Item104
Resolved
Grant of planning permission subject to conditions (briefly): - 1. The development is to be in accordance with the approved plans submitted with the application including materials and boundary treatments. 2. Details to be submitted and approved : - Gas Protection Measures, means to prevent the discharge of surface water onto highway; hard landscaping; soft landscaping; biodiversity enhancement measures; and garden sheds. Development to be in accordance with approved details. 3. Dwellings to meet the necessary energy and water efficiency levels. 4. Existing vehicular access to be improved, laid out and completed in all respects in accordance with SCC specification DM01; and with an entrance width of 4.5 metres and thereafter retained. 5. Provide clear visibility at a height of 0.6 metres above the carriageway level prior to first use of the access and thereafter permanently maintained. 6. Notwithstanding the provisions of Part 2 Class A of the Town & Country Planning (General Permitted Development) Order 2015 (or any Order revoking and re-enacting that Order with or without modification) no obstruction over 0.6 metres high shall be erected, constructed, planted or permitted to grow within the areas of the visibility splays. 7. The improved access onto the highway shall be properly surfaced with a bound material for a minimum distance of 5 metres from the edge of the metalled carriageway, in accordance with details submitted to and approved by the local planning authority. 8. Areas for manoeuvring and parking of vehicles, bin storage and cycle storage shall be provided in accordance with the approved plans before first occupation and thereafter retained. 9. A Construction Management Plan shall be submitted and approved in writing by the Local Planning Authority. The development shall be constructed in accordance with this agreed plan. 10. Removal of permitted development to bungalow restricting new roof enlargements, alterations and roof openings providing new windows in rear roof slope. INFORMATIVES: 1. Highways Informative- Offence to carry out works within the public highway. 2. If gas-fired boilers are provided at the development, they should meet a minimum standard of <40mgNOx/kWh. 3. Note regarding any unexpected ground conditions.
Word for word from the decision Ipswich published for this meeting.
Source: democracy.ipswich.gov.uk