CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Kent County Council
Kent Flood Risk and Water Management Committee, Monday 15 March 2021 at 2.00pm

Minutes of the meeting on 23 November 2020

Decided Committee 1 paper

Kent Flood Risk and Water Management Committee decided this item on Monday 15 March 2021. Below is the council's own wording, with the papers it was decided on.

Item1

Resolved

RESOLVED that the Minutes of the meeting held on 23 November 2020 are correctly recorded and that they be signed by the Chairman.
Word for word from the decision Kent published for this meeting. Source: democracy.kent.gov.uk

Follow this further

Built from Kent's papers

What the report saysPro

Report to Kent Flood Risk and Water Management Committee, 8 pages

KENT COUNTY COUNCIL

KENT FLOOD RISK MANAGEMENT COMMITTEE

MINUTES of a meeting of the Kent Flood Risk Management Committee held Online on Monday, 23 November 2020.

PRESENT: [name removed] (Chairman), [name removed], [name removed], [name removed], [name removed], [name removed], [name removed] (Ashford BC), [name removed] (Maidstone BC), [name removed] (Tonbridge and Malling BC), [name removed] (Tunbridge Wells (BC), [name removed] (KALC), [name removed] (Kent Fire and Rescue) and [name removed] (KALC)

ALSO PRESENT: [name removed] (Environment Agency).

IN ATTENDANCE: [name removed] (Flood and Water Manager), [name removed] (Resilience and Emergency Planning Manager), [name removed] (Asset Manager Drainage, Structures and Safety Barriers) and [name removed] (Democratic Services Officer)

UNRESTRICTED ITEMS

7. Minutes of the meeting on 9 March 2020 (Item 3)

RESOLVED that the Minutes of the meeting held on 9 March 2020 are correctly recorded and that they be signed by the Chairman.

8. Mitigating Surface Water Flood Risk on the Highway (Item 4)

(1) [name removed] introduced the report which had previously been considered by Cabinet on 12 October 2020. He said that Kent was experiencing intense rainfall events on an increasingly frequent basis, with recent rainstorms generating a volume and intensity of rain well beyond that of the design capability of highway drainage systems. Summer ‘flash flooding was also becoming an increasingly significant risk to the highway authority. For example, over 40 mm of rain had fallen in the Sittingbourne area on 15 August 2020 in the space of just 45 minutes. A perspective on the extraordinary nature of the event could be gained when noting that the average amount of rainfall in this region was just 56.3 mm for the entire month of August.

(2) [name removed] then said that the burden on Kent’s highway drainage systems could be exacerbated by many other factors. These included the age and condition of highway drainage systems (some systems were more than 100 years old and be operating beyond their original design life); operational issues arising from budget limitations for ongoing routine maintenance; capacity issues of drainage systems which were not under the control of the Highway Authority, including public sewers or private ditches and watercourses which they connected into; structural damage to drainage systems by third parties or site environs that could remain unnoticed until significant rainfall occurred; poor maintenance of drainage features in land adjacent to the highway; “Urban Creep” effects such as additional run-off onto highways from the paving of front gardens; and increases in the peak intensity of rainfall brought about by climate change.

(3) [name removed] said that KCC’s highway drainage systems were designed to drain water from the highway surface only and were not generally intended to be flood defences. They, nevertheless, still played a key role in managing local flood risk. They were usually designed to cope with a 1 in 5 - year event, such as a storm producing approximately 20 mm of rainfall in a one-hour period. In recent years, however, many occurrences had exceeded that design standard.

(4) When such events occurred, run-off often used the highway as a conduit to escape to lower ground, either as “overland flows” which following the topography or as “exceedance flows” where a drainage system was unable to cope. This could lead to highway flooding or property damage in a location that was remote from the original source of the flood water.

(5) [name removed] added that this often gave the impression that the run-off had originated solely from the highway and should therefore have been dealt with by the drainage system in that location. As a result, the Highway Authority was often blamed for flooding that may have been outside of its reasonable control.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Minutes of the meeting on 23 November 2020Minutes 8 pages DownloadRead as text

At this meeting

Whole meeting

On this subject at Kent

Search all
  1. Minutes of the meeting on 23 November 2020This decision
  2. Minutes of the Meeting held on 8 September 2026Decided
  3. Minutes of the meeting held on 23 July 2026Decided
  4. Minutes of the Meeting held on 22 July 2026Approved
  5. Minutes of the meeting held on 29 April 2026Decided
  6. Minutes of the meeting held on the 2 July 2026Decided

More from Kent Kent Flood Risk and Water Management Committee

All decisions
MeetingDecisionOutcome
10 Jun 2026 Minutes of the meeting on 04.03.26RESOLVED that the minutes of the meeting held on 4 March 2026 were an accurate record and that they be signed by the ... Decided Open
4 Mar 2026 Minutes of the meeting on 29.10.2025RESOLVED that the minutes of the meeting held on 29 October 2025 were an accurate record and that they be signed by t... Decided Open
4 Mar 2026 KCC Severe Weather Response Activity ReportRESOLVED to note the verbal update on Noted Open
4 Mar 2026 Met Office- Introduction PresentationRESOLVED to note the Met Office Presentation Noted Open
4 Mar 2026 SGN - Introduction and Water Ingress into the Gas Network PresentationRESOLVED to note the Southern Gas Network (SGN) presentation Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies