Application DA/13/1491 (KCC/DA/0226/2013) - Temporary consent (5 years) for the operation of a construction and recycling facility for concrete and road base planings and ancillary plant storage areas, reception weighbridge office and parki
ApprovedPlanning1 paper
Planning Applications Committee approved this item on Friday 24 January 2014. Below is the council's own wording, with the papers it was decided on.
RESOLVED that permission be granted to the application subject to conditions, including conditions covering the standard time limit for implementation (3 years from the date of decision); the operation ceasing no later than 5 years from the date of the permission; the development being carried out set out in the approved plans; hours of operation being restricted to 0600 and 1800 on Mondays to Fridays and 0600 to 1200 on Saturdays with no operating hours on Sundays or Bank Holidays, with essential deliveries of waste awaiting recycling at night time; the number of vehicle movements being restricted to no more than 10 HGV movements per day (5 in and 5 out), 8 car movements from staff vehicles (4 in and 4 out) and 1 LGV per day; a limit on the annual throughput to 40,000 tonnes per annum; the submission of a detailed surface water drainage scheme to accommodate mitigation of potential impacts on groundwater; the retention of parking spaces for vehicles and covered cycle spaces; the safeguarding of vehicle turning areas; the provision of loading/unloading and turning space for construction vehicles within the site during the construction period; stockpile heights being limited to 6m; parking for visitors and staff on site during construction; a detailed scheme of wheel wash facilities for the construction period (including methods for washing the underside of vehicles; details of any surface alterations with an agreed timescale for restoration prior to the use ceasing; and the sheeting of all vehicles delivering waste and exporting processed material.
Word for word from the decision Kent published for this meeting.Source: democracy.kent.gov.uk
Report to Planning Applications Committee, 12 pages
Item C2 Temporary consent (5 years) for the operation of a construction and recycling facility for concrete and road base/ planings and ancillary plant storage areas, reception, weighbridge office and parking at Eastern Quarry, Off Watling Street, Swanscombe, Kent (KCC/DA/0226/2013) ____________________________________________________________________________________________
A report by Head of Planning Applications Group to Planning Applications Committee on 24 January 2014
Application by OCL Regeneration Ltd. for temporary consent (5 years) for a recycling facility for concrete and road base/ planings and ancillary plant and storage areas, reception, weighbridge, office and parking at Land at Eastern Quarry, Off Watling Street, Swanscombe, Kent (KCC/DA/0226/2013)
Recommendation: Permission be granted subject to conditions.
Local Member: Peter Harman Classification: Unrestricted
Site Description:
1. Eastern Quarry is a former chalk quarry which supplied minerals to the now defunct Northfleet cement works. The whole quarry site has an outline planning permission (some areas with detailed consent) for a major mixed use development site. The eastern half of the site is the first to be built out, although the main estate roads, some drainage infrastructure and earth moving and landscaping has already taken place. Some of the former mineral related development remains in a derelict state and there are a number of hard standing areas around the site. The western half of the quarry is largely occupied by a lake which will be re-modelled as the approved development moves forward.
2. The application site within the red-line boundary, is approximately 0.6 hectares, 1.8 hectares including the long access road (approximately the size of a football pitch), at the south of the Eastern Quarry Development.
3. The access leading from the Roman Road (Leading from Bluewater to the A2) is approx. 180m from the Roman Road access to the facility, and slopes gradually down into the site, with the facility itself approx 5m lower than the Roman Road, separated from the boundary of the quarry by a dense layer of trees and scrubland atop a steep chalk face. To the north of the facility and set another 5m below this is a disused cement processing facility, which has mostly been demolished although a small number of buildings and hard standings remain.
4. The site is predominantly at an even level and partly screened from the north by existing trees and shrubs. At present there are two portacabin offices on the site and an aggregate processing machine.
C2.1 Item C2 Temporary consent (5 years) for the operation of a construction and recycling facility for concrete and road base/ planings and ancillary plant storage areas, reception, weighbridge office and parking at Eastern Quarry, Off Watling Street, Swanscombe, Kent (KCC/DA/0226/2013) ____________________________________________________________________________________________
Background / Relevant Planning History
5. The application site is a small part of an area previously used for the production of cement, construction aggregates and concrete and provided access to the now demolished office and production buildings.
6. Outline planning permission was granted by Dartford Borough Council for the Major Redevelopment of this old Quarry in 2007. It will be developed in a number of phases, providing over 6,000 dwellings, business premises, education facilities, sports, leisure and retail outlets. The planning permission itself covers a number of requirements for further submissions and completion of legal agreements. Some schemes have been submitted and approved by Dartford Borough Council and the first phase of the housing development has now commenced at the east of the wider former quarry.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Application DA/13/1491 (KCC/DA/0226/2013): Temporary consent (5 years) for the operation of a construction and recycling facility for concrete and road base planings and ancillary plant storage areas, reception weighbridge office and parking at Eastern Quarry, off Watling Street, Swanscombe; OCL ReReport
4Application DA/13/1491 (KCC/DA/0226/2013) - Temporary consent (5 years) for the operation of a construction and recycling facility for concrete and road base planings and ancillary plant storage areas, reception weighbridge office and parkiThis decision
Application DA/13/1491 (KCC/DA/0226/2013) - Temporary consent (5 years) for the operation of a construction and recycling facility for concrete and road base planings and ancillary plant storage areas, reception weighbridge office and parkiThis decision
Minutes of the Meeting Held on 17.6.2026RESOLVED that the minutes of the meeting held on 17 June 2026 were correctly recorded and that they be signed by the ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.