From: Mike Whiting, Cabinet Member for Planning, Highways, Transport and Waste Simon Jones, Director of Highways Transportation & Waste
To: Environment & Transport Cabinet Committee - 20 September 2018 Subject: Approach to Managing Highway Structures Classification: Unrestricted Past Pathway: NA Future Pathway: NA Electoral Division: Countywide
Summary: This paper outlines the approach taken to managing highway structures in Kent with specific reference to sub-standard highway structures Recommendation: The Cabinet Committee is asked to note the report and comment on the contents.
1. Introduction
1.1The County Council maintains 2,800 highway structures including bridges, tunnels, culverts, retaining walls and a number of heritage and listed assets . with no structural failures resulting in injury to persons reported in at least the past 30 years, which is as long as our records go back.
1.2Management of adopted highway structures, valued at an estimated £1.3bn, is undertaken by the Structures Team within Highways Asset Management. The team comprises three engineers and three specialist inspectors with considerable support from professional service providers. Although a relatively low-profile service from a customer service perspective, structures management is one of the most technically complex services provided by Highways Transportation & Waste (HTW).
1.3Management of highway structures is underpinned by detailed design standards and quality control processes and is supported by a regime of regular inspections. As a minimum, all highway bridges are subject to a two- yearly general inspection, during which an assessment is made of the physical condition of all visible elements of the highway structure. A more comprehensive principal inspection is carried out every six to twelve years depending on the risk associated with the location, usage and condition of the bridge. Additional monitoring, testing and assessments is carried out over and above this where it is deemed to be necessary due to the condition or complexity of a specific structure. 1.4 In March 2017, the RAC Foundation carried out a survey of local highway authorities with the support of the National Bridges Group of ADEPT (the Association of Directors of Environment, Economics, Planning and Transportation). It reported that 4.4% (3,203) of British local road network bridges over 1.5m in span are not fit to carry the heaviest vehicles now seen on our roads, including lorries of up to 44 tonnes. At the time of the report, 29 bridges over 1.5m span owned and maintained by KCC were identified as being included in this number.
1.5In light of the RAC Foundation report and in readiness for the routine 2019 review of structures, further analysis was carried out encompassing all highway structures. A total of 70 structures were identified of which 39 are highway structures owned and maintained by KCC. These structures comprise of the following:
1 pedestrian subway 25 bridges with a span greater than 3.0m 11 bridges with a span greater than 1.5m but less than 3.0m 2 bridges with a span greater than 0.9m but less than 1.5m
1.6The 31 other structures are owned, maintained and managed by third parties including Network Rail, Highways England and the Environment Agency, all of whom are considered to be competent bridge management authorities.
1.7The 39 highway structures owned and maintained by KCC are listed at Appendix A.
1.8KCC owns and maintains structures in other service areas, e.g. PROW and Education, which are not contained within the scope of this report.
2 Discussion
2.1The first government loading standards for highway bridges were introduced in 1922. The term “sub-standard” structure refers to any structure that does not fully meet with current design standards for loading. The current standards, detailed in BD 21: The Assessment of Highway Bridges and Structures, were published in 2001. Management of Sub-Standard Structures
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Approach to Managing Highway StructuresReport | 10 pages | DownloadRead as text |
PDF |
SUPPLEMENT Item 11: Approach to Managing Highways Appendix AAppendix | 5 pages | Download |
Follow Growth, Environment & Transport Cabinet Committee at Kent and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 7 Jul 2026 | Minutes of the meeting held on 05/05/2026RESOLVED that the minutes of the meeting held 5 May 2026 were a correct record and that a paper copy be signed by the... | Decided | Open |
| 5 May 2026 | Minutes of the meeting held on 10.03.2026RESOLVED that the minutes of the meeting held 10 March 2026 were a correct record and that a paper copy be signed by ... | Decided | Open |
| 5 May 2026 | Winter Service UpdateRESOLVED to note the Winter Service Update . | Noted | Open |
| 5 May 2026 | Tilbury-Gravesend Ferry UpdateRESOLVED to note the Gravesend to Tilbury Ferry Update. | Noted | Open |
| 5 May 2026 | 26/00018 - Prioritisation of Definitive Map Modification ApplicationsRESOLVED to endorse the proposed decision, namely: a) APPROVE the changes to the Statement of Priorities for Definiti... | Approved | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.