Resolved
Grant of planning permission for the development subject to:- A) The completion of a legal agreement under provisions of section 106 of the Town and Country Planning Act (1990) dealing with the following matter: i ) Primary school contribution (£12,181) ii) Libraries contribution (£224) B) Grant planning permission upon condition that (briefly):- 1. Development to be in accordance with plans. 2. Details to be submitted and approved:- External materials; Hard and soft landscaping Including external surfaces; Details of ecological enhancement measures; Details of renewable and/or low carbon sources to be used; External lighting details; Details of CCTV coverage; Details of acoustic glazing and acoustic trickle vents; Full details of the installation of a mechanical heat-recovery ventilation system (MVHR) or similar system; Full details of a proposed air-cooling system or similar system; Details of secure postal boxes. 3. Details to be submitted and approved :- Detailed drawings of the proposed screening structure on the east elevation including materials; Detailed drawing of the proposed balcony structure to north elevation; Detailed drawing of the proposed balconies to the west elevation, including details and materials of external staircase; Details of all proposed windows and doors; Details of proposed staircase enclosure and balustrade to roof of principal building. 4. Dwellings to meet energy and water efficiency requirements, unless demonstrated neither feasible nor viable. 5. Areas for parking of cycles and PTW as shown on submitted drawings to be provided and retained and used for no other purpose. 6. Areas for storage of Refuse/Recycling bins as shown on submitted drawings to be provided and retained and used for no other purpose. 7. Prior to occupation, details of the area to be provided for the loading and unloading by service vehicles shall be submitted to and approved. 8. Prior to development, details of the drainage strategy and its maintenance and management to be submitted and approved. 9. Prior to occupation, details of the long-term management of communal areas and refuse/recycling facilities to be submitted. C) That the Planning and Development Operations Manager be authorised to refuse planning permission in the event that such a legal agreement has not been completed within the period of 6 months (or other time frame to be agreed), as the requirements necessary to make the development acceptable had not been secured through a s106 planning obligation contrary to Policy CS17 of the Core Strategy and Policies DPD 2017. INFORMATIVES: 1. Ipswich Borough Council supports the use of automatic sprinkler systems. 2. Suffolk Constabulary comments Councillor Rudkin left the meeting.