that £3,227.92 be allocated from the North West Area Committee budget towards the cost of improving one of the ‘jump off’ points at the Whitehouse Skate Park. Reason: To allow an application to be made for external funding and to protect the use of the Whitehouse Skate Park for local residents.
Word for word from the decision Ipswich published for this meeting.Source: democracy.ipswich.gov.uk
2.1The Whitehouse skate park is an important youth facility for North West Ipswich situated in Whitehouse Park. It was majority funded by the Big Local Trust in partnership with the Council. It was completed in 2015 and has since been a popular amenity for young people living in North West Ipswich and across the town.
2.2The ‘jump off’ point is a grass covered earthen mound that was originally installed as a sound dampening barrier to limit noise disturbance to nearby residences. Being adjacent to the northwest ramp, the mound has been used as seating by spectators and skaters waiting for a turn. It also serves as a ‘jump off’ point for skaters to launch themselves down the ramp and conversely to dismount.
Northwest ramp
Jump off point
Figure 1 – Aerial view of Whitehouse Skate Park
2.3The mound has not proven hardwearing enough for this use, for which it was not designed, and it has begun to deteriorate. This has had the combined effect of breaking down the mound and of causing mud to be washed onto the northwest ramp. The even concrete surface of the ramp is important for skateboards to run smoothly and the muddy deposit can disrupt the use of the park. Debris on the ramp surface can halt skateboards suddenly and cause skaters to fall & be injured. Figure 2 – View of ramp and deteriorated mound
2.4The deterioration of the ‘jump off’ has been identified as a problem by skaters that use the park. Members of the Big Local Trust, the North West Ipswich Open Spaces (a friends group to Whitehouse and other parks in the area) have subsequently met on site with the area committee chair and a Parks & Cemeteries officer to consider the problem.
2.5The Council’s Landscape Officer has proposed installing stepped sleepers on a solid aggregate (crushed stone mix) base with an artificial grass carpet covering over the sleepers for appearance, durability and grip. This will extend the jump point for skaters and provide a solid & durable seating structure.
Figure 3 – Indicative cross section of proposed improvement
2.6The work will need to comply with the planning permission granted to the Skate Park (15/00582/FPI3) as the earth mound (referred to within the application as an acoustic bund) was a condition of that permission. It is necessary for a ‘variation of condition application’ to be granted and the cost of application is included in the project.
2.7The project costs are;
Planning application £234.00
Landscape works £15,993.92
Total £16,227.92
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
NWAC/24/08 Area Committee Budget Updatethat the Financial Statement in Appendix 1 to the report be noted. Reason: to provide clear and transparent details o...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.