Item125
Resolved
Grant of planning permission subject to the following: A. Receipt of mitigation in relation to the Suffolk Coast Recreational Avoidance and Mitigation Strategy (RAMS) – £243.78. B. Grant of planning permission subject to the following conditions (briefly): 1. Development to be in accordance with plans. 2. Details to be submitted and approved:- Hard and soft landscaping including external surfaces; Details of the specification to be provided for secure cycle storage; Boundary treatments; Ecological enhancement and mitigation measures. All agreed details to be provided prior to occupation. 3. Details to be submitted and approved:- External materials. Agreed details prior to works to external elevations. 4. Dwellings to meet necessary energy and water use sustainability targets as required by policy DM1. 5. Notwithstanding the approved drawings, the side elevation first floor windows shall be non-opening where below 1.7m from finished floor level, and obscure glazed. 6. Air quality measures to be implemented as per submitted Air Quality Exposure Assessment. 7. Removal of PD rights – Classes A, B, C and E relating to all extensions (including roof) and erection of other outbuildings over 10 cubic metres. 8. Reporting of any previous unidentified contamination. 9. No other part of the development hereby permitted shall be commenced until the existing vehicular access has been improved, laid out and completed. 10. No other part of the development hereby permitted shall be commenced until the new vehicular access has been laid out and completed. 11. The gradient of the vehicular access(es) shall not be steeper than 1 in 20 for the first five metres measured from the nearside edge of the highway. 12. The gradient of the access driveway(s) shall not be steeper than 1 in 12 measured from the nearside of the edge of the highway. 13. Prior to the development hereby permitted being first occupied, the new access(es) onto the highway shall be properly surfaced with a bound material for a minimum distance of 5 metres. 14. Before the access(es) is first used visibility splays shall be provided as shown on Drawing No. 22-030-PL-03A with an X dimension of 2.4 metres and a Y dimension of 25 metres of the access(es) tangential to the nearside edge of the carriageway and thereafter retained in the specified form. 15. Before the development is commenced details of the areas to be provided for the presentation of refuse and recycling bins shall be submitted to and approved. 16. The use shall not commence until the area(s) within the site shown on Drawing No. 22-030-PL-02B for the purposes of manoeuvring and parking of vehicles. 17. Before the development is commenced details of electric vehicle charging infrastructure shall be submitted to ... view the full minutes text for item 125.
Word for word from the decision Ipswich published for this meeting.
Source: democracy.ipswich.gov.uk