Resolved
Grant of planning permission subject to the following conditions (briefly): 1. Development to be in accordance with the approved drawings. 2. Details relating to external facing materials to be supplied and approved by the LPA. 3. Details relating to biodiversity enhancement, shower and locker facilities, fire hydrants, security and access arrangements including CCTV details, to be submitted and approved by the LPA before first use. 4. Details of hard and soft landscaping and planting, including tree planting and maintenance to be provided and approved by the LPA. Any trees or plants that die within 10 years to be replanted. 5. Conditions requiring a programme of archaeological work to be fully implemented in accordance with a Written Scheme of Investigation. 6. Details relating to decentralised and renewable or low carbon energy (15% of energy supply unless demonstrated unfeasible or unviable). 7. Development to meet BREEM Very Good standard. 8. Conditions relating to contaminated land- Phase 2 survey to be undertaken and any mitigation to be fully implemented. 9. Condition relating to noise control for protection of the nearest residential properties. 10. Finished floor level to be 3.5 metres AOD or higher. Details to be provided and agreed by the Local Planning Authority. 11. Submission of Business Flood Evacuation Plan (BFEP) to the LPA for agreement prior to the use commencing. The hotel to operate and be managed fully in accordance with the BFEP. 12. Details of flood resilience/resistance design measures and, materials to be provided in advance of construction of the fabric of the building. 13. Details relating to surface water drainage to be provide and agreed prior to implementation of the drainage measures. 14. Submission of Construction Management Plan including dust impact assessment to be submitted and agreed by the LPA prior to commencement of works on site. 15. Details of the areas and infrastructure to be provided for the manoeuvring and parking of vehicles including powered two-wheeled vehicles and, electric gates, as well as secure cycle storage. 16. Details showing the means to prevent the discharge of surface water from the development onto the highway. 17. No other part of the development shall be commenced until the vehicular accesses have been laid out and completed in all respects in accordance with Drawing No. 4120_PL01A. 18. The areas to be provided for storage of Refuse/Recycling bins as shown on Drawing No. 4120_PL01A shall be provided in its entirety. 19. Electric vehicle Charging spaces to be provided in accordance with the Suffolk Parking ... view the full minutes text for item 35.