Application GR/13/702 (KCC/GR/0240/2013) Engineering operations comprising ground works to create a development platform and a temporary waste handling facility for excavated material and other ancillary works at Church Path Pit, Northfleet Works, The Shore, Northfleet; Lafarge Cement Ltd
ApprovedPlanning1 paper
Planning Applications Committee approved this item on Wednesday 11 December 2013. Below is the council's own wording, with the papers it was decided on.
RESOLVED that permission be granted to the application subject to conditions, including conditions covering the duration of the development being for a period of 18 months from the date of the permission; the materials being restricted to Crossrail tunnel arisings , imported by rail (unless otherwise approved beforehand in writing by the County Council); the creation of the development platform prior to the stockpiling of materials (unless otherwise approved beforehand in writing by the County Council); the prior approval of a revised Code of Construction Practice; no development taking place until consent has been obtained under Section 61 of the Control of Pollution Act (1974); hours of use being restricted to between 0800 and 1800 hours on Mondays to Fridays and 0800 and 1300 hours on Saturdays, with no Sunday, Bank or Public Holiday working; the Drainage Strategy dated November 2013 being implemented as proposed; no infiltration of surface water into groundwater except as provided for in the Drainage Strategy, unless approved beforehand in writing by the County Council; the remediation of contaminated land (if found to be present); no water or effluent being discharged onto High Speed 1 (HS1) apparatus or into its drainage system; the Implementation of the recommendations of the report on the tunnel between St Botolph’s Pit and the main Northfleet Works site; compliance with the reports relating to stockpile stability dated 24 September 2013 and 11 November 2013 (including stand-offs between material stockpiles and HS1 apparatus); the ecological measures and works being undertaken as proposed, together with additional post-translocation monitoring; the ... view the full minutes text for item 69.
Word for word from the decision Kent published for this meeting.Source: democracy.kent.gov.uk
Report to Planning Applications Committee, 31 pages
SECTION C MINERALS AND WASTE DISPOSAL
Background Documents - the deposited documents; views and representations received as referred to in the reports and included in the development proposals dossier for each case; and other documents as might be additionally indicated. Item C1 Application by Lafarge Cement UK for engineering operations comprising ground works to create a development platform and a temporary waste handling facility for excavated material and other ancillary works on land at Church Path Pit, Northfleet Works, The Shore, Northfleet, Gravesend, Kent, DA11 9AN – GR/13/702 (KCC/GR/0240/2013)
A report by Head of Planning Applications Group to Planning Applications Committee on 11 December 2013.
Application by Lafarge Cement UK for engineering operations comprising ground works to create a development platform and a temporary waste handling facility for excavated material and other ancillary works on land at Church Path Pit, Northfleet Works, The Shore, Northfleet, Gravesend, Kent, DA11 9AN.
Recommendation: Permission be granted subject to conditions.
Local Members: [name removed] and [name removed] description and background
1. The application site comprises 5.7 hectares (ha) of land in Church Path Pit, Northfleet, Kent. The old chalk quarry covers a total of 8.6 ha and forms part of the former Northfleet Cement Works site on the south bank of the River Thames in Gravesham. Although the northern part of the application site is formally known as St Botolph’s Pit, the term Church Path Pit has been used for ease of reference by the applicant and in this report. Church Path Pit is bounded to the north, east and west by chalk cliffs between 15 metres (m) and 25m in height and to the south by the North Kent railway line. The land above the cliffs is primarily in residential use (e.g. South Kent Avenue, East Kent Avenue, Council Avenue, Northfleet High Street, Vicarage Drive, Church Path, Springhead Road) with some retail and ecclesiastical uses (e.g. The Hill). The majority of the cliffs are nearly 25m high (including those in St Botolph’s Pit and on the northern and eastern boundaries of Church Path Pit). Those on the south western boundary of Church Path Pit (adjacent to South Kent Avenue) are approximately 15m high. The site location and key features referred to in this report are illustrated on the plans on pages C1.2 and C1.3.
C1.1 Item C1 Application by Lafarge Cement UK for engineering operations comprising ground works to create a development platform and a temporary waste handling facility for excavated material and other ancillary works on land at Church Path Pit, Northfleet Works, The Shore, Northfleet, Gravesend, Kent, DA11 9AN – GR/13/702
C1.2 Item C1 Application by Lafarge Cement UK for engineering operations comprising ground works to create a development platform and a temporary waste handling facility for excavated material and other ancillary works on land at Church Path Pit, Northfleet Works, The Shore, Northfleet, Gravesend, Kent, DA11 9AN – GR/13/702
C1.3 Item C1 Application by Lafarge Cement UK for engineering operations comprising ground works to create a development platform and a temporary waste handling facility for excavated material and other ancillary works on land at Church Path Pit, Northfleet Works, The Shore, Northfleet, Gravesend, Kent, DA11 9AN – GR/13/702
C1.4 Item C1 Application by Lafarge Cement UK for engineering operations comprising ground works to create a development platform and a temporary waste handling facility for excavated material and other ancillary works on land at Church Path Pit, Northfleet Works, The Shore, Northfleet, Gravesend, Kent, DA11 9AN – GR/13/702
C1.5 Item C1 Application by Lafarge Cement UK for engineering operations comprising ground works to create a development platform and a temporary waste handling facility for excavated material and other ancillary works on land at Church Path Pit, Northfleet Works, The Shore, Northfleet, Gravesend, Kent, DA11 9AN – GR/13/702
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Application GR/13/702 (KCC/GR/0240/2013) Engineering operations comprising ground works to create a development platform and a temporary waste handling facility for excavated material and other ancillary works at Church Path Pit, Northfleet Works, The Shore, Northfleet; Lafarge Cement LtdReport
69Application GR/13/702 (KCC/GR/0240/2013) Engineering operations comprising ground works to create a development platform and a temporary waste handling facility for excavated material and other ancillary works at Church Path Pit, Northfleet Works, The Shore, Northfleet; Lafarge Cement LtdThis decision
Application GR/13/702 (KCC/GR/0240/2013) Engineering operations comprising ground works to create a development platform and a temporary waste handling facility for excavated material and other ancillary works at Church Path Pit, Northfleet Works, The Shore, Northfleet; Lafarge Cement LtdThis decision
Minutes of the Meeting Held on 17.6.2026RESOLVED that the minutes of the meeting held on 17 June 2026 were correctly recorded and that they be signed by the ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.