Resolved
RESOLVED that:- (a) permission be granted to the proposal subject to conditions, including conditions covering a 5 year implementation period; the development being carried out in accordance with the permitted details; the development being carried out in accordance with submitted Flood Risk Assessment; the provision of compensatory flood storage capacity on site to a 100 year (20% climate change) standard; the finished floor level within both the MASH and Specialist Nursery being set no lower than 40.42m AOD; a Community Use Agreement including the hours of community use of the new playing fields; an assessment of the ground conditions of land proposed for replacement playing fields; a scheme to ensure that new playing fields are provided to an acceptable quality (including appropriate drainage where necessary); the playing field ground level to be agreed in discussions with the Environment Agency; details of external materials; the submission of a detailed landscaping scheme and its implementation within the first planting season following construction activities; measures to prevent mud and debris being tracked out onto the public highway, including arrangements for wheelwashing on site during the construction period; parking being on site for construction operatives and construction vehicles during the construction works period; vehicle and cycle parking (as proposed in the application) being provided prior to the first occupation of the building and being permanently retained on site thereafter; the submission of a site Travel Plan within six months of the first occupation of either and/or both the two buildings (whichever date occurs first), and on-going monitoring and review thereafter; the submission of badger and bat surveys, with any necessary mitigation measures being provided prior to commencement and during construction activities; the erection of newt and reptile fencing around the construction site prior to and during all construction activities; the submission of biodiversity enhancement measures to be incorporated on site; details of external lighting being agreed; a limit on the hours of construction; further archaeological works and mitigation being agreed by the Planning Authority following findings from pre-determination trial trenching; and surface water drainage measures being agreed; and (b) the applicant be reminded by Informative of the requirement to sign up to the Environment Agency’s Flood Warning System; the requirement for vehicles to observe the left hand turn in and out of the site entrance/exit slip road with the A28 Great Chart Bypass at all times; and the requirement to ensure that the electricity pole is relocated at a suitable location