Application TM/19/2396 (KCC/TM/0211/2019) - Temporary development of an Anaerobic Digestion plant with ancillary gas-to-grid plant and associated infrastructure (part retrospective) at Blaise Farm Quarry, Blaise Quarry Road, Kings Hill, West Malling; Blaise Biogas Ltd
DecidedPlanning2 papers
Planning and Regulation Committee decided this item on Wednesday 16 September 2020. Below is the council's own wording, with the papers it was decided on.
RESOLVED that:- (a) t h eapp li cati o n be referred t o t he S e c r e t a r y of S t ate f or H o u s i n g , C om m u n i t i es a n dL o cal G ov e r nme n t a nd that subject to h i sd e c i s i o n permission be granted to the application subject to c o nd i ti o ns, including conditions covering o perat i ons c e a s ing no later than 20 y e ars from the c o mmenc e ment of c o m m er c ialanaerobic digestion (AD) oper a tion s , ther e mo v al o ft h efa c ilityand a l la s sociat e d infra s t r u c tu r e within a f ur t her12 monthsand t here s tor a tionof thesi t eto forestr y ,e c o log ic aland a m en i tyafte r -u s ewithin af u rth e r12 mont ... view the full minutes text for item 42.
Word for word from the decision Kent published for this meeting.Source: democracy.kent.gov.uk
Report to Planning and Regulation Committee, 43 pages
SECTION C MINERALS AND WASTE MANAGEMENT
Background Documents - the deposited documents; views and representations received as referred to in the reports and included in the development proposals dossier for each case; and other documents as might be additionally indicated. Item C1 Temporary development of an Anaerobic Digestion plant with ancillary gas-to-grid plant and associated infrastructure (part retrospective) at Blaise Farm Quarry, Blaise Quarry Road, Kings Hill, West Malling, Kent ME19 4PN - TM/19/2396 (KCC/TM/0211/2019)
A report by Head of Planning Applications Group to Planning Applications Committee on 16 September 2020.
Application by Blaise Biogas Ltd for Temporary development of an Anaerobic Digestion plant with ancillary gas-to-grid plant and associated infrastructure (part retrospective) at Blaise Farm Quarry, Blaise Quarry Road, Kings Hill, West Malling, Kent ME19 4PN - TM/19/2396 (KCC/TM/0211/2019)
Recommendation: Permission be granted subject to conditions.
Local Members: Sarah Hohler, Trudy Dean & Matthew Balfour Unrestricted
Site description
1. The application site is located alongside the existing In-Vessel Composting (IVC) facility operated by New Earth Solutions (Kent) Ltd within the excavated quarry void in the north eastern corner of Blaise Farm Quarry near Kings Hill, West Malling.
2. The excavated area is approximately 15 to 20m lower than the adjacent unexcavated ground and is bounded to the east by St Leonard’s Wood, to the north by farmland and planting associated with the quarry and to the west / south by those parts of the quarry that have yet to be fully worked. Offham lies about 750m to the north, West Malling about 1.4km to the north west and Kings Hill about 750m to the south west. Mereworth and Herne Pound lie further to the south. The nearest residential property (Blaise Farm House) is about 590m to the north west. A number of other residential properties lie beyond this distance between the site and both Offham and West Malling.
3. Access to the existing IVC Facility and the proposed facility is via a purpose built access road from the existing quarry access road and the A228 West Malling roundabout near Kings Hill.
C1.1 Item C1 Temporary development of an Anaerobic Digestion plant with ancillary gas-to-grid plant and associated infrastructure (part retrospective) at Blaise Farm Quarry, Blaise Quarry Road, Kings Hill, West Malling, Kent ME19 4PN - TM/19/2396 (KCC/TM/0211/2019)
Site Location Plan
C1.2 Item C1 Temporary development of an Anaerobic Digestion plant with ancillary gas-to-grid plant and associated infrastructure (part retrospective) at Blaise Farm Quarry, Blaise Quarry Road, Kings Hill, West Malling, Kent ME19 4PN - TM/19/2396 (KCC/TM/0211/2019)
4. The site lies in the Metropolitan Green Belt and St Leonard’s Wood is designated as both Ancient Woodland and a Local Wildlife Site (LWS). The remains of the Chapel of St Blaise (Scheduled Ancient Monument) lie about 100m to the north. The quarry has the benefit of a mineral permission (TM/88/1002) granted in 1994 which provides for the winning and working of ragstone until 2063. A public right of way (Footpath MR286) lies about 130m to the west of the application site. This will need to be diverted further west to facilitate mineral working at the quarry and to provide continuity for pedestrians wishing to access Footpath MR260 (Lords Walk) to the south west.
5. The application site currently contains the majority of the proposed Anaerobic Digestion and gas to grid facility, reflecting the part retrospective nature of the application. Although not allocated for any specific purpose in the development plan, Blaise Farm Quarry is safeguarded for mineral working in the Kent Minerals and Waste Local Plan.
6. The locations of Blaise Farm Quarry, site access, the application site and the existing IVC facility are illustrated on the drawing on page C1.2.
Planning History and Background
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Application TM/19/2396 (KCC/TM/0211/2019): Temporary development of an Anaerobic Digestion plant with ancillary gas-to-grid plant and associated infrastructure (part retrospective) at Blaise Farm Quarry, Blaise Quarry Road, Kings Hill, West Malling; Blaise Biogas LtdReport
42Application TM/19/2396 (KCC/TM/0211/2019) - Temporary development of an Anaerobic Digestion plant with ancillary gas-to-grid plant and associated infrastructure (part retrospective) at Blaise Farm Quarry, Blaise Quarry Road, Kings Hill, West Malling; Blaise Biogas LtdThis decision
Application TM/19/2396 (KCC/TM/0211/2019) - Temporary development of an Anaerobic Digestion plant with ancillary gas-to-grid plant and associated infrastructure (part retrospective) at Blaise Farm Quarry, Blaise Quarry Road, Kings Hill, West Malling; Blaise Biogas LtdThis decision
Minutes of the Meeting 12.11.2025RESOLVED that the minutes of the meeting held on 12 November 2025 were correctly recorded and that they be signed by ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.