Resolved
RESOLVED that planning permission be granted subject to conditions, including conditions covering the following: · 5-year time limit to commence the scheme, given the extra time that is typically required to complete all the statutory procedures for major development proposals; · details of the carriageway design and all finished surfaces, including the kerb lines; dropped kerbs; tactile paving, pedestrian crossings and vehicle crossovers; · details of all structures, signage and other street furniture; including seating; litter bins; bollards; cycle racks; pedestrian signage and bus shelters; · details of all lighting and CCTV elements; · details of further noise mitigation measures; · details of landscaping (including tree and hedge protection during the installation); · details of surface drainage; including prevention of discharges to the highway; and details of the underground storage system for discharge to the River (at a rate 4 litres per second per hectare) and of flood pathways under the proposed road; · details of Victoria Square (including dimensions, materials, street furniture, public art and other materials); · details of the finished road and site levels; · details of each of the proposed access points to adjacent development sites prior to the construction of such accesses. · the provision and maintenance of visibility splays; · the widths and design details of the Public Rights of Way; · submission of a Waste Management Plan; · submission of a Management and Maintenance Strategy; · submission of a Code of Construction Practice; · provisions for contractor’s parking, deliveries, off-loading and turning; · submission of a full highway and public realm Safety Audit; · implementation of a programme of archaeological work; · recommendations of the habitat survey to be carried forward, and a long term habitat mitigation strategy to be submitted, · measures to prevent groundwater contamination; · precautions to prevent the deposit of mud on the public highway; · a sustainability statement for construction materials; · the implementation of all details to be submitted. (3) It was further agreed that the applicants be advised of the need to investigate the following aspects: · the scope for using renewable energy sources for the proposed lighting, such as solar power; · the scope for minimising the extent of any street works by the Utility companies and ensuring the quality of any associated restoration work; · the use of porous paving surfaces and Sustainable Urban Drainage Systems generally on this scheme; · the habitat survey recommendations to be carried forward, such as the impact of lighting on bats.