Resolved
- Grant planning permission upon condition that (briefly):- 1. The development is to be constructed in accordance with the approved plans.
Planning & Development Committee approved this item on Wednesday 23 August 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
- Grant planning permission upon condition that (briefly):- 1. The development is to be constructed in accordance with the approved plans.
NOTES This drawing must not be reissued, loaned or copied without the written consent of Richard Vest Architectural Design Ltd. All errors, omissions, discrepancies should be reported to the originator immediately. All dimensions to be checked before 1:20 site fabrication by the contractor, his sub-contractor or supplier. Do not scale plans - use figure or grid dimensions where given. Any deviation from the drawing to be reported to the originator immediately. 1000
20000 Public Footpath The proposals incorporated in this drawing are designed to meet the requirements of the Building Regulations 2000, 943
Approved Documents A to P with all current editions, and all the British Standards and Codes of Practice referred to therein. The drawing is prepared on the basis that the designer will give no site supervision and will have no further involvement 18860 Ex. Edge Public Footpath once Local Authorities permission(s) has been obtained. Inspection Chamber New Gully Drawing issue status: PRELIMINARY CLIENT APPROVAL PLANNING BUILDING REGS TENDER CONSTRUCTION AS-BUILT 1:20 gradient ramping not exceeding 10m going; total ramp CDM REGULATIONS going 22460mm; total rise 943mm with 2 nr 1800 landings 1500 The Principal Contractor is responsible for preparing a Construction Phase Health and Safety Plan before commencing work, which shall include all necessary method statements and risk assessments and details of welfare facilities relating 22460 Gas Meter to the work shown on the plans and detailed in the specification. The Principal Contractor shall provide the Principal Designer with any information requested for the Health and Safety File. 482 943
Gas Meter 461
1:20 Ramp These works require statutory monitoring & official sign-off in the 9644 1800 9216 1800 absence of a Building Notice Application. All works to comply with the Approved Building Regulations; Document M. Long Section As Proposed Liaise as necessary with tenants of neighbouring properties. Provide New Surface Drainpipe suitable alternative access route during works c/w adequate screening & safety signage. Level foundation bottom depth to be a min. 650 mm below ex. lower communal footpath level at base of ramp. Retaining wall height to run
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Item 4 17-00598Report | 105 KB | DownloadRead as text |
PDF |
PD/17/06 Item 4: Application IP/17/00598/FPI3Report | 213 KB | Download |
Follow Planning & Development Committee at Ipswich and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jul 2026 | Unconfirmed Minutes of Previous Meeting - 1 July 2026that the Minutes of the meeting held on 1 July 2026 be signed as a true record. | Decided | Open |
| 29 Jul 2026 | To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. | Decided | Open |
| 29 Jul 2026 | PD/26/03 Information for Councillors, including Planning Enforcement Updatethat the information for Councillors be noted. | Noted | Open |
| 1 Jul 2026 | Unconfirmed Minutes of Previous Meetingthat the Minutes of the meeting held on 3 June 2026 be signed as a true record. | Decided | Open |
| 1 Jul 2026 | To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.