CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Ipswich Borough Council
Planning & Development Committee, Wednesday 14 November 2018 at 9.30am

PD/18/06 Item 2 - Application IP/18/00793/FUL

Agreed Planning 3 papers

Planning & Development Committee agreed this item on Wednesday 14 November 2018. Below is the council's own wording, with the papers it was decided on.

Item64

Resolved

- Grant planning permission for the development subject to:- A) The completion of a legal agreement under provisions of section 106 of the Town and Country Planning Act (1990) dealing with the following matter: i ) A Real Time Passenger Information screen to be installed by the County Council at a local bus stop: contribution £10,000. ii) A bus shelter to be installed by the Borough Council at a local stop: contribution £6,000. B) Grant planning permission upon condition that (briefly):- 1. Development to be in accordance with approved plans. 2. Details to be submitted and approved:- External lighting; Soft landscaping maintenance programme over 5 year period; Renewable or low-carbon energy provision; Ecological enhancement measures; Secure cycle storage details. 3. Details provided for boundary treatment, refuse/recycling facilities, disabled parking, hard and soft landscaping and materials to be undertaken in accordance with submitted drawings. 4. 5 year protection of the soft landscaping works to be agreed. 5. Details required of any unsuspected contamination post commencement of development. 6. Within one month of first occupation, each employee on the commercial site shall be provided with Travel Information Pack that contains sustainable transport information and measures to encourage the use of sustainable transport. Not less than 3 months prior to the occupation, a completed Travel Information Pack shall be submitted to and approved in writing by the Local Planning Authority in consultation with the Highway Authority and shall include ... view the full minutes text for item 64.
Word for word from the decision Ipswich published for this meeting. Source: democracy.ipswich.gov.uk

Follow this further

Built from Ipswich's papers

What the report saysPro

Report to Planning & Development Committee

This drawing is copyright of DT Architects. Do not scale from this drawing. Check all dimensions onsite. The contractor shall bring any discrepancies immediately to the notice of the Architect.

Existing Building

Existing steps Existing footpath and bollards 1.8m high anti climb fence Existing footpath

1.8m high anti climb fence New section of concrete retaining wall

security gates New swing 31.600 32.600 (E) New 5.5m wide tarmac ramp 31.200 (E) 31.030 (E)

New section of concrete retaining wall with new handrail

31.325 31.200 Existing block paving 5000 6000 5000 Cycles 5000 6000 5000

1.8m high anti climb fence

Lockable Bollards 2500 2500 Rad

WC 2500 2500

Existing fence SV W P E BT

Footpath Canopy over

Existing tarmac

wall to remain with cocnrete retaining Existing section of to be planed off

new handrail wearing course Block paving New electric car parking area substation on 5m x 4m area

Electric charging parking space

Electric charging 33.110 (E) parking space 34.030 (E) New level to be no Electric charging higher than 33.55 parking space

th New 1.8m high New fire escape stair

tpa Cycle shelter

Exisitng substation

Foo timber fenced

to be relocated AC compound 33.250 Void Under Stair New section of concrete retaining 31.200 wall with new

ce ti High Level Vent

fen an handrail

mb igh 31.500

cli m h 03 02

High Level Vent

1.8New steps 6m wide access road to carpark 04 01

0 .60

ga g rity in 31

tes cu sw Security Grille Roller Shutter

se ew 05 5.5m wide access road

N to basement carpark 31.730 Basement 06 FFL 31.730

b fe anti nce clim high High Level Vent 07 14 New

m 1.8 BL BL

Basement bin Canopy D D

P P

RW RW Car Park store 6.7m tarmac Sliding Door (Escape Override) SVW P E BT

Rad 08 13 access road WC

Cycles

1.8m high anti FFL: 31.000m

High Level Vent 09 12 climb fence approx.

Bin Store

kneera nd rail

P RW il fence 10 11 SV BT

P G E

st a W Preparation Area

high po Access To

High Level Vent WC Retain existing kerb Ground Floor Redirection of

timber 600mm existing ramp Stairs P02 Planning application issue. 23.08.2018 Cycle shelter

Footpath Lift P01 Pre-planning application issue. 08.08.2018

High Level Vent revision note date (Exact Layout subject Gravel margin to Tenant Fit Out)

client

P RW Block paving Main entrance Fred. Olsen Ltd. White House Road Ipswich Existing tarmac Main Entrance project title

Existing site sloped Artisan Proposed Office Building

P P

RW RW drawing title Existing sign Basement Site Plan General Arrangement Layout drawing status 33.390 (E) 600mm high post and rail 32.580 (E) timber kneerail fence Architectural Planning scale date

1 : 200 @ A1 June 2018 project number drawing number revision

2304 AP0100 P02

01733 393010 www.dtarchitects.co.uk

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Item 2 18-00793(1)Report 3.2 MB DownloadRead as text
PDF
Item 2 18-00793(2)Report 1 MB Download
PDF
PD/18/06 Item 2: Application IP/18/00793/FULReport 308 KB Download

At this meeting

Whole meeting

Who was there

13 of 14 attended
SC
Councillor Stephen ConnellyCommittee Member, present
SG
Councillor Sandra GageCommittee Member, present
PG
Councillor Peter GardinerChair, present
CJ
Councillor Carole JonesCommittee Member, present
BK
Councillor Bill KnowlesVice-Chair, present
CK
Councillor Colin KreidewolfCommittee Member, present
JP
Councillor Jan ParryCommittee Member, present
BR
Councillor Bryony RudkinCommittee Member, apologies
BS
Councillor Barry StuddCommittee Member, present
JC
Councillor John CarnallCommittee Member, present
BH
Councillor Bob HallCommittee Member, present
EH
Councillor Elizabeth HarsantCommittee Member, apologies, sent representative

All 14 on the meeting page

On this subject at Ipswich

Search all
  1. PD/18/06 Item 2 - Application IP/18/00793/FULThis decision
  2. PD/26/01 Item 1 - Applications IP/25/00532/LBC & IP/25/00533/FULAgreed
  3. PD/26/02 Item 2 - Application IP/26/00014/FULApproved
  4. PD/25/07 Item 1 - Application IP/24/00118/FULApproved
  5. PD/25/02 Item 4 - Application IP/25/00070/FULApproved
  6. PD/25/02 Item 6 - Application IP/25/00302/FULDecided

More from Ipswich Planning & Development Committee

All decisions
MeetingDecisionOutcome
29 Jul 2026 Unconfirmed Minutes of Previous Meeting - 1 July 2026that the Minutes of the meeting held on 1 July 2026 be signed as a true record. Decided Open
29 Jul 2026 To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. Decided Open
29 Jul 2026 PD/26/03 Information for Councillors, including Planning Enforcement Updatethat the information for Councillors be noted. Noted Open
1 Jul 2026 Unconfirmed Minutes of Previous Meetingthat the Minutes of the meeting held on 3 June 2026 be signed as a true record. Decided Open
1 Jul 2026 To Confirm or Vary the Order of Businessthat the Order of Business be confirmed as printed on the Agenda. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies