Resolved
RESOLVED that permission be granted to the application subject to conditions, including conditions covering the development being commenced within 3 years; the development being carried out and completed in accordance with the submitted details, documents and plans; a maximum throughput of 75,000 tonnes per annum; no more than 48 HGV movements per day to the site as a whole (24 in / 24 out); records being maintained of all HGV movements, with the information being made available to the Waste Planning Authority on request; all loaded HGVs entering or leaving the site being enclosed, covered or sheeted, in line with the Dust and Noise Management Plan; no delivery of waste to the site by members of the public; areas shown for vehicle access, parking, turning, manoeuvring, loading and unloading being provided and retained; no parking on Caesar’s Way; a 10mph speed limit on Caesar’s Way; no vehicle greater than 7.5 tonnes in weight using Ashley Avenue to access the site; a r estriction of access on Saturdays to HGVs of 7.5 tonnes or less on Saturdays (to enable use of Tile Kiln Lane and avoid Ashley Avenue); the production of a Travel Plan to promote vehicle movements outside of peak hours (0730 to 0900 and 1630 to1830); core operating hours being 0700 to 1900 hours on Mondays to Fridays, 0700 to 1400 on Saturdays, with no working on Sundays, Bank and Public Holidays; the screener and crusher only being operated between 0700 and1800; use of the facility being restricted to waste and minerals recycling use; the office and gatehouse buildings being used solely for the purposes permitted; w aste types being restricted to those applied for (i.e. construction and demolition waste); the operation being undertaken in accordance with the submitted Dust and Noise Management Plan and being undertaken in accordance with its provisions; stockpiles being no higher than 0.5m below the top of the retaining walls in the aggregates storage bays; the development being undertaken in accordance with the submitted Flood Risk Assessment; the submission and agreement by the Waste Planning Authority of a detailed surface water and foul water drainage scheme within 3 months; the submission of a Drainage Scheme Verification Plan (dependant on the submission of further drainage details) within 6 months; no mobile machinery being operated above ground level on stockpiles or in elevated positions; machinery and vehicles being fitted with noise insulation and silencers and being maintained in accordance with manufacturer’s specifications; a copy of the permission and the approved plans being made available in the operator's site office; no trees being cut down; and no disturbance to or obstruction of the Public Right of Way.