RESOLVED that permission be granted to the proposal subject to conditions, including conditions requiring the mobile classrooms to be removed from the site no later than 5 years from the date of this permission; a restriction on the teaching usage of the mobile classrooms to subjects which do not involve amplified music; and requiring the orientation of the buildings to accord with the plans submitted, with no rear windows facing the boundary on Westlands Avenue.
Word for word from the decision Kent published for this meeting.Source: democracy.kent.gov.uk
Report to Planning Applications Committee, 9 pages
Item D6 Installation of 3 mobile classrooms at The Westlands School, Westlands Avenue, Sittingbourne - SW/10/333
A report by Head of Planning Applications Group to Planning Applications Committee on 11 May 2010
Application by Kent County Council, Children Families and Education for the installation of 3 mobile classrooms at The Westlands School, Westlands Avenue, Sittingbourne, Kent, ME10 1PF- SW/10/333
Recommendation: Subject to the views of Swale Borough Council permission be granted subject to conditions, including the mobile classroom being removed from the site within 5 years of the date of the permission.
Local Member: [name removed]: Unrestricted
Site
1. The Westlands School is situated within a residential development south of the A2 London Road on the edge of Sittingbourne. The Local Plan shows it as being outside of the built-up area boundary and within the countryside gap to the south. The school is enclosed by residential properties on three sides; to the north by London Road and Westlands Avenue, to the east by Somerset Close and to the west by Maylam Gardens. Open fields abut the southern boundary. The school occupies a relatively large site; totalling 10.95 hectares. The school consists of a number of permanent and temporary structures and has been subject to a significant level of development over the past 5 years. A site location map is attached.
Background and Proposal
2. The proposal is to install three mobile classroom units on a piece of grassland in the north-west corner of the site. It arises from the School’s need for additional teaching space as a consequence of an increasing roll. The School has stated that the classrooms would not be allocated to specific subjects, rather providing flexible teaching accommodation to deliver the curriculum. Each mobile classroom unit would measure 8.6 metres in length, 5.5 metres in width, and 3.2 metres in height. The application documents specify that the mobiles classrooms would have a dark green textured finish, PVC double glazed windows and a high performance grey/green felt roofing system to match the existing mobiles on site.
3. The school site and the general location of the proposed mobile classrooms has seen extensive development over recent years, with both permanent and temporary structures. In 2005, permission was granted for the erection of the Pyramid Centre to house the school’s Physically Disabled Unit. Three years later permission was granted for two 2-bay mobile classrooms to be situated adjacent to the Pyramid Centre and in 2009, two additional 2-bay mobiles were granted permission. The result of these three developments is shown on the site plan on page D6.3.
D6.1 Item D6 D6 3 mobile classrooms at The Westlands School, Westlands Avenue, Sittingbourne – SW/10/333
A249 Location map
A2 London Road
The Westlands School
Site location map Westlands Avenue A2 London Road
Maylam Gardens
D6.2 Item D6 D6 3 mobile classrooms at The Westlands School, Westlands Avenue, Sittingbourne – SW/10/333
Site plan
Existing mobiles Pyramid Centre
Proposed mobiles
Elevations
D6.3 Item D6 D6 3 mobile classrooms at The Westlands School, Westlands Avenue, Sittingbourne – SW/10/333
4. The applicant states that there are limited locations available to the School for the installation of new mobile classroom units without encroaching onto sports pitches. Further, the School explains that numerous enabling works were carried out during the installation of the existing mobiles on the adjoining land ensuring the area is fully accessible and suitable for school use. The existing access ramp would be extended to allow access to the proposed mobiles. Therefore the applicant deems this location to be the most appropriate.
Planning Policy
5. (i) The South East Plan:
Policy CC1: Seeks to achieve and maintain sustainable development in the region.
Policy CC4: Expects that all new development will adopt and incorporate sustainable construction standards and techniques.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
37Proposal SW/10/333 - Three mobile classrooms at The Westlands School, Westlands Avenue, Sittingbourne; KCC Children, Families and EducationThis decision
Proposal SW/10/333 - Three mobile classrooms at The Westlands School, Westlands Avenue, Sittingbourne; KCC Children, Families and EducationThis decision
Minutes of the Meeting Held on 17.6.2026RESOLVED that the minutes of the meeting held on 17 June 2026 were correctly recorded and that they be signed by the ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.