Resolved
RESOLVED that:- (a) permission be granted to Application TM/10/3056 subject to conditions, including conditions covering a 5 year implementation period; the development being carried out in accordance with the permitted details; the movement of oversize biomass from the Composting Facility to the proposed electricity generating installation, the delivery of ancillary supplies and collections of process outputs being confined to between 07:00 to 18:00 Monday to Friday, 07:00 to 13:00 on Saturdays, no movements on Sundays, 07:00 to 17:30 on Bank and Public Holidays, and no movements on 25 and 26 December and 1 January; the external colour treatment of the exhaust stack being ‘brown-green’ (RAL 6008) with the construction materials of the new energy building matching the existing one; details of surface water drainage being agreed prior to commencement; the operation being time-limited to the life of the site as stipulated for the main Composting Facility (i.e. 20 years from first commercial composting operations in 2008); the site being restored as part of the details approved for the main Composting Facility in Permission TM/09/3231; the pyrolysis plant operating with only the waste imported to the site pursuant to the existing Composting Facility (as covered by Permission TM/09/3231); the combined numbers of site HGV movements being restricted to those detailed in the main Composting Facility Permission (TM/09/3231); appropriate measures to guard against mud and debris being tracked to the public highway; noise levels not exceeding those provided for by Condition 24 of the composting Permission (TM/09/3231); and with the exception of any material that has first been treated in the composting process, all material transfer between the waste reception halls and energy building must be undertaken via fully enclosed infrastructure linked to the odour control system; and (b) ap proval be given in respect of Application TM/09/3231/R5 subject to a condition requiring that the transfer of all waste materials between the waste reception buildings and phase 1 and phase 2 composting halls must take place via fully enclosed infrastructure linked to the odour control system unless it is not possible to transfer waste through the western phase 1 composting hall because it is full.