. All works to comply with the Approved Building Regulations; Document M. Long Section As Proposed Liaise as necessary with tenants of neighbouring properties. Provide New Surface Drainpipe suitable alternative access route during works c/w adequate screening & safety signage. Level foundation bottom depth to be a min. 650 mm below ex. lower communal footpath level at base of ramp. Retaining wall height to run

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Item 4 17-00598Report 105 KB DownloadRead as text
PDF
PD/17/06 Item 4: Application IP/17/00598/FPI3Report 213 KB Download

At this meeting

Whole meeting

Who was there

15 of 15 attended
SC
Councillor Stephen ConnellyCommittee Member, apologies, sent representative
SG
Councillor Sandra GageCommittee Member, present
PG
Councillor Peter GardinerChair, present
CJ
Councillor Carole JonesCommittee Member, present
BK
Councillor Bill KnowlesVice-Chair, present
CK
Councillor Colin KreidewolfCommittee Member, present
JM
Councillor Jeannette MacartneyCommittee Member, present
BR
Councillor Bryony RudkinCommittee Member, present
BS
Councillor Barry StuddCommittee Member, present
JC
Councillor John CarnallCommittee Member, present
DG
Councillor David GoldsmithCommittee Member, present
EH
Councillor Elizabeth HarsantCommittee Member, apologies, sent representative

All 15 on the meeting page

On this subject at Ipswich

Search all
  1. PD/17/06 Item 4 - Application IP/17/00598/FPI3This decision
  2. PD/26/01 Item 5 - Application IP/26/00156/FPI3Approved
  3. PD/25/07 Item 2 - Application IP/25/00377/FPI3Approved
  4. PD/25/02 Item 7 - Application IP/25/00348/FPI3Decided
  5. PD/24/12 Item 3 - Application IP/25/00097/FPI3Decided
  6. PD/24/11 Item 3 - Application IP/25/00019/FPI3Approved

More from Ipswich Planning & Development Committee

All decisions
MeetingDecisionOutcome
29 Jul 2026 Unconfirmed Minutes of Previous Meeting - 1 July 2026that the Minutes of the meeting held on 1 July 2026 be signed as a true record. Decided Open
29 Jul 2026 To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. Decided Open
29 Jul 2026 PD/26/03 Information for Councillors, including Planning Enforcement Updatethat the information for Councillors be noted. Noted Open
1 Jul 2026 Unconfirmed Minutes of Previous Meetingthat the Minutes of the meeting held on 3 June 2026 be signed as a true record. Decided Open
1 Jul 2026 To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies